Site Preparation Engineering Sample Clauses

Site Preparation Engineering. This work was done as part of BP1 activities, and is essentially complete. Adjustments, if needed, will be minor, and will be made after the EPC contractor is selected.
AutoNDA by SimpleDocs

Related to Site Preparation Engineering

  • Site Preparation Contractor shall be responsible for carrying out Stage 2 Site preparation Work as defined in Basis of Design, including:

  • Engineering Network engineering handles the technical aspects of the project, resolution of problems escalated by the NOC, planning for future network expansion, and improving performance and process. Engineering interacts directly with AOL and the NOC.

  • Reverse Engineering The Licensee shall not reverse engineer, decompile or disassemble the object code version of the Computer Program without the prior written approval of the Licensor.

  • No Reverse Engineering Licensee may utilize and study the design, performance and operation of Xbox solely for the purposes of developing the Software Title. Notwithstanding the foregoing, Licensee shall not, directly or indirectly, reverse engineer or aid or assist in the reverse engineering of all or any part of Xbox except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation. Reverse engineering includes, without limitation, decompiling, disassembly, sniffing, peeling semiconductor components, or otherwise deriving source code. In addition to any other rights and remedies that Microsoft may have under the circumstances, Licensee shall be required in all cases to pay royalties to Microsoft in accordance with Section 6 below with respect to any games or other products that are developed, marketed or distributed by Licensee, and derived in whole or in part from the reverse engineering of Xbox or any Microsoft data, code or other material.

  • Selection of Architect/Construction Drawings Tenant shall retain an architect/space planner reasonably and mutually agreed upon by Landlord and Tenant (the “Architect”) to prepare the “Construction Drawings,” as that term is defined in this Section 3.1. The Contractor (as that term is defined in Section 4.1 of this Work Letter) shall provide design-build services from qualified, Landlord-approved mechanical, electrical and plumbing contractors for the preparation of plans and engineering working drawings related to the Improvements. Landlord hereby approves Gensler as the Architect if Tenant decides to select them. Tenant shall retain the engineering consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, HVAC, lifesafety, and sprinkler work in the Premises, which work is not part of the Base Building, provided that Tenant shall retain the subcontractors designated in Schedule 2 attached hereto for the fire alarm design and programming work (the “Fire Alarm Subcontractor”) and for building management systems (the “BMS Subcontractor”). Landlord hereby approves Gensler as the Engineer if Tenant decides to select them. Should Tenant choose to prepare fully engineered drawings in lieu of the design-build approach described above, then Tenant shall retain the Engineers to prepare all plans and engineering working drawings relating to the mechanical, electrical and plumbing work of the Improvements. The plans and drawings to be prepared by Architect, the design-build contractors (unless Tenant selects the fully engineered drawings approach described above), the Fire Alarm Subcontractor, the BMS Subcontractor and the Engineers hereunder shall be known collectively as the “Construction Drawings.” Landlord hereby approves Gensler and Revel to be the Architect if Tenant selects them. All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s reasonable approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the Base Building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant’s waiver and indemnity set forth in the Lease, as amended, shall specifically apply to the Construction Drawings.

  • Joint Preparation The preparation of this Agreement has been a joint effort of the parties and the resulting documents shall not, solely as a matter of judicial construction, be construed more severely against one of the parties than the other.

  • Engineering Reports 45 Section 8.08

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Architect 4.1.1 The Architect is the person lawfully licensed to practice architecture or an entity lawfully practicing architecture identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "

  • Phase I A copy of the existing “Phase I” environmental assessment of the Project, if any, in Seller’s possession; and