Sources of Discharge Municipal Groundwater Pumping Sample Clauses

Sources of Discharge Municipal Groundwater Pumping. Groundwater pumping data for municipal supply is metered and will be provided by the individual cities within the Tule Subbasin, as described in Section 3.7.1.1.1.5
AutoNDA by SimpleDocs

Related to Sources of Discharge Municipal Groundwater Pumping

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Cleanup Time Whenever a job being performed or the material or equipment being used has caused an employee to become dirty, the employee shall be allowed a reasonable amount of time, without loss of pay, prior to any meal period or prior to the completion of their workday to clean themselves. Time for cleaning equipment shall be considered as part of the employee’s workday.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Living Plants The Project Area may have living plants; however, there is no lawn grass in the Project Area.

  • Clean-up Time Employees shall be allowed reasonable time during the workday or shift for clean-up purposes.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • No Storing Hazardous Articles Not to keep or store any offensive, combustible, obnoxious, hazardous or dangerous articles in the said Apartment, the Common Areas, and the Building.

  • Drinking Water Adequate arrangement shall be made for the supply of drinking water. If practicable filtered and chlorinated supplies shall be arranged when supplies are from intermittent sources overhead storage tank shall be provided with capacity of five liters a person per day. Where the supply is to be made from a well, it shall conform to the sanitary standard laid down in the report of the Rural Sanitation Committee. The well should be at least 30 meters away from any latrine or other source of population. If possible, hand pump should be installed for drinking water from well. The well should be effectively disinfected once every month and the quality of water should be got tested at the public Health Institution between each work of disinfecting.

Time is Money Join Law Insider Premium to draft better contracts faster.