Slab/Driveway/Sidewalk Removal. The sub-recipient will ensure, to the fullest extent possible, that the contractor will limit excavation to within one (1) foot of the slab/driveway/sidewalk perimeter and will not excavate more than six (6) inches below the depth of the asphalt/concrete to minimize soil disturbance.
Appears in 3 contracts
Samples: Programmatic Agreement, Programmatic Agreement, www.cdbg-dr.pr.gov
Slab/Driveway/Sidewalk Removal. 7 The sub-recipient Subrecipient will ensure, to the fullest extent possible, that the contractor will 8 limit excavation to within one (1) foot of the slab/driveway/sidewalk perimeter and 9 will not excavate more than six (6) inches below the depth of the asphalt/concrete to 10 minimize soil disturbance.
Appears in 1 contract
Samples: Programmatic Agreement