Switching System Hierarchy and Trunking Requirements For purposes of routing PNG traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to PNG, the subtending arrangements between PNG Tandem Switches and PNG End Office Switches shall be the same as the Tandem/End Office subtending arrangements that PNG maintains for the routing of its own or other carriers’ traffic.
Combinations and Split-ups of Receipts Upon surrender of a Receipt or Receipts at the Depositary Office or such other office as the Depositary may designate for the purpose of effecting a split-up or combination of Receipts, subject to the terms and conditions of this Deposit Agreement, the Depositary shall execute and deliver a new Receipt or Receipts in the authorized denominations requested evidencing the same aggregate number of Depositary Shares evidenced by the Receipt or Receipts surrendered.
File Format Standard Registry Operator (optionally through the CZDA Provider) will provide zone files using a subformat of the standard Master File format as originally defined in XXX 0000, Section 5, including all the records present in the actual zone used in the public DNS. Sub-format is as follows: Each record must include all fields in one line as: <domain-name> <TTL> <class> <type> <RDATA>. Class and Type must use the standard mnemonics and must be in lower case. TTL must be present as a decimal integer. Use of /X and /DDD inside domain names is allowed. All domain names must be in lower case. Must use exactly one tab as separator of fields inside a record. All domain names must be fully qualified. No $ORIGIN directives. No use of “@” to denote current origin. No use of “blank domain names” at the beginning of a record to continue the use of the domain name in the previous record. No $INCLUDE directives. No $TTL directives. No use of parentheses, e.g., to continue the list of fields in a record across a line boundary. No use of comments. No blank lines. The SOA record should be present at the top and (duplicated at) the end of the zone file. With the exception of the SOA record, all the records in a file must be in alphabetical order. One zone per file. If a TLD divides its DNS data into multiple zones, each goes into a separate file named as above, with all the files combined using tar into a file called <tld>.zone.tar.
Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.
Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.
Design Criteria and Standards All Projects/Services shall be performed in accordance with instructions, criteria and standards set forth by the Director.
Unbundled Network Element Combinations 5.1. Unbundled Network Element Combinations shall include: 1) Enhanced Extended Links (EELs); 2) UNE Loops/Special Access Combinations; 3) Loop/Port Combinations; and 4)
Switching and Tagging Rules The Developer and Connecting Transmission Owner shall each provide the other Party a copy of its switching and tagging rules that are applicable to the other Party’s activities. Such switching and tagging rules shall be developed on a nondiscriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.
Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.
Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.