Common use of Spoil Material Clause in Contracts

Spoil Material. The Contractor shall be responsible for removal from site of all materials excavated in the course of undertaking works in this section of the specifications, unless suitable for re-use, and deposit of the material in a spoil dump to be approved by the Engineer. 818 SCOUR CHECKS Scour checks are to be constructed in mass concrete in accordance with clause 818 of the standard Specifications and the drawings as shall be provided. 819 CLEANING AND MAINTENANCE

Appears in 30 contracts

Samples: www.kenha.co.ke, www.kenha.co.ke, www.kenha.co.ke

AutoNDA by SimpleDocs

Spoil Material. The Contractor shall be responsible for removal from site of all materials excavated in the course of undertaking works in this section of the specifications, unless suitable for re-use, and deposit of the material in a spoil dump to be approved by the Engineer. 818 SCOUR CHECKS Scour checks are to be constructed in mass concrete in accordance with clause 818 of the standard Specifications and the drawings as shall be provided. 819 CLEANING AND MAINTENANCECHECKS

Appears in 2 contracts

Samples: www.kenha.co.ke, www.kenha.co.ke

AutoNDA by SimpleDocs

Spoil Material. The Contractor shall be responsible for removal from site of all materials excavated in the course of undertaking works in this section of the specifications, unless suitable for re-use, and deposit of the material in a spoil dump to be approved by the Engineer. 818 SCOUR CHECKS Scour checks are to be constructed in mass concrete in accordance with clause 818 of the standard Specifications and the drawings as shall be provided. 819 CLEANING AND MAINTENANCE.

Appears in 1 contract

Samples: kenha.co.ke

Time is Money Join Law Insider Premium to draft better contracts faster.