Sampling and Testing Requirements Sample Clauses

Sampling and Testing Requirements. XXXX will perform sampling and testing at the Facility in accordance with the Safe Water Drinking Act, the Drinking Water Systems Regulation (O. Reg. 170/03), Municipal Drinking Water Licences (or Certificates of Approval) and Applicable Laws. Sampling and testing shall occur for the following three sub-systems separately:
AutoNDA by SimpleDocs
Sampling and Testing Requirements. 2.3.1 After excavation, confirmation samples should be undertaken at limits of excavation to confirm that all contaminated soils have been excavated. The confirmation samples shall be analysed by an HOKLAS accredited laboratory and if the analytical results are below the relevant Dutch B/C levels, removal of contaminated soil shall be considered complete. If the analytical samples exceed the relevant action levels, more soil shall be excavated (either with 0.5m increment in vertical or 1m in horizontal direction depending on whether the exceeding confirmation sample is collected from a sidewall or excavation base), and additional confirmation samples shall be collected and analysed until all confirmation samples are below the relevant action levels.
Sampling and Testing Requirements. 2.4.1 The objective of the biopile closure assessment is to collect soil samples for testing in order to ensure that the soil contaminant levels in the biopiles are below the cleanup targets for TPH / VOCs / SVOC. Furthermore, for soil to be treated subsequently by solidification / stabilization, the levels of the concerned metals will also be analysed to provide the baseline conditions.
Sampling and Testing Requirements. The Contractor shall meet the test requirements of Table 301-B.14:1 “Contractor and NMDOT Sampling and Testing Requirements” for Acceptance. 301-B.9 PROFILE AND CROSS SLOPE REQUIREMENTS After the final rolling, the Contractor shall measure the profile and cross slope of the CCPR-Foamed Asphalt Stabilized Base. The Contractor shall use a ten (10)-foot metal straightedge to measure at right angles and parallel to the centerline. The Contractor shall correct surface deviations greater than ½ in within ten (10) feet as directed by the Project Manager.

Related to Sampling and Testing Requirements

  • Testing Requirements 12.1. Workplaces -

  • Forecasting Requirements 19.5.1 The Parties shall exchange technical descriptions and forecasts of their Interconnection and traffic requirements in sufficient detail necessary to establish the Interconnections necessary for traffic completion to and from all Customers in their respective designated service areas.

  • Screening Requirements Xxxxxx shall ensure that all prospective and current Covered Persons are not Ineligible Persons, by implementing the following screening requirements.

  • Training Requirements Grantee shall:

  • Inspections and Testing Each Interconnected Entity shall perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Customer Facility with the Transmission System in a safe and reliable manner. Each Interconnected Entity shall have the right, upon advance written notice, to request reasonable additional testing of an Interconnected Entity’s facilities for good cause, as may be in accordance with Good Utility Practice.

  • Quality Assurance Requirements There are no special Quality Assurance requirements under this Agreement.

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Credentialing Requirements Registry Operator, through the facilitation of the CZDA Provider, will request each user to provide it with information sufficient to correctly identify and locate the user. Such user information will include, without limitation, company name, contact name, address, telephone number, facsimile number, email address and IP address.

  • Forecasting Requirements for Trunk Provisioning Within ninety (90) days of executing this Agreement, Reconex shall provide Verizon a two (2) year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Local Interconnection Trunk groups over the next eight (8) quarters. The forecast shall be updated and provided to Verizon on an as-needed basis but no less frequently than semiannually. All forecasts shall comply with the Verizon CLEC Interconnection Trunking Forecast Guide and shall include, at a minimum, Access Carrier Terminal Location (“ACTL”), traffic type (Local Traffic/Toll Traffic, Operator Services, 911, etc.), code (identifies trunk group), A location/Z location (CLLI codes for Reconex-IPs and Verizon-IPs), interface type (e.g., DS1), and trunks in service each year (cumulative).

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.