Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.
Supporting Evidence The Recipient shall furnish to the Administrator such documents and other evidence in support of the application as the Administrator shall reasonably request, whether before or after the Administrator shall have permitted any withdrawal requested in the application.
ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:
Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:
Timber Cut Through Mistake Undesig- nated timber meeting Utilization Standards, cut by Pur- chaser through mistake and included by Contracting Offi- cer under B2.14, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such ma- terial is not listed in A2. In such event, Contracting Offi- cer, in accord with standard Forest Service methods, shall establish rates to be paid.
HHS Single Audit Unit will notify Grantee to complete the Single Audit Determination Form If Grantee fails to complete the form within thirty (30) calendar days after receipt of notice, Grantee maybe subject to sanctions and remedies for non-compliance.
Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.
Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.
Traditional IRA-to-Xxxx XXX Conversions If you convert to a Xxxx XXX, the amount of the conversion from your Traditional IRA to your Xxxx XXX will be treated as a distribution for income tax purposes, and is includible in your gross income (except for any nondeductible contributions). Although the conversion amount generally is included in income, the 10 percent early distribution penalty tax will not apply to conversions from a Traditional IRA to a Xxxx XXX, regardless of whether you qualify for any exceptions to the 10 percent penalty tax. If you are required to take a required minimum distribution for the year, you must remove your required minimum distribution before converting your Traditional IRA.
Correction Period (1) End of correction period. The last day of the correction period for an Operational Failure is the last day of the second plan year following the plan year for which the failure occurred. However, in the case of a failure to satisfy the requirements of § 401(k)(3), 401(m)(2), or 401(m)(9), the correction period does not end until the last day of the second plan year following the plan year that includes the last day of the additional period for correction permitted under § 401(k)(8) or 401(m)(6). If a 403(b) Plan does not have a plan year, the plan year is deemed to be the calendar year for purposes of this subsection.