Obligations of the Concessionaire 5.1.1 Subject to and on the terms and conditions of this Agreement, the Concessionaire shall, at its own cost and expense, procure finance for and undertake the design, engineering, procurement, construction, operation and maintenance of the Project and observe, fulfil, comply with and perform all its obligations set out in this Agreement or arising hereunder. 5.1.2 The Concessionaire shall comply with all Applicable Laws and Applicable Permits (including renewals as required) in the performance of its obligations under this Agreement. 5.1.3 Subject to the provisions of Clauses 5.1.1 and 5.1.2, the Concessionaire shall discharge its obligations in accordance with Good Industry Practice and as a reasonable and prudent person. 5.1.4 The Concessionaire shall, at its own cost and expense, in addition to and not in derogation of its obligations elsewhere set out in this Agreement carry out the following but not be limited to: (a) make, or cause to be made, necessary applications to the relevant Government Instrumentalities with such particulars and details as may be required for obtaining Applicable Permits (other than those set forth in Clause 4.1.3), and obtain and keep in force and effect such Applicable Permits in conformity with the Applicable Laws; (b) procure, as required, the appropriate proprietary rights, licences, agreements and permissions for materials, methods, processes and systems used or incorporated into the Project; (c) perform and fulfil its obligations under the Financing Agreements; (d) make reasonable efforts to maintain harmony and good industrial relations among the personnel employed by it or its Contractors in connection with the performance of its obligations under this Agreement; (e) make reasonable efforts to facilitate the acquisition of land required for the purposes of the Agreement; (f) ensure and procure that its Contractors comply with all Applicable Permits and Applicable Laws in the performance by them of any of the Concessionaire's obligations under this Agreement; (g) not do or omit to do any act, deed or thing which may in any manner be violative of any of the provisions of this Agreement; (h) support, cooperate with and facilitate the Authority in the implementation and operation of the Project in accordance with the provisions of this Agreement; (i) modify/demolish the existing structures on the Site at its own cost and consequences. The Concessionaire shall ensure that the demolition and construction of the existing structures is also in compliance with the prevailing building bye laws, zoning regulations as prescribed by H&UPD, GoUP, other appropriate authority or any regulatory authority (ASI, TTZ, NGT etc.). XXX policy of GoI and GoUP shall be admissible as and where applicable. The Concessionaire shall be responsible for safe and hassle-free disposal of the scrap from the Site; (j) (deleted) (k) transfer the Bus Terminal and the Commercial Complex to the Authority upon Termination of this Agreement, in accordance with the provisions thereof. (l) develop a centralized covered Bus Terminal with adequate number of bus bays along with RCC yard area, passenger movement spaces, furniture fixtures, electrical fittings, utilities and other related requirements; (m) {where Bus Terminal and workshops/ depots are adjoining, the development of workshops unit with necessary structural provisions and RCC yard, furniture fixtures, electrical fittings with minimum 6 meters of working/ maintenance shed height with no access from and/ to commercial areas as a mandatory requirement. However, Authority shall take separate electricity connection for the workshop area and shall pay for the electricity usage in it}1; (n) construct and maintain public amenities like ablution units etc.; (o) all the passenger amenities, Workshop facilities as well as UPSRTC staff facilities shall be maintained hygienic, neat and clean during the concession period; (p) accesses either through staircases, overbridges or underpasses for movement of pedestrians from one platform to the other in a safe and fully secured manner; (q) a dedicated office for UPSRTC staff with a sufficient usable area along with change rooms and toilets as per the specifications of UPSRTC shall be made available unconditionally and free of cost for the entire concession period on ground and first floors only of the Bus Terminal; (r) all the facilities for plumbing, internal electrification and all the other allied works to render the office functional (partitions excluded); (s) facility for parking adequate number of 4 wheelers, 3 Wheelers and 2 wheelers of passengers and commercial area users. The parking facility for Bus Terminal and for the Commercial Complex shall be segregated. (Refer prevailing Government of Housing and Urban Planning department circulars/ G.O’s); 1 This provision to be used only for Sites where workshops are adjoining the Bus Terminal (t) all the other allied facilities for fire protection, accesses in the form of ramps, protective railings, ventilation system etc.; (u) day to day operation and management of the Project as per this Agreement; and (v) bear the expenses of electricity and water in the Bus Terminal during the Concession Period of Bus Terminal, except electricity and water charges for Authority’s office, workshop, drivers or staff dormitory and electric bus charging which shall be borne by the Authority.
Obligations of the Contractor (i) Subject to and on the terms and conditions of this Agreement, the Contractor shall undertake the survey, investigation, design, engineering, procurement, construction, and maintenance of the Project Highway and observe, fulfil, comply with and perform all its obligations set out in this Agreement or arising hereunder. (ii) The Contractor shall comply with all Applicable Laws and Applicable Permits (including renewals as required) in the performance of its obligations under this Agreement. (iii) Subject to the provisions of Clauses 4.1 (i) and 4.1 (ii), the Contractor shall discharge its obligations in accordance with Good Industry Practice and as a reasonable and prudent person. (iv) The Contractor shall remedy any and all loss, defects, or damage to the Project Highway from the Appointed Date until the end of the Construction Period at the Contractor’s cost, save and except to the extent that any such loss, defect, or damage shall have arisen from any wilful default or neglect of the Authority. (v) The Contractor shall remedy any and all loss, defect or damage to the Project Highway during the Defects Liability Period at the Contractor’s cost to the extent that such loss, defect or damage shall have arisen out of the reasons specified in Clause 17.3. (vi) The Contractor shall remedy any and all loss or damage to the Project Highway during the Maintenance Period at the Contractor’s cost, including those stated in Clause 14.1 (ii), save and except to the extent that any such loss or damage shall have arisen on account of any wilful default or neglect of the Authority or on account of a Force Majeure Event. (vii) The Contractor shall, at its own cost and expense, in addition to and not in derogation of its obligations elsewhere set out in this Agreement: (a) make, or cause to be made, necessary applications to the relevant Government Instrumentalities with such particulars and details as may be required for obtaining Applicable Permits set forth in Schedule-F and obtain and keep in force and effect such Applicable Permits in conformity with the Applicable Laws; (b) procure, as required, the appropriate proprietary rights, licences, agreements and permissions for Materials, methods, processes and systems used or incorporated into the Project Highway; (c) make reasonable efforts to maintain harmony and good industrial relations among the personnel employed byit or its Sub-contractors in connection with the performance of its obligations under this Agreement; (d) ensure and procure that its Sub-contractors comply with all Applicable Permits and Applicable Laws in the performance by them of any of the Contractor’s obligations under this Agreement; (e) not do or omit to do any act, deed or thing which may in any manner violate any provisions of this Agreement; (f) support, cooperate with and facilitate the Authority in the implementation and operation of the Project in accordance with the provisions of this Agreement; (g) ensure that the Contractor and its Sub-contractors comply with the safety and welfare measures for labour in accordance with the Applicable Laws and Good Industry Practice; (h) keep, on Site, a copy of this Agreement, publications named in this Agreement, the Drawings, Documents relating to the Project, and Change of Scope orders and other communications given under this Agreement. The Authority’s Engineer and its authorised personnel shall have the right of access to all these documents at all reasonable times; (i) cooperate with other contractors employed by the Authority and personnel of any public authority; and (j) not interfere unnecessarily or improperly with the convenience of the public, or the access to and use and occupation of all roads and footpaths, irrespective of whether they are public or in the possession of the Authority or of others. (viii) The Contractor shall undertake all necessary superintendence to plan, arrange, direct, manage, inspect and test the Works. The Contractor shall provide all necessary superintendence of the Works for the proper fulfilling of the Contractor's obligations under the Agreement. Such superintendence shall be given by competent person having adequate knowledge of the operations to be carried out (including the methods and techniques required, the hazards likely to be encountered and methods of preventing accidents) for the satisfactory and safe execution of the Works. (ix) The Contractor shall obtain and maintain a project related bank account operational at site where all transactions related to the payment of work will be done. The Contractor shall submit a monthly account statement and a detailed report on utilization of funds transferred to this project related bank account to Authority’s Engineer. Notwithstanding anything contrary to this agreement, the authority, in the interest and to ensure timely completion of the work, reserves the right to audit such bank accounts to ensure that there is no diversion of funds from this project specific account to any other project being implemented by the Contractor. (x) The Contractor shall provide the documents of the Contractor specified in the Agreement, and all Contractors' personnel; Goods, consumables and other things and services, whether of a temporary or permanent nature, required in and for the execution, completion of Works and remedying defects. (xi) The Contractor shall perform the Works in conformity with the Project requirements and other requirements and standards prescribed under or pursuant to the Agreement. (xii) The Contractor shall carry out such work incidental and contingent to the original Scope of the Project to comply with Good Industry Practices. (xiii) The Contractor shall maintain required staff and necessary Contractor’s equipment and materials within the reach of the Site during the Defects Liability Period so that any defects arising are promptly attended.
