Common use of Road Surfaces Clause in Contracts

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

AutoNDA by SimpleDocs

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade and compact crushed rock surfacing on all roads used Toll Road. PURCHASER may use rock from the STATE stockpile located in the SW¼ NW¼, Section 5, T2S, R7W for hauling under this contractmaintenance on STATE roads. In addition Prior to forest road maintenance required under this contractany rock spreading, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the section titled, "Felling," within the timber sale area. All timber cut in accordance with the requirements of Project Nos. 1 and 2 in the section titled, "Project Work." Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall The stream buffers are not have any blue paint on the timber sale areaposted.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and compact crushed rock surfacing on all roads used BSM Road from the South Fork Xxxxx junction to Point A. PURCHASER may use rock from the STATE stockpile shown on Exhibit A for hauling under this contractmaintenance on STATE roads. In addition Prior to forest road maintenance required under this contractany rock spreading, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale area. All trees within “Right-of-Way Boundary” signs, marked with blue paint, or felled within the clearing limits specified in Exhibit B between the points specified in Project Nos. 1 and 2 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and pink flagging. The boundary along BSM Road between Areas 3 and 4, 5 and 7, and 7 and 8 are posted with "Area Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used the following road segments: Rogers Road, Plantation Road, the haul route over Xxxxxxx ownership, and Xxxxx Road. PURCHASER may use 500 cubic yards of rock from the STATE stockpile located in the SE¼ NE¼, Section 13, T2N, R5W, X.X., for hauling under this contractmaintenance on STATE roads. In addition Prior to forest road maintenance required under this contractany rock spreading, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingobtain approval from STATE. Log hauling shall not be allowed from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Areas I and II. All timber sale area. within Area III R/W. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale areaArea III R/W is posted with "Right-of-Way Boundary" signs. The boundary between Areas I and II is posted with "Area Boundary" signs.

Appears in 1 contract

Samples: Timber Sale Agreement

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the timber sale area. All timber within Area II R/W. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale areaArea II R/W is posted with "Right-of-Way Boundary" signs.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER shall obtain crushed rock and pit-run rock from a commercial source or other locations approved by STATE for maintenance on roads. PURCHASER may use pit-run rock from the conclusion of log hauling operationsSTATE rock pit located in the SE¼ NW¼, Section 14, T1N, R10W, for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," "Thinning Specifications," and “Project Work,” within the timber sale areaareas. Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any Stream buffers are posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations from Area 4, PURCHASER shall close the road between Points A and B according to the specifications in Exhibit K. At the conclusion of log hauling operations, PURCHASER shall grade process crushed rock surfacing on all the following road segments: Xxxxxx Road. Processing shall consist of loosening the existing road rock to a minimum depth of 3 inches and reprocessing according to the crushed rock “Compaction and Processing Requirements” in Exhibit C. PURCHASER may use rock from the STATE stockpile located in the XX0/0 XX0/4, Section 21, T3N, R8W, X.X., for maintenance on STATE roads used for hauling under this contractsurfaced with crushed rock. In addition Prior to forest road maintenance required under this contractany rock spreading, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale areaareas. All trees within “Right-of-Way Boundary” signs, or trees resulting from the clearing limits required in Exhibit B, between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is Areas 1, 4, and 5 are posted with "Timber Sale Boundary" signs, pink flagging, and red paint. Areas 2 and 3 are posted with “Timber Sale Boundary” signs and pink flagging. Area right-of-way is posted with "Right-of-Way Boundary" signs. The boundaries between Areas 1 and 2 and between Areas 3A and 3B are posted with "Area Boundary" signs. Stream buffers are posted with “Buffer Zone” signs and blue flagging. PURCHASER shall not have any blue red or yellow paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing apply dust abatement material on all the haul roads used for hauling under this contractwhen PURCHASER’s activities cause excessive dust, or when instructed by STATE. In addition Water is the dust abatement material to forest road maintenance required under this contractbe applied, PURCHASER shall protect unless otherwise approved in writing by STATE. Due to the Hill County Road shown on Exhibit A. Protection shall consist potential lack of adequate water sources, STATE may require other measures necessary to prevent damage by excessive dust. These measures may include any or all of the operationsfollowing: Limit speed of log trucks, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion restrict number of operations or arrange with the county road department for final gradingloads hauled per day, restrict consecutive haul days, and/or temporary suspension of hauling. Log hauling from Area I shall not be allowed from November June 1 through April 30September 1, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber unmarked conifer trees and snags greater than 5 inches DBH within Areas I, II, and VI. All lodgepole pine greater than 5 inches DBH within Area III. All lodgepole pine greater than 8 inches DBH within Areas IV and V. All trees and snags marked with blue paint within the timber sale areaareas. All trees within “Right-of-Way Boundary” signs. Boundary markings are as follows: The Areas I, II, III, IV, and VI are posted with “Timber Sale Boundary” signs, fluorescent orange flagging, and fluorescent orange paint. All exclusion areas within the timber sale area is areas are posted with “Timber Sale Boundary” signs, fluorescent orange flagging, and fluorescent orange paint. The boundaries between Areas II and III, II and IV, II and V, III and IV, and III and V are posted with “Area Boundary” signs, blue flagging, and yellow paint. All road rights-of-way are posted with "Timber Sale Boundary" signs and pink flaggingRight-of-Way Boundary"signs. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of project work and at the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on in accordance with Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing by STATE. B. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Area 2. All timber sale areawithin Areas 1, 3, and 4. All timber within Areas 5 and 6 R/W. Boundary markings are as follows: The timber sale area is Areas 1 through 4 are posted with "Timber Sale Boundary" signs, pink flagging, and blue paint. Area 5 R/W is posted with "Right-of-Way Boundary" signs and pink flaggingorange paint. Area 6 R/W is posted with "Right-of-Way Boundary" signs and blue paint. The boundaries between Areas 1, 2, 3, and 4 are posted with "Area Boundary" signs. Green Tree Retention Areas are posted with "Wildlife Tree Boundary" signs and blue paint. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed spread, process, and/or compact 90 cubic yards of 1½”-0” rock surfacing for normal wear replacement on all roads used for hauling under this contract. In addition the following road segments: A to forest road maintenance required under this contractA1, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary A1 to prevent damage by the operationsA2, A2 to A3 from Station 0+00 to Station 6+00, and A1 to keep the road passable during operating periodsA7 from Station 0+00 to Station 25+00. PURCHASER Required replacement rock shall grade the road upon completion of operations or arrange with the county road department for final gradingbe obtained from a STATE approved commercial rock pit. Log hauling shall not be allowed on unsurfaced roads from November October 1 through April 30May 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All Xxxxxxx-fir and hardwood timber within the timber sale areaArea I. All Xxxxxxx-fir trees marked with red paint within Area II. All red alder trees within Area II greater than 8 inches DBH. Boundary markings are as follows: The timber sale area is exterior boundaries of Areas I and II, and the reserve areas are posted with "Timber Sale Boundary" signs and signs, fluorescent pink flagging, and fluorescent red paint. The boundaries between Areas I and II, and the Reserve Areas are marked with “Area Boundary” signs, blue and white striped flagging, and fluorescent red paint. PURCHASER shall not have any blue fluorescent red paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing apply dust abatement material on all roads used for hauling under this contractthe haul route when PURCHASER's activities cause excessive dust, or when instructed by STATE. In addition Water is the dust abatement material to forest road maintenance required under this contractbe applied, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage unless otherwise approved in writing by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingSTATE. Log hauling shall not be allowed from November April 1 through April 30June 15, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber unmarked conifer trees and snags greater than 5 inches DBH within the timber sale area. All trees and snags marked with blue paint within the timber sale area. All trees within “Right-of-Way Boundary” signs or marked with blue paint between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs signs, fluorescent orange flagging, and pink fluorescent orange paint. All road rights-of-way are posted with "Right-of-Way Boundary" signs. The exclusion area within the timber sale area is posted with “Timber Sale Boundary” signs, fluorescent orange flagging, and fluorescent orange paint. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operationsSTATE stockpile located in the SW¼ NW¼, Section 18, T1N R6W for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingobtain approval from STATE. Log hauling shall not be allowed on Archers Road west of the Portland Xxxxx Road junction from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. The boundary between Areas 1 and 2 is posted with "Area Boundary" signs. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and compact crushed rock surfacing on the following road segments: On all roads used for hauling under this contract. , in accordance with the specifications in Exhibit B. In addition to forest road maintenance required under this contract, PURCHASER no track-mounted machinery shall cross any bridge without first providing a protective barrier between the tracks and the bridge surface. The barrier shall be adequate to protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing by STATEbridge surface. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within Areas 1, 2, 6a, and 7. All unmarked trees within Area 6b. All timber within Areas 3, 4, and 5. All timber within Area 8 R/W. Privately owned right-of-way timber near Point 2F, shown on Exhibit A, is not designated timber. It shall be roadside decked after being bucked and limbed, and is not to be removed by the timber sale areaPURCHASR. Boundary markings are as follows: The timber sale area is Areas 1, 2, 3, 4, 5, 6a, 6b, and 7 are posted with "Timber Sale Boundary" signs and signs, pink flagging, and blue paint. Area 8 R/W is posted with "Right-of-Way Boundary" signs. Marked trees are any trees with blue paint marks on the trunk below xxxxx height. The Green Tree Retention Areas are posted with "Wildlife Tree” or “Timber Sale Boundary" signs, pink flagging, and blue paint. The boundaries between Areas 2 and 3, 6b and 7, and 6a and 6b are posted with “Area Boundary” signs. Posted stream buffers within Areas 2, 4, 5, 6a, and 6b are posted with “Buffer Zone” signs, pink flagging, and blue paint. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Agreement

