Common use of Road Works Clause in Contracts

Road Works. The road works is basically the Road Reinstatement work. The Contractor shall be responsible to ensure that all existing roads are reinstated to their proposed condition, as listed below, immediately after hydraulic testing of the pipeline and backfilling has been completed, as per specification. The finished levels of the completed reinstatement shall conform to the adjoining carriageway or road surface. Reinstated road shall match the levels of the existing road. Existing Road Surface Proposed Road Surface Bituminous or Asphalt Same as Existing Concrete Bituminous or Concrete (as per direction of Employer’s Representative) Water Bound Macadam (WBM) Same as Existing Brick Same as Existing or Bituminous (as per direction of the Employer’s Representative) Earthen Same as Existing The work shall be carried as per the Road Work Specifications (latest) of the Public Works Department (PWD), Government of Assam. The item shall be complete in all respect as per specification and as directed, including all lead and lift. The materials shall be tested at site and laboratory, as directed. Other details shall conform to the Standard Specification. Material grading shall be as per the latest Assam PWD schedule.

Appears in 4 contracts

Samples: Loan Agreement, Loan Agreement, Loan Agreement

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!