Obligations of the Customer 3.1 The Customer agrees to: (a) The Customer shall give the Company not less than 14 days prior written notice of any proposed change of ownership of the Customer and or any change in the Customer’s details (including but not limited to, changes in the customer’s name, address, contact phone/fax numbers or business practice). The Customer shall be liable for any loss incurred by the Company as a result of the Customers failure to comply with this clause. (b) Pay the Company the Price for carrying out the Works in accordance with this agreement; (c) Provide the Company with all necessary plans, specifications, services and amenities, so as to allow the Company to carry out the Works, provide access to the Location and ensure to the Company’s reasonable satisfaction that the Location remains in a state and condition that is safe for the Company and its employees and agents; (d) Ensure the Location complies with all necessary bylaws and restrictions is structurally sound (in accordance with all legislation governing safety in the workplace); (e) Not to cause any disruption or obstruction to the carrying out of any Works and to follow any reasonable instructions provided by the Company about the Works; (f) Where the Works requires co-ordination with other trades then the Customer will supply the Company with a schedule detailing all relevant information so as to allow the Company sufficient time to co-ordinate with the Customer’s other tradespersons; (g) Permit the Company to attach such reasonable signage as the Company may wish to any Works so as to identify that the Company is carrying out the Works; (h) In circumstances where it wishes to make a claim against the Company pursuant to the guarantee given in clause 13.2, exclusively permit the Company or its authorised representative to remedy or make good any defects in its Workmanship and not permit any other third party to do so. 3.2 Without prejudice to any other right or remedy of the Company, if the Customer fails to carry out or perform any of its obligations pursuant to this clause 3 (excepting clause 3.1(g)) then, in addition to any Additional Expenses Charge that may apply, the Company may charge the Customer a Services Delay Charge for each day (or part thereof) that the Company is, in its reasonable opinion, unable and/or not required to carry out or perform the Works as a result of such breach by the Customer. 3.3 Where the Customer requests any Related Work to be carried out, the Company will use its best endeavours to source suppliers and/or contractors to carry out the Related Work, but the Customer is responsible for the commissioning, controlling, and payment for such work. 3.4 The Customer acknowledges that unless otherwise agreed in writing between the Customer and the Company, the Customer shall be responsible for obtaining, paying for and maintaining in force all permits, approvals, authorisations, authorities, licences and consents of all regulatory authorities whatsoever which are or may be necessary or advisable in connection with the Works.
Obligations of the Client 4.1. The client undertakes to inform the company in advance (meaning no later than 2 calendar days) about the dispatch of the goods, by entering the shipment into the Xxxxx.xxx software. 4.1.1. In case of non-compliance with subparagraph 3.2.1 of this agreement, the company has the right to refuse the client in accepting and placing his goods at the warehouse. 4.2. To send goods from the warehouse or to carry out other operations, the client is obliged to provide his client number (client ID) and data of the goods.
