Startup Power Sample Clauses

Startup Power. 27 Section 6.07
AutoNDA by SimpleDocs
Startup Power. (a) At any time the Plant is being started from a zero output condition, PECO shall arrange for the delivery to the Plant of capacity and energy sufficient to start simultaneously the number of Generating Units, up to three Generating Units, required to meet the Energy Request for the hour immediately following the hour in which startup occurs. When one or more Generating Units are producing energy, the Plant shall supply energy to start additional Generating Units. (b) Tenaska shall reimburse PECO for any payments made by PECO to third parties for power to start-up a single Generating Unit in excess of the cost of procuring 10 MW of capacity and 2 MWh of energy or a total of 30 MW of capacity and 6 MWh of energy to start-up three Generating Units simultaneously. (c) If startup power required by a Generating Unit exceeds the amounts provided in Section 6.06(a), PECO will provide Tenaska with copies of tariffs under which PECO procures startup power, for the purpose of verifying cost reimbursement owed by Tenaska to PECO under Section 8.06.
Startup Power. The drawal of energy by the Wind Energy Generator during the start up from the Distribution Licensee shall be adjusted against the generated energy.
Startup Power. The drawal of energy by the REG during the start up from the Distribution Licensee shall be claimed as per the Commission’s Orders / Regulations in force.

Related to Startup Power

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Full Power Customer has full power and is duly authorized to execute and deliver this Agreement and to perform its obligations hereunder. Customer has full power to enter into and engage in any and all transactions (i) in any Account with any BNPP Entity or (ii) that is subject to this Agreement. Further, this Agreement has been duly executed and delivered by Customer, and constitutes a valid, binding and enforceable agreement of Customer, enforceable in accordance with its terms, subject to applicable bankruptcy, insolvency and similar laws affecting creditors’ rights generally and general principles of equity.

  • Removal of General Partner (a) Upon the occurrence of an Event of Bankruptcy as to, or the dissolution of, the General Partner, the General Partner shall be deemed to be removed automatically; provided, however, that if the General Partner is on the date of such occurrence a partnership, the withdrawal, death, dissolution, Event of Bankruptcy as to or removal of a partner in such partnership shall be deemed not to be a dissolution of the General Partner if the business of the General Partner is continued by the remaining partner or partners. The Limited Partners may not remove the General Partner, with or without cause. (b) If the General Partner has been removed pursuant to this Section 7.04 and the Partnership is continued pursuant to Section 7.03, the General Partner shall promptly transfer and assign its General Partnership Interest in the Partnership to the substitute General Partner approved by a Majority in Interest in accordance with Section 7.03(b) and otherwise be admitted to the Partnership in accordance with Section 7.02. At the time of assignment, the removed General Partner shall be entitled to receive from the substitute General Partner the fair market value of the General Partnership Interest of such removed General Partner as reduced by any damages caused to the Partnership by such General Partner. Such fair market value shall be determined by an appraiser mutually agreed upon by the General Partner and a Majority in Interest (excluding the General Partner and any Subsidiary of the General Partner) within ten days following the removal of the General Partner. In the event that the parties are unable to agree upon an appraiser, the removed General Partner and a Majority in Interest (excluding the General Partner and any Subsidiary of the General Partner) each shall select an appraiser. Each such appraiser shall complete an appraisal of the fