Site Tests Sample Clauses

Site Tests. An installation check, start-up, and building load test shall be performed by the manufacturer's local representative. The regular operators and the maintenance staff shall be notified of the time and date of the site test.
Site Tests. After erection is completed following test shall be conducted. (i) Insulation resistance of the generator. (ii) Speed no load voltage and full load voltage regulation (iii) Frequency on no load half load and full load (iv) Full load test for 6 hrs at rated voltage, speed & frequency The readings shall be observed with calibrated meter. Only meter shall be used for the test. The reading shall be properly tabulated submitted in triplicate to the Independent Engineer.
Site Tests. For a period of up to one hundred twenty (120) days after the Closing, Purchaser will exercise Commercially Reasonable Efforts to permit EME and its agents, representatives and contractors, if EME shall so elect, and subject to such reasonable and customary conditions that Purchaser may impose, to enter upon any and all of the real property included in the Projects for the purposes of making tests, taking samples and soil borings, or conducting groundwater studies and such other reasonable investigations in order to determine if there is any Existing Soils Contamination. All such activity and testing shall be at EME's sole cost. For the purposes of this Agreement, the results of such tests shall not be determinative.
Site Tests. 1 Perform all tests required by AHJ and ASME A17.1 / CSA B44.
Site Tests. .1 Testing to be witnessed by authority having jurisdiction. .2 Develop, with Contract administrator assistance, detailed instructions for O & M of this installation. .3 Upon completion and verification of performance of installation, remove surplus materials, excess materials, rubbish, tools and equipment.
Site TestsThe Contractor shall be responsible for site tests on static systems in order to ensure safe operating conditions consistent with design performance. Such tests shall include inspection and testing of welds and pressure testing for soundness of hydraulic systems.
Site Tests. The cables after installation at site shall be subjected to HV test & Megger test as per instruction of EIC.
Site TestsSubject to the limitations of any Prime Lease applicable to the Site in question, Tenant may perform, at its own expense, such tests (including, without limitation, satisfactory soil boring, percolation or other tests or reports as are deemed appropriate by Tenant) to determine the physical characteristics and conditions of the Site. Any such tests or reports shall indicate, to Tenant's satisfaction, that the Site is suitable for Tenant's use.
Site Tests. R+A will work with Staff to identify up to five typical sites to test standards and develop 3D massing diagrams that meet key zoning and objective standards.

Related to Site Tests

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.