Common use of Restricted Activities and Required Precautions Clause in Contracts

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764-001‌ Special Provision to Item 764 Pump Station and Drainage System Cleaning For this project, Item 764, “Pump Station and Drainage System Cleaning,” of the Standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this Item are waived or changed hereby.

Appears in 3 contracts

Samples: Maintenance Improvement Contract, Highway Maintenance Improvement Contract, Highway Maintenance Improvement Contract

AutoNDA by SimpleDocs

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764This page intentionally left blank. THE STATE OF TEXAS THE COUNTY OF XXXXXX CONTRACT NO. 05161206 CONTROL 0000-001‌ Special Provision to Item 764 Pump Station 00-000 PROJECT RMC - 630027001 HIGHWAY SL0008 COUNTY XXXXXX HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT This agreement is made by and Drainage System Cleaning For this projectbetween the State of Texas, Item 764represented by the Executive Director, “Pump Station and Drainage System Cleaning,” Texas Department of Transportation, party of the Standard Specifications, is hereby amended with respect to the clauses cited belowfirst part, and no other clauses TEXAS DRAINAGE INC. , its executors, administrators, heirs, successors or requirements assigns, the Contractor, party of this Item are waived or changed herebythe second part.

Appears in 1 contract

Samples: Highway Maintenance Improvement Contract

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764This page intentionally left blank. THE STATE OF TEXAS THE COUNTY OF XXXXXX CONTRACT NO. 10161201 CONTROL 0000-001‌ Special Provision to Item 764 Pump Station 00-000 PROJECT RMC - 630573001 HIGHWAY SH0006 COUNTY BRAZORIA HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT This agreement is made by and Drainage System Cleaning For this projectbetween the State of Texas, Item 764represented by the Executive Director, “Pump Station and Drainage System Cleaning,” Texas Department of Transportation, party of the Standard Specifications, is hereby amended with respect to the clauses cited belowfirst part, and no other clauses OPPORTUNITY EXCAVATION/CON- CRETE, LLC , its executors, administrators, heirs, successors or requirements assigns, the Contractor, party of this Item are waived or changed herebythe sec- ond part.

Appears in 1 contract

Samples: Maintenance Improvement Contract

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764This page intentionally left blank. THE STATE OF TEXAS THE COUNTY OF XXXXXX CONTRACT NO. 03171205 CONTROL 0000-001‌ Special Provision to Item 764 Pump Station 00-000 PROJECT BPM - 631323001 HIGHWAY IH0069 COUNTY XXXXXX HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT This agreement is made by and Drainage System Cleaning For this projectbetween the State of Texas, Item 764represented by the Executive Director, “Pump Station and Drainage System Cleaning,” Texas Department of Transportation, party of the Standard Specifications, is hereby amended with respect to the clauses cited belowfirst part, and no other clauses PLANT FUEL, LLC , its executors, administrators, heirs, successors or requirements assigns, the Contractor, party of this Item are waived or changed herebythe second part.

Appears in 1 contract

Samples: Highway Maintenance Improvement Contract

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764This page intentionally left blank. THE STATE OF TEXAS THE COUNTY OF XXXXXX CONTRACT NO. 06161205 CONTROL 0000-001‌ Special Provision to Item 764 Pump Station 00-000 PROJECT RMC - 630260001 HIGHWAY US0290 COUNTY XXXXXX HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT This agreement is made by and Drainage System Cleaning For this projectbetween the State of Texas, Item 764represented by the Executive Director, “Pump Station and Drainage System Cleaning,” Texas Department of Transportation, party of the Standard Specifications, is hereby amended with respect to the clauses cited belowfirst part, and no other clauses DBI SERVICES, LLC , its executors, administrators, heirs, successors or requirements assigns, the Contractor, party of this Item are waived or changed herebythe second part.

Appears in 1 contract

Samples: Maintenance Improvement Contract

AutoNDA by SimpleDocs

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764THE STATE OF TEXAS THE COUNTY OF XXXXXX CONTRACT NO. 04161203 CONTROL 0000-001‌ Special Provision to Item 764 Pump Station 00-000 PROJECT RMC - 630021001 HIGHWAY SH0006 COUNTY GALVESTON HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT This agreement is made by and Drainage System Cleaning For this projectbetween the State of Texas, Item 764represented by the Executive Director, “Pump Station and Drainage System Cleaning,” Texas Department of Transportation, party of the Standard Specifications, is hereby amended with respect to the clauses cited belowfirst part, and no other clauses DEVTEX INC. , its executors, administra- tors, heirs, successors or requirements assigns, the Contractor, party of this Item are waived or changed herebythe second part.

Appears in 1 contract

Samples: Maintenance Improvement Contract

Restricted Activities and Required Precautions. Do not discharge onto the ground or surface waters any pollutants such as chemicals, raw sewage, fuels, lubricants, coolants, hydraulic fluids, bitumens, or any other petroleum product. Operate and maintain equipment on site in a manner as to prevent actual or potential water pollution. Manage, control, and dispose of litter on site such that no adverse impacts to water quality occur. Prevent dust from creating a potential or actual unsafe condition, public nuisance, or condition endangering the value, utility, or appearance of any property. Wash out concrete trucks only in approved contained areas. Use appropriate controls to minimize the offsite transport of suspended sediments and other pollutants if it is necessary to pump or channel standing water (i.e. dewatering). Prevent discharges that would contribute to a violation of Xxxxxxx Aquifer Rules, water quality standards, the impairment of a listed water body, or other state or federal law. Section 506.4.4., “Installation, Maintenance, and Removal Work.” The first paragraph is voided and replaced by the following. Perform work in accordance with the SWP3, and according to the manufacturers’ guidelines. Install and maintain the integrity of temporary erosion and sedimentation control devices to accumulate silt and debris until soil disturbing activities are completed and permanent erosion control features are in place or the disturbed area has been adequately stabilized as determined by the Engineer. Section 506.4.5., “Monitoring and Documentation,” is voided and not replaced. Section 506.6.5.2., “Maintenance Earthwork for Erosion and Sediment Control for Cleaning and/or Restoring Control Measures,” is voided and replaced by the following: Earthwork needed to remove and obliterate of erosion-control features will not be paid for directly but is subsidiary to pertinent Items unless otherwise shown on the plans. Sprinkling and rolling required by this Item will not be paid for directly but will be subsidiary to this Item. 764This page intentionally left blank. THE STATE OF TEXAS THE COUNTY OF XXXXXX CONTRACT NO. 05160101 CONTROL 6294-001‌ Special Provision to Item 764 Pump Station 60-001 PROJECT RMC - 629460001 HIGHWAY SH0056 COUNTY XXXXXXX HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT This agreement is made by and Drainage System Cleaning For this projectbetween the State of Texas, Item 764represented by the Executive Director, “Pump Station and Drainage System Cleaning,” Texas Department of Transportation, party of the Standard Specifications, is hereby amended with respect to the clauses cited belowfirst part, and no other clauses WEST TEXAS REBAR PLACERS INC. , its executors, administrators, heirs, successors or requirements assigns, the Contractor, party of this Item are waived or changed herebythe second part.

Appears in 1 contract

Samples: Maintenance Improvement Contract

Time is Money Join Law Insider Premium to draft better contracts faster.