Schematic Design Sample Clauses

Schematic Design. See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.
AutoNDA by SimpleDocs
Schematic Design. The beginning of the design process, sometimes commonly known as Preliminary Design. Schematic Design Documents are the schematic design plans and elevations showing the scale and relationship of Project or its Compo­nents. Schematic Design documents consist of written and graphic (drawings, sketches, etc.) presentations that will enable the Owner (through the advice of the Program Manager) to determine if the intent of the project, as set forth in the Program provided by the Owner, is being addressed, and shall consist of at least the following: (a) Schematic Site Plan; (b) Floor Plans; and (c) Elevations.
Schematic Design. Within twenty-five (25) calendar days after the Schematic Design documents have been prepared by the Program Manager and approved by Owner, Design-Builder shall prepare for the review by the Program Manager and approval by the Owner of a more detailed construction cost estimate with supporting data. During the preparation of the Design Development documents, Design-Builder shall update and refine this estimate at appropriate intervals agreed to by Owner, Program Manager, and Design-Builder.
Schematic Design. 2.2.1 Design Professional shall consult with the City to ascertain requirements of the Task including operational needs analysis in coordination with the City’s Engineering & Capital Projects Department. Schematic Design studies shall include, but not be limited to the following:
Schematic Design. After receiving approval from Owner and based on the approved Project Scope and Budget Validation report and any adjustments authorized by Owner in the Project Scope, Project Schedule or Project Budget, the Consultant shall prepare, submit and present for review and approval by the Owner, Phase I Schematic Design Documents, based on the SREF requirements for schematic drawings. In addition to SREF requirements and information required by the Owner’s document submittal checklist for phase I, the documents shall include the following:
Schematic Design. A. Based on the program analysis, A/E shall prepare up to three (3) design studies for review and consideration by CDB and the Using Agency. Design studies may include written descriptions and alternatives, drawings and other documents as appropriate.
Schematic Design. 3.3.2.1 Developer acknowledges and agrees that if Xxxxxxxxx wishes to deviate from the Schematic ROW set forth in the Schematic Design, it must specifically identify such modifications in writing to TxDOT in accordance with Section 2.1.2.4, provide justification for the modification, and obtain specific written approval from TxDOT, in its sole discretion, prior to use of such modifications. Subject to Section 2.1.3.3, Developer must obtain TxDOT’s prior written approval to deviate from the Schematic Design unless the proposed modification meets all of the following: (a) is within the Schematic ROW and requires no additional right of way; (b) meets the requirements of the Technical Provisions; (c) requires no New Environmental Approval; (d) does not constitute a Design Exception or Design Waiver; and (e) is consistent with the design concepts included in the Proposal. Developer acknowledges and agrees that the requirements and constraints set forth in the Contract Documents and in the Governmental Approvals, as well as Site conditions, will impact Developer’s ability to revise the concepts contained in the Schematic Design, in addition to the requirement to obtain approval.
AutoNDA by SimpleDocs
Schematic Design. Within twenty-five (25) calendar days after the Schematic Design documents have been prepared by the Project Design Professional and approved by Owner, CM/GC shall prepare for the review by the Project Design Professional and approval by the Owner of a more detailed construction cost estimate with supporting data. During the preparation of the Design Development documents, CM/GC shall update and refine this estimate at appropriate intervals agreed to by Owner, Design Professional, and CM/GC. Design Development. Within twenty-five (25) calendar days after the Design Development documents have been prepared by the Design Professional and approved by Owner, CM/GC shall prepare a more detailed construction cost estimate with supporting data for review by the Project Design Professional and approval by Owner.
Schematic Design. 6.1 Prior to the start of work for the Conceptual Design stage, the Design Professional must receive written direction from the Owner to proceed. E‐mail format will be utilized for this authorization.
Schematic Design. 3.1.1 Unless the Contracting Authority directs otherwise in writing, the Schematic Design Stage will begin upon completion of the activities described under Article 2.