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use pit-run rock from the conclusion of log hauling operationsSTATE pit located in the XX0/0 XX0/4, Section 13, T1N, R8W, X.X., for road maintenance. PURCHASER shall obtain crushed rock from a commercial source acceptable to STATE for road maintenance on Cedar Butte Road and Wolf Creek Road (Station 0+00 to 21+15). Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contractobtain approval from STATE. In addition to forest road maintenance required under this contract, PURCHASER shall protect apply dust abatement material on the Hill County Road portion of road between Points A and B, as shown on Exhibit A. Protection shall consist of measures necessary A, from Station 0+00 to prevent damage Station 35+00, when PURCHASER’s activities cause excessive dust, or when instructed by STATE. Lignin Sulfonate is the operations, and dust abatement material to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30applied, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the timber sale areaareas. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any The boundaries between adjacent areas are posted with "Area Boundary" signs. Stream buffers are posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and compact crushed rock surfacing on all rocked roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing by STATElog hauling. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Areas 3, 4, and 4A. All timber sale areawithin Areas 1, 2, and 5. All timber within Areas 6 and 7 R/W. All Xxxxxxx-fir timber within Patch Cut Areas in Area 3A. Boundary markings are as follows: The timber sale area is Areas 1, 2, 3, 3A, 4, 4A, and 5 are posted with "Timber Sale Boundary" signs and pink flagging. Areas 6 and 7 R/W are posted with "Right-of-Way Boundary" signs. The boundaries between Areas 3 and 3A and Areas 4 and 4A are posted with "Area Boundary" signs. Green Tree Retention Areas are posted with "Timber Sale Boundary" signs or “Wildlife Tree” signs and pink flagging. Patch Cut Areas in Area 3A are posted with “Forest Disease Boundary” signs, pink flagging, and blue paint. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use crushed rock from the conclusion of log hauling operationsSTATE stockpile located in the SE¼ NW¼, Section 19, T1N, R9W, X.X., for maintenance on STATE roads surfaced with crushed rock. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periodsobtain approval from STATE. PURCHASER shall grade may use jaw-run rock from the STATE stockpile located in the SE¼ NW¼, Section 19, T1N, R9W, X.X., for road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing by STATEapproaches. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any The boundaries between Areas 1 and 2 are posted with "Area Boundary" signs. Streams, seeps, and recreation protection zones are posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use crushed rock from the conclusion of log hauling operationsSTATE stockpile located in XX0/0, XX0/4, Section 29, T2N, R9W for maintenance on STATE roads surfaced with crushed rock. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": ." All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale areaareas. All trees within “Right-of-Way Boundary” signs between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any The boundaries between Areas 1a and 1b and 2a and 2b are posted with "Area Boundary" signs. Stream buffers are posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing STATE stockpile shown on all Exhibit A for maintenance on surfaced roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary Prior to prevent damage by the operationsany rock spreading, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," within the timber sale areaareas. All trees within “Right-of-Way Boundary” signs or marked with blue paint between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and pink flagging. The stream buffer that meets the western boundary of Area 1 is posted with "Buffer Zone" signs pink flagging. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used the following road segments: Toll Road from Point E to Xxxxx River County Road. PURCHASER may use rock from the STATE stockpile located in the NE¼ NE¼, Section 16, T2S, R7W, X.X. for hauling under this contract3”-0,” or the SE¼ NW¼, Section 15, T2S, R7W, X.X. for 2”-0” crushed rock for maintenance on Toll Road, Blue Bus Road, and Spur 17 Road. In addition Prior to forest road maintenance required under this contractany rock spreading, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on The boundaries between Areas 1, 2, 3, 4, 5, and 6 are posted with "Area Boundary" signs and pink flagging. The Green Tree Retention Area is posted with "Area Boundary" signs and pink flagging. Stream buffers in the timber sale areaarea are posted with "Buffer Zone" signs and pink flagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition road segments to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage be determined by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingSTATE. Log hauling shall not be allowed from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber" and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the Areas I, II, III, and IV. All timber sale area. within Area V R/W. Boundary markings are as follows: The timber sale area is Areas I, II, III, and IV are posted with "Timber Sale Boundary" signs and pink and black flagging. Area V R/W is posted with "Right-of-Way Boundary" signs. The boundaries between Areas I, II, III, and IV are posted with "Area Boundary" signs. PURCHASER shall not have any blue lime green paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) . Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER shall be excluded from the conclusion normal road maintenance responsibility on the following roads: Those roads shown on Exhibit A as "Existing Roads – State Maintained." However, should it be necessary during the period of log hauling operationsthis contract for STATE to discontinue normal or extraordinary maintenance of such roads, then, upon notification from STATE, PURCHASER shall grade crushed rock surfacing on perform all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operationssuch maintenance, and STATE shall modify the contract as specified in Section 27. The following road segments shall be closed prior to keep October 15, annually: At Points A, G, I, and N. These roads shall be closed by constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the construct waterbars as directed by STATE. The above listed road segments may be reopened after June 1 upon completion of operations or arrange with the county road department for final gradingwritten approval by STATE. Log hauling shall not be allowed on dirt spurs from November 1 October 15 through April 30June 1, unless otherwise approved in writing by STATE. Hauling from Point A to B will not be seasonally restricted if the road is rocked and additional drainage is added according to the specifications in Exhibit F. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale area.AREA

