Sidestream Inflow Greater Sample Clauses

Sidestream Inflow Greater than the Threshold Sidestream Inflow "The City shall not be responsible for that portion of flow which is released due to Sidestream Inflow greater than 3,500 cfs during the chinook salmon spawning period, 2,500 cfs during the pink salmon spawning period, 3,000 cfs during the chum salmon spawning period, or due to Sidestream Inflow which is greater than the current Spawning Control Flow for steelhead minus 500 cfs ". (Section 6.5.4.3) Assumptions: Assume that you are calculating the flow for a pink salmon spawning day during which no water was released for flood control or for meeting a firm load requirement. Actual Xxxx Discharge = 000 xxx XXX = 0 RDL = 0 SS = 5,500 cfs TSS = 2,500 cfs ANF = 6,000 cfs Calculations: DSF = 6,000 - 0 - (5,500 - 2,500) = 3,000 cfs Conclusion: The Daily Spawning Flow is calculated as 3,000 cfs for that day.
AutoNDA by SimpleDocs

Related to Sidestream Inflow Greater

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Verizon OSS Information 8.5.1 Subject to the provisions of this Section 8, in accordance with, but only to the extent required by, Applicable Law, Verizon grants to CBB a non-exclusive license to use Verizon OSS Information.

  • wire Unbundled ISDN Digital Loops These will be provisioned according to industry standards for 2-Wire Basic Rate ISDN services and will come standard with a test point, OC, and a DLR. NewPhone will be responsible for providing BellSouth with a Service Profile Identifier (SPID) associated with a particular ISDN-capable Loop and customer. With the SPID, BellSouth will be able to adequately test the circuit and ensure that it properly supports ISDN service.

  • Volunteer Firefighting Leave Leave without pay will be granted when an employee who is a volunteer firefighter is called to duty to respond to a fire, natural disaster or medical emergency.

  • NO HARDSTOP/PASSIVE LICENSE MONITORING Unless an Authorized User is otherwise specifically advised to the contrary in writing at the time of order and prior to purchase, Contractor hereby warrants and represents that the Product and all Upgrades do not and will not contain any computer code that would disable the Product or Upgrades or impair in any way its operation based on the elapsing of a period of time, exceeding an authorized number of copies, advancement to a particular date or other numeral, or other similar self-destruct mechanisms (sometimes referred to as “time bombs,” “time locks,” or “drop dead” devices) or that would permit Contractor to access the Product to cause such disablement or impairment (sometimes referred to as a “trap door” device). Contractor agrees that in the event of a breach or alleged breach of this provision that Authorized User shall not have an adequate remedy at law, including monetary damages, and that Authorized User shall consequently be entitled to seek a temporary restraining order, injunction, or other form of equitable relief against the continuance of such breach, in addition to any and all remedies to which Authorized User shall be entitled.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Additional Acceptable Uses of Student Data Contractor is prohibited from using Student Data for any secondary use not described in this agreement except:

  • CENTURYLINK OSS INFORMATION 57.1 Subject to the provisions of this Agreement and Applicable Law, CLEC shall have a limited, revocable, non-transferable, non-exclusive right to use CenturyLink OSS Information during the term of this Agreement, for CLEC’s internal use for the provision of Telecommunications Services to CLEC End Users in the State.

Time is Money Join Law Insider Premium to draft better contracts faster.