Obligations of the Service Provider 3.1. The Service Provider undertakes to provide the services as set out online within the dedicated Hoople Schools portal to this Agreement (the ‘Services’), in consideration of the payment as set out in the dedicated Hoople Schools portal. The Service Provider has undertaken Payment calculation based on the following terms: 3.1.1. payment for services relating to employee numbers has been calculated based on the number of employees at each Establishment as at January 2020. Included in the calculation is a 5% tolerance. If employee numbers rise above this 5% tolerance Hoople reserves the right to charge incremental fees 3.1.2. payment for the Payments Management service has been based on the number of payment vouchers raised in 2018/19, within a 10% tolerance level. The Service Provider reserves the right to increase pricing if volumes increase by more than the stated tolerance level 3.1.3. should the Establishment request an additional service during the duration of the term, the Service Provider reserves the right to charge the full, annual cost of the requested service 3.1.4. payment for services relating to pupil numbers has been calculated based on the number of pupils at each Establishment as at October 2019. Included in the calculation are sixth form and nursery pupil numbers, where applicable 3.1.5. The Service Provider will provide digital order confirmation of the services ordered and associated fees by means of the functionality of the Hoople Schools portal 3.2. Should the Establishment request and the Service Provider agrees to provide services additional to those specified within the schools buying portal order, the fees for those additional services shall be mutually agreed between the parties, but otherwise for all purposes of this Agreement, the additional services shall be deemed to be included within the definition of Services. 3.3. The Services shall be carried out by the Service Provider with all reasonable skill and care, and in full compliance of relevant established current professional standards. The Service Provider undertakes to provide a detailed service level agreement (SLA), outlining the responsibilities of both parties with regard to each service. The SLA for each service will be provided as a downloadable document on the Hoople Schools portal. 3.4. The Service Provider shall indemnify the Establishment from all claims, actions or demands made by third parties against the Establishment, and all liabilities of the Establishment to third parties (collectively ‘Third Party Liabilities’) and from all damage, losses, costs, expenses and payments whatsoever suffered or incurred by the Establishment either directly or in relation to Third Party Liabilities in respect of (a) personal injury to or the death of any person and any loss or destruction of or damage to property (not attributable to any default or neglect of the Establishment or of any person for whom the Establishment is responsible) which shall have occurred in connection with the provision of the Services under this Agreement, (b) any defect in the Services, and (c) any breach by the Service Provider of any terms of this Agreement, including without limitation, clause
Obligations of the Licensee 5.1.1. The Licensee’s Responsibilities and Duties shall include the following, in addition to and without prejudice to other obligations under this Agreement: a. to obtain due permits, necessary approvals, clearances and sanctions from Maha-Metro and all other competent authorities for all activities or infrastructure facilities including interior decoration, power, water supply, drainage & sewerage, telecommunication, etc.; b. to comply and observe at all times with all Applicable Permits, approvals and Applicable Laws in the performance of its obligations under this Agreement including those being performed by any of its contractors; c. to develop, operate and maintain the Licensed Area at all times in conformity with this Agreement; d. to furnish Maha-Metro with the “As built” Drawings of the Licensed Space(s) within the Moratorium Period; e. to ensure that no structural damage is caused to the existing buildings and other permanent structures at the station as a result of his activities or any of its agents, contractors etc.; f. to take all reasonable steps to protect the environment (both on and off the property business space) and to limit damage and nuisance to people and property resulting from construction and operations, within guidelines specified as per Applicable Laws and Applicable Permits; g. to duly supervise, monitor and control the activities of contractors, agents, etc., if any, under their respective License Agreements as may be necessary; h. to take all responsible precautions for the prevention of accidents on or about the property business space and provide all reasonable assistance and emergency medical aid to accident victims; i. not to permit any person, claiming through or under the Licensee, to create or place any encumbrance or security interest over whole or any part of the Licensed premises and/or other installed assets, or on any rights of the Licensee therein or under this Agreement, save and except as expressly permitted in this Agreement; j. to keep the Licensed Space free from all unnecessary obstruction during execution of works and store the equipment or surplus materials, dispose of such equipment or surplus materials in a manner that causes least inconvenience to the Xxxxx Xxxxxxx, metro commuters or Maha-Metro’s activities. k. at all times, to afford access to the Licensed Property Business Space to the authorised representatives of Maha-Metro, other persons duly authorised by any Governmental Agency having jurisdiction over the business of Licensed Property Business Space, to inspect the Licensed Property Business Space and to investigate any matter within their authority and upon reasonable notice; and l. use non-combustable material in the allotted space for creation/erection/installation of any kind of furniture, fixtures and or partitions within the space. Use of combustable material within the property business space shall not be permitted under any circumstances. m. to comply with the divestment requirements and hand over the Licensed Property Business Space to Maha-Metro upon Termination of the Agreement; 5.1.2. The Licensee shall be solely and primarily responsible to Maha-Metro for observance of all the provisions of this License Agreement on behalf of its employees and representatives and agents and any person acting under or for and on behalf of the Licensee, contractor (s) appointed for the Licensed Space as fully as if they were the acts or defaults of the Licensee, its agents or employees.