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Areas I, II, and III. All timber sale area. within Area IV R/W. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale areaArea IV R/W is posted with "Right-of-Way Boundary" signs.

Appears in 1 contract

Samples: Timber Sale Agreement

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition road segments to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage be determined by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingSTATE. Log hauling shall not be allowed from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber" and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the Areas I, II, and III. All timber sale area. within Area IV R/W. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any Area IV R/W is posted with "Right-of-Way Boundary" signs. The boundaries between Areas I, II, and III are posted with "Area Boundary" signs. A no harvest area around the Type F stream, shown on Exhibit A, is posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periodssegments to be determined by STATE. PURCHASER shall grade apply dust abatement material on the Xxxxxxx forest road upon completion of operations from Point Q to Point R when PURCHASER's activities cause excessive dust, or arrange with when instructed by STATE. Lignon Sulfonate is the county road department for final gradingdust abatement material to be applied, unless otherwise approved in writing by STATE. Log hauling shall not be allowed in Areas I and III from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Areas I, II, and III. All timber sale area. within Area IV R/W. Boundary markings are as follows: The timber sale area is Areas I, II, and III are posted with "Timber Sale Boundary" signs and pink and black flagging. PURCHASER shall not have any blue paint on the timber sale areaArea IV R/W is posted with "Right-of-Way Boundary" signs. The boundaries between Areas I, II, and III are posted with "Area Boundary" signs.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operationsPURCHASER shall obtain rock from a commercial source or other location approved by STATE for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingobtain approval from STATE. Log hauling shall not be allowed between Points C to D from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale area. All trees resulting from the clearing limits and the sidecast pullback required in Exhibit B between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any The boundary between Areas 2a and 2b is posted with "Area Boundary" signs. The stream buffers are posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operationsSTATE stockpile located in the SW¼ SW¼, Section 5, T2N, R8W, X.X., for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale area. All trees within “Right-of-Way Boundary” signs or marked with blue paint between the points specified in Project Nos. 1 and 2 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. The boundary between Areas 1 and 2 is posted with "Area Boundary" signs. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

