Sound monitoring mechanism Sample Clauses

Sound monitoring mechanism. 1. Training of managers on MLM and training of vaccinators on development of micro-plans is critical.
AutoNDA by SimpleDocs

Related to Sound monitoring mechanism

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Regulatory Event New Taxes If, after the Effective Date, a Regulatory Event occurs or New Taxes are imposed, and such event or taxes have a direct, material and adverse effect on the economic benefits to a Party of this ESA, the affected Party shall send written notice to the other Party, setting forth the Regulatory Event or New Taxes and reasonably demonstrating the effect of the same on the affected Party. Upon delivery of such notice, the Parties shall use reasonable efforts to negotiate an amendment to this ESA to mitigate such effect. Alternatively, if as a direct result of such a Regulatory Event or New Taxes, the Competitive Supplier incurs additional, material costs, the Competitive Supplier shall provide a written notice to the Town that documents: a) the effective date of the Regulatory Event or New Taxes; b) a detailed explanation and reasonable demonstration of the material costs incurred as a result of the Regulatory Event or New Taxes; c) the timing of the cost impact to be incurred by the Competitive Supplier; d) the proposed price increase per kWh to be passed on to Participating Consumers; and e) a proposed plan for coordinating with the Local Distributor for an increase in the price per kWh that is billed by the Local Distributor, designed to reimburse the Competitive Supplier for such cost impact. If the Town and the Competitive supplier cannot agree on the amendment to this ESA or reimbursement contemplated by this section, the matter may be subject to dispute resolution in accordance with section 12.2. In no event shall a price change become effective without providing Participating Consumers with a 30-day advance notice of the price change.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • ODUF Packing Specifications 6.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Initial Forecasts/Trunking Requirements Because Verizon’s trunking requirements will, at least during an initial period, be dependent on the Customer segments and service segments within Customer segments to whom CSTC decides to market its services, Verizon will be largely dependent on CSTC to provide accurate trunk forecasts for both inbound (from Verizon) and outbound (to Verizon) traffic. Verizon will, as an initial matter, provide the same number of trunks to terminate Reciprocal Compensation Traffic to CSTC as CSTC provides to terminate Reciprocal Compensation Traffic to Verizon. At Verizon’s discretion, when CSTC expressly identifies particular situations that are expected to produce traffic that is substantially skewed in either the inbound or outbound direction, Verizon will provide the number of trunks CSTC suggests; provided, however, that in all cases Verizon’s provision of the forecasted number of trunks to CSTC is conditioned on the following: that such forecast is based on reasonable engineering criteria, there are no capacity constraints, and CSTC’s previous forecasts have proven to be reliable and accurate.

  • Network Interface Device (NID) 2.7.1 The NID is defined as any means of interconnection of end-user customer premises wiring to BellSouth’s distribution plant, such as a cross-connect device used for that purpose. The NID is a single-line termination device or that portion of a multiple-line termination device required to terminate a single line or circuit at the premises. The NID features two independent xxxxxxxx or divisions that separate the service provider’s network from the end user’s customer-premises wiring. Each chamber or division contains the appropriate connection points or posts to which the service provider and the end user each make their connections. The NID provides a protective ground connection and is capable of terminating cables such as twisted pair cable.

Time is Money Join Law Insider Premium to draft better contracts faster.