Obligations of Licensee 2.1 Licensee is responsible for the quality and safety of its products. 2.2 Licensee shall use all reasonable efforts and diligence to exploit the Invention and to proceed with the development, manufacture and sale of Licensed Product and to use commercially reasonable efforts to develop markets for the Licensed Product. 2.3 Licensee will represent the Licensed Product fairly in comparison with competitive products from other suppliers. 2.4 Licensee shall not, on behalf of University, make any representations or give any warranties or guarantees in respect of the Proprietary IPR not expressly authorised in writing by University, provided that such authorization shall not be unreasonably delayed or withheld by University. 2.5 Licensee shall not market the Licensed Product under the name of University, and not in any way create any impression that University is the seller of the Licensed Product. 2.6 Licensee shall take all such steps as are reasonably necessary to protect Intellectual Property Rights in the Invention. 2.7 Licensee shall promptly inform University upon becoming aware of any illegal or unauthorised use of the Invention or any infringement of the Prospective Patent or Proprietary IPR and Intellectual Property Rights therein. 2.8 Licensee shall comply with all laws, regulations and governmental obligations that may from time to time be applicable to the making, use or sale of the Licensed Product in each part of the Territory. 2.9 As between Licensee and University and without limiting any responsibility of an Affiliate or Sub-Licensee, Licensee shall be solely responsible for any claims arising or alleged to arise from loss or injury to persons or property caused or suffered in the course of or as a consequence of the use of the Invention by Licensee, Affiliates and Sub-Licensees or the supply and sale of the Licensed Product by Licensee, Affiliates and Sub-Licensees except where such loss or injury are caused by the gross negligence or wilful misconduct of University. 2.10 Except as expressly set forth under this Agreement, Licensee shall use its best endeavours to keep the Invention confidential and not to reveal to any third party any confidential information of University regarding the Invention until after a non-disclosure agreement has been signed, provided that no such obligation shall apply to any information that has been publicly disclosed through no breach of this Agreement by Licensee, including by publication of the Inventions by the applicable governmental agency, was in the possession of Licensee prior to disclosure by University, is obtained by Licensee from a third party, or is independently developed by Licensee. 2.11 To the extent prohibited by applicable law, Licensee shall not carry out any illegal, deceptive, or unethical practices, whether or not they are to the disparagement of the Invention, Licensed Product or University, or, subject to the foregoing in this Section 2.11, any other practices which may be detrimental to the Invention, Licensed Product, University or to the public interest.
Obligations of Customer Axway’s indemnification obligation is contingent upon the Customer: (a) giving immediate written notice to Axway of any such Infringement Claim; (b) giving Axway control of the defense and related settlement negotiations, provided , however that Axway will obtain the Customer’s prior written consent, which shall not be unreasonably withheld or delayed, if any settlement of such an Infringement Claim requires Customer to admit liability, take or refrain from taking any particular action other than cessation of use of the infringing Services, Product, or Deliverable , and (c) assisting in the defense at Axway’s reasonable request, provided Axway agrees to pay Customer’s reasonable expenses in connection therewith. The Customer may participate in such defense and in any settlement discussions directly or through counsel of the Cus tomer’s choice, at the Customer’s expense, provided such participation does not materially prejudice Axway’s sole control of the defense or cause Axway to incur material additional costs in the conduct of such defense .
CONDITIONS OF THE OBLIGATIONS OF THE COMPANY The obligations of the Company to sell and deliver the portion of the Shares required to be delivered as and when specified in this Agreement are subject to the conditions that at the Closing Date or the Option Closing Date, as the case may be, no stop order suspending the effectiveness of the Registration Statement shall have been issued and in effect or proceedings therefor initiated or threatened.
Obligations of the City A. The City agrees to give the Contractor access to the Project area and other City- owned properties as required to perform the necessary Services under this Agreement. B. The City shall notify the Contractor of any defects in the Services of which the Contract Administrator has actual notice.