AutoNDA by SimpleDocs

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use crushed rock from the conclusion of log hauling operationsSTATE stockpile shown on Exhibit A for maintenance on STATE crushed rock surfaced roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the section titled, "Felling," within the timber sale area. All timber cut in accordance with the requirements of Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint Stream buffers on the timber sale areaAreas 1 and 2 are posted with “Buffer Zone” signs and pink flagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operationsSTATE stockpile shown on Exhibit A for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the timber sale area. All trees within “Right-of-Way Boundary” signs or marked with blue paint between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. The boundary between Areas II and III is posted with "Area Boundary" signs. The boundary between Area IA and Area IB is unposted and is adjacent to the abandoned road. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed spread 60 cubic yards of 1½"-0" rock surfacing for damage caused by yarding logs across 7000 Road on all roads used for hauling under this contract. In the following road segments: 7000 Road segment A to D. This rock is in addition to forest the 150 yards specified in Section 68 and Exhibit C. PURCHASER shall be excluded from the normal road maintenance required under responsibility on the following roads: Roads shown on Exhibit A as Existing Roads – State Maintained. However, should it be necessary during the period of this contractcontract for STATE to discontinue normal or extraordinary maintenance of such roads, then, upon notification from STATE, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operationsperform all such maintenance, and to keep STATE shall modify the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingcontract as specified in Section 27. Log hauling shall not be allowed on road segment A to B from November 1 October 15 through April 30May 15, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber unmarked trees within the timber sale area. All unmarked trees within the right-of-way boundary. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs signs, red flagging, and pink red paint. The road right-of-way is posted with “Road Right-of-Way” signs, red flagging, and red paint. PURCHASER shall not have any blue red, blue, or black paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operationsSTATE stockpiles shown on Exhibit A for maintenance on STATE roads surfaced with crushed rock. Pit-run rock is available from the rock pit shown on Exhibit A for maintenance on all other roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber" and "Access": All timber cut in accordance with the specifications in the sections titled, "Felling," within the timber sale areaareas. Boundary markings are as follows: The timber sale area is areas are posted with red "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on Stream buffers within the timber sale areaareas are posted with "Buffer Zone" signs and blue flagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition to forest the following road maintenance required under this contract, PURCHASER shall protect segments: To be determined by STATE at the Hill County Road shown on Exhibit A. Protection shall consist conclusion of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradinglog hauling. Log hauling shall not be allowed from November 1 through April 30March 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber" and ": Thinning Specifications:” All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within Area II. All unmarked trees within Area I. All timber within the timber sale area. Area III R/W. Boundary markings are as follows: The timber sale area is Areas I and II are posted with "Timber Sale Boundary" signs and pink and black flagging. PURCHASER shall not have any blue paint on the timber sale areaArea III R/W is posted with "Right-of-Way Boundary" signs. The boundary between Areas I and II is posted with "Area Boundary" signs.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER shall be excluded from the conclusion normal road maintenance responsibility on the following roads: Roads shown as “STATE maintained” on Exhibit A. However, should it be necessary during the period of log hauling operationsthis contract for STATE to discontinue normal or extraordinary maintenance of such roads, then, upon notification from STATE, PURCHASER shall grade crushed rock surfacing on perform all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operationssuch maintenance, and STATE shall modify the contract as specified in Section 27. The following road segments shall be closed prior to keep October 1: 1820 Road at Point B. These roads shall be closed by constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the road construct waterbars as directed by STATE and specified in Exhibit D. Road segment Point B to Point D may remain open upon completion of operations or arrange written approval by STATE and compliance with the county road department for final grading. requirements stipulated in Exhibit E. Log hauling shall not be allowed from November October 1 through April 30May 1, unless otherwise approved except upon written approval by STATE and compliance with the requirements stipulated in writing by STATE. Exhibit E. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs signs, red flagging, and pink flaggingred paint. PURCHASER shall not have any blue red or black paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of project work and also log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition Processing and compaction shall be done in accordance with Exhibit B, “Compaction and Processing Requirements.” STATE shall require the application of water to forest achieve optimum conditions for rock processing and compaction. The following road maintenance required under this contractsegments shall be closed prior to November 1, PURCHASER annually: Dirt portions of Road Segments 4C to 4D and 6A to 6B. These roads shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage be closed by the operations, and to keep constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the road construct waterbars as specified in Exhibit H. Road segments above may be reopened after May 31, annually, upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing written approval by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber" and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the Areas 2 and 3. All timber sale areawithin Areas 1, 4, 5, and 6. All timber within Area 7 R/W. Boundary markings are as follows: The timber sale area is Areas 1 through 6 are posted with "Timber Sale Boundary" signs and signs, pink flagging, and blue paint. Area 7 R/W is posted with "Right-of-Way Boundary" signs. The boundaries between Areas 1 and 2, 1 and 3, 3 and 4, and 3 and 5 are posted with “Area Boundary” signs. The Green Tree Retention Areas are posted with "Wildlife Tree" signs, pink flagging, and blue paint. Type N stream buffers in Areas 1, 5, and 6 are posted with “Buffer Zone” signs, pink flagging, and blue paint. Type F stream buffers are posted with “Timber Sale Boundary” signs, pink flagging, and blue paint. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use crushed rock from the conclusion of log hauling operationsSTATE stockpile shown on Exhibit A for maintenance on STATE roads surfaced with crushed rock. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," within the timber sale area. All trees felled in accordance with the requirements specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed spread, process, and/or compact 108 cubic yards of 1½”-0” rock surfacing for normal wear replacement on all roads used for hauling under this contractthe following road segment: A to B. Required replacement rock shall be obtained from a STATE approved commercial rock quarry. In addition The following road segment shall be closed prior to forest October 1, annually: B to E. This road maintenance required under this contract, PURCHASER segment shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage be closed by the operations, and to keep constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the construct waterbars as directed by STATE and as specified in Exhibit D. The above listed road segment may be reopened after May 31 upon completion of operations or arrange with the county road department for final gradingwritten approval by STATE. Log hauling on unsurfaced roads shall not be allowed from November October 1 through April 30May 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber within the timber sale area. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs, fluorescent pink flagging, and fluorescent red paint. Private right-of-way is posted with "Private Right-of-Way Boundary" signs and fluorescent pink flagging. Type F and N stream buffers are posted with "Buffer Zone" signs, fluorescent pink flagging, and fluorescent red paint. PURCHASER shall not have any blue fluorescent red paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all roads used for hauling under this contract. In addition to forest the following road maintenance required under this contractsegments: Xxxxxxxx Road, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operationsSunday Creek Road, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingNorth Fork Xxxxx River Road. Log hauling shall not be allowed from November 1 through April 3015, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section section(s) titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Areas I, II, and III. All timber sale area. within Area IV R/W. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale areaArea IV R/W is posted with "Right-of-Way Boundary" signs. The boundary between Areas I and II is posted with "Area Boundary" signs.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operationsSTATE stockpile located in Section 11, T2N, R9W as shown on Exhibit A for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final gradingobtain approval from STATE. Log hauling shall not be allowed on the Miami River Forest Road from Point D to Miami-Xxxxx County Road from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale areaareas. All trees within “Right-of-Way Boundary” signs or marked with blue paint between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is Areas 1, 2, and 3 are posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use rock from the conclusion of log hauling operationsSTATE stockpile located in the XX0/0 XX0/4, Section 21, T3N, R8W for maintenance on STATE roads. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section section(s) titled, "Reserved Timber": ." All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the timber sale area. All trees within “Right-of-Way Boundary” signs between the points specified in Project No. 1 in the section titled, “Project Work.” Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any The boundary between Areas 1 and 2 is posted with "Area Boundary" signs. The stream buffers are posted with “Buffer Zone” signs and blue paint on the timber sale areaflagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At PURCHASER may use crushed rock from the conclusion of log hauling operationsSTATE stockpiles as shown on Exhibit A for maintenance on STATE crushed rock surfaced roads. Maintenance rock for pit-run roads is available at rock pits designated as pit-run on Exhibit A. Prior to any rock spreading, PURCHASER shall grade crushed rock surfacing on all roads used for hauling under this contract. In addition to forest road maintenance required under this contract, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed obtain approval from November 1 through April 30, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within Area 1. All Xxxxxxx-fir and alder timber within Areas 2, 3, 4, 5, 6, 7, and 8. All timber cut in accordance with the timber sale arearequirements of Project Nos. 1 and 2. Boundary markings are as follows: The timber sale area is posted with "Timber Sale Boundary" signs and pink flagging. PURCHASER shall not have any blue paint The boundary along Xxxxxx Road between Areas 1 and 2 is posted with "Area Boundary" signs. Stream buffers on the timber sale areaAreas 1 and 3 are posted with "Buffer Zone" signs and pink flagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all the following road segments: All rocked haul roads used during the operation. PURCHASER may use rock from the STATE Big Noise stockpiles located in the NE1/4 of Section 25, T8N, R7W, X.X., (3/4”-0” and 1½”-0” crushed rock) and the SW1/4 of Section 36, T8N, R7W, X.X., (4”-0” crushed rock) for hauling under this contractmaintenance on STATE roads. In addition Prior to forest road maintenance required under this contractany rock spreading, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection obtain approval from STATE. All dirt roads or unfinished subgrades shall consist of measures necessary be closed prior to prevent damage October 1, annually. These roads shall be closed by the operations, and to keep constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not construct waterbars as specified in Exhibit H. These roads may be allowed from November 1 through reopened after April 30, unless otherwise approved in writing annually, upon written approval by STATE. Dirt spur roads shall be closed and waterbarred at the conclusion of use. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber," and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling," and "Thinning Specifications," within the Areas 1, 2, 5, and 6. All timber sale area. within Areas 3, 4, A, B, C, D, and E. All timber within Area 7 R/W. Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and signs, pink flagging, and blue paint along property lines and posted stream buffers. Area 7 R/W is posted with "Right-of-Way Boundary" signs. The boundaries between Areas 2 and 4, 2 and 5, 2 and 6, 5 and A, 6 and B, 6 and C, 6 and D, 6 and E, and 5 and 6 are posted with “Area Boundary” signs. Type F streams and perennial Type N streams in Areas 3 and 4 are posted with “Buffer Zone” signs, pink flagging, and blue paint. PURCHASER shall not have any blue or black paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and/or compact crushed rock surfacing on all rocked roads used for hauling under this contract. In addition The following road segments shall be closed prior to forest road maintenance required under this contractOctober 1, PURCHASER shall protect the Hill County Road shown on Exhibit A. Protection shall consist of measures necessary annually: 1A to prevent damage by the operations1B, 1C to 1D, 1E to 1F, 2C to 2D, 2E to 2F, 2G to 2H, 2I to 2J, 2K to 2L, and 3A to keep 3B: These roads shall be closed by constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the construct waterbars as specified in Exhibit F. These road segments may be reopened after May 31, annually, upon completion of operations or arrange with the county road department for final gradingwritten approval by STATE. Log hauling shall not be allowed on dirt roads from November October 1 through April 30May 31, unless otherwise approved in writing by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber within the Areas 1, 2, and 3. All timber sale area. within Area 4 R/W. Boundary markings are as follows: The timber sale area is Areas 1, 2, and 3 are posted with "Timber Sale Boundary" signs and signs, pink flagging, and blue paint. Area 4 R/W is posted with "Right-of-Way Boundary" signs. Interior Type N stream buffers are posted with "Buffer Zone" signs, pink flagging, and blue paint. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade crushed rock surfacing perform the following road maintenance on all STATE and BLM roads used for hauling under this contract. In addition to forest road , as well as other maintenance required under in this contractsection: (1) Apply patch rock, PURCHASER as directed by STATE, that may be required as a result of operations. (2) Clean all culvert catch basins and intakes. Re-establish all ditches and ditchouts. (3) Reshape the haul route with a grader. (4) Compact crushed rock surfacing with a vibratory roller on the following road segments: Xxxxx Road and Spur 1. The following road segments shall protect the Hill County Road shown on Exhibit A. Protection be closed prior to October 1, annually: All dirt roads. These roads shall consist of measures necessary to prevent damage be closed by the operations, and to keep constructing a barrier which makes the road passable during operating periodsimpassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall grade the road construct waterbars as directed by STATE. Dirt roads may be reopened after October 1, annually, upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing written approval by STATE. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale areaarea and road construction rights-of- way on STATE land. In accordance with Section 1, the following is designated timber, except as excluded by the section titled, "Reserved Timber": All timber cut in accordance with the specifications in the sections titled, "Felling," within the timber sale areaArea I. All trees within Area III R/W on STATE land. Boundary markings are as follows: The timber sale area Area I is posted with "Timber Sale Boundary" signs and pink and white flagging. PURCHASER shall not have any Area II is posted with "Area Boundary" tags and yellow and pink flagging. Area III R/W is posted with "Right-of-Way Boundary" signs and orange flagging. "No-cut" stream buffers are marked with "Buffer Zone" tags and blue paint on the timber sale areaand pink flagging.

