Common use of Rights and Remedies of the Judicial Council Clause in Contracts

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 3 contracts

Samples: Judicial Council Standard Agreement, Standard Agreement, Standard Agreement

AutoNDA by SimpleDocs

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council JUDICIAL COUNCIL immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council JUDICIAL COUNCIL may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial CouncilJUDICIAL COUNCIL’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) . If the Judicial Council JUDICIAL COUNCIL terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council JUDICIAL COUNCIL may acquire from third parties, under the terms and in the manner the Judicial Council JUDICIAL COUNCIL considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council JUDICIAL COUNCIL for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council JUDICIAL COUNCIL or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) . In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council JUDICIAL COUNCIL with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council JUDICIAL COUNCIL Data, Judicial Council JUDICIAL COUNCIL Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council JUDICIAL COUNCIL shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial CouncilJUDICIAL COUNCIL’s termination is not based on a Default, Judicial Council JUDICIAL COUNCIL shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial CouncilJUDICIAL COUNCIL’s termination notice.

Appears in 2 contracts

Samples: Standard Agreement, Standard Agreement

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-partially- completed Deliverables), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: Web Based Hosted Call Center Application Agreement

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner manner, the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities Council for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: Standard Agreement

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor Consultant shall notify the Judicial Council immediately if Contractor Consultant is in Default, or if a Third Third-Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor Consultant is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to ContractorConsultant, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and ContractorConsultant; (ii) require Contractor Consultant to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) . If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor Consultant shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor Consultant shall continue the Work not terminated hereunder. (c) . In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor Consultant shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Consultant Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor Consultant for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: Consulting Services Agreement

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Third-Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity.equity.‌ (b) If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council JCC may acquire from third parties, under the terms and in the manner the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council JCC Data, Judicial Council JCC Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council JCC shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial CouncilJCC’s termination is not based on a Default, Judicial Council JCC shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial CouncilJCC’s termination notice.

Appears in 1 contract

Samples: Managed Service Desk Support

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities Council for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: Standard Agreement

AutoNDA by SimpleDocs

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) If the Judicial Council terminates Councilterminates this Agreement or any Statement of Work Service in whole or in part for cause, the Judicial Council may acquire from third fromthird parties, under the terms and in the manner manner, the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work Service not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or Agreementor the applicable Statement of WorkService, Contractor shall promptly provide the Judicial Council with Councilwith all originals and copies of the Deliverables Requirements (including: (i) any partially-completed Deliverables Requirements and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables Requirements or partially-completed DeliverablesRequirements), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of WorkService, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables Requirements completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: Data Center Colocation Services

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial CouncilJBE’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) . If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Council or the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) . In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council JBE Data, Judicial Council JBE Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial CouncilJBE’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: Information Systems Security Outreach Program

Rights and Remedies of the Judicial Council. (a) All remedies provided for in this Agreement may be exercised individually or in combination with any other available remedy. Contractor shall notify the Judicial Council immediately if Contractor is in Default, or if a Third Party claim or dispute is brought or threatened that alleges facts that would constitute a Default under this Agreement. If Contractor is in Default, the Judicial Council may do any of the following: (i) withhold all or any portion of a payment otherwise due to Contractor, and exercise any other rights of setoff as may be provided in this Agreement or any other agreement between a Judicial Branch Entity and Contractor; (ii) require Contractor to enter into nonbinding mediation; (iii) exercise, following notice, the Judicial Council’s right of early termination of this Agreement as provided herein; and (iv) seek any other remedy available at law or in equity. (b) If the Judicial Council terminates this Agreement or any Statement of Work in whole or in part for cause, the Judicial Council may acquire from third parties, under the terms and in the manner manner, the Judicial Council considers appropriate, goods or services equivalent to those terminated, and Contractor shall be liable to the Judicial Council for any excess costs for those goods or services. Notwithstanding any other provision of this Agreement, in no event shall the excess cost to the Judicial Branch Entities for such goods and services be excluded under this Agreement as indirect, incidental, special, exemplary, punitive or consequential damages of the Judicial Council or Judicial Branch Entities. Contractor shall continue the Work not terminated hereunder. (c) In the event of any expiration or termination of this Agreement or the applicable Statement of Work, Contractor shall promptly provide the Judicial Council with all originals and copies of the Deliverables (including: (i) any partially-completed Deliverables and related work product or materials; and (ii) any Contractor Materials, Third Party Materials, and Developed Materials comprising such Deliverables or partially-completed Deliverables), Confidential Information, Judicial Council Data, Judicial Council Materials, and all portions thereof, in its possession, custody, or control. In the event of any termination of this Agreement or a Statement of Work, the Judicial Council shall not be liable to Contractor for compensation or damages incurred as a result of such termination; provided that if the Judicial Council’s termination is not based on a Default, Judicial Council shall pay any fees due under this Agreement for Deliverables completed and accepted as of the date of the Judicial Council’s termination notice.

Appears in 1 contract

Samples: It Procurement Agreement