Appears in 1 contract

Samples: Timber Sale Contract

Road Surfaces. (1) Grade, shape, crown, and/or outslope surface and shoulders. (2) Provide leveling, patching, and/or reinforcement rock for restoring purposes. (3) Prevent contamination of road surface materials with soil and vegetative material. (4) Prevent road surface materials from being bladed off the road. (5) Temporarily cease road use to prevent and/or protect the road during adverse weather conditions. Examples of adverse weather conditions are freezing and thawing cycles, high soil moisture caused by rainfall events, and accumulation of snow that requires removal to continue hauling activity. At the conclusion of log hauling operations, PURCHASER shall grade process and compact crushed rock surfacing on all roads used for hauling under this contract. Processing and compaction shall be done in accordance with Exhibit B, “Compaction and Processing Requirements.” STATE shall require the application of water to achieve optimum conditions for rock processing and compaction on crushed rock roads. Required replacement rock shall be obtained from approved STATE quarries and stockpile sites. The following road segments shall be closed prior to November 1, annually: 4B to 4C, 5A to 5B, 5C to 5D, 5E to 5F, and 6A to 6B. These roads shall be closed by constructing a barrier which makes the road impassable to vehicular traffic. All road closures shall be approved by STATE. Closed roads shall be waterbarred when erosion potential exists, or where directed by STATE. PURCHASER shall construct waterbars as specified in Exhibit G. The above listed road segments may be reopened after April 30, annually, upon written approval by STATE. In addition to forest road maintenance required under this contract, PURCHASER shall protect maintain the Hill Saddle Mountain County Road shown on Exhibit A. Protection Maintenance shall consist of measures necessary to prevent damage by the operations, and to keep the road passable during operating periods. PURCHASER shall grade the road upon completion of operations or arrange with the county road department for final grading. Log hauling shall not be allowed from November 1 through April 30, unless otherwise approved in writing by STATEoperation. Extraordinary maintenance is defined as major repair work and/or damage caused by acts of God or causes beyond the control of the PURCHASER, as defined in Section 28. STATE may require PURCHASER to perform extraordinary maintenance. STATE shall describe the amount and specifications of work to be done in writing, and make adjustments in accordance with Section 28. TIMBER SALE AREA Section 55. Designated Timber. The timber is located on the timber sale area. In accordance with Section 1, the following is designated timber, except as excluded by the section sections titled, "Reserved Timber" and "Thinning Specifications": All timber cut in accordance with the specifications in the sections titled, "Felling" and "Thinning Specifications," within the Areas 1 and 2. All timber sale areawithin Areas 3, 4, 5, and 6. All timber within Area 7 R/W. Boundary markings are as follows: The timber sale area is areas are posted with "Timber Sale Boundary" signs and pink flagging. Area 7 R/W is posted with "Right-of-Way Boundary" signs. The boundaries between Areas 1, 2, and 3 are posted with "Area Boundary" signs. Type N stream buffers in Areas 3 and 5 are posted with “Buffer Zone” signs. The wildlife buffer in Area 6 is posted with “Buffer Zone” signs. PURCHASER shall not have any blue paint on the timber sale area.

Appears in 1 contract

Samples: Timber Sale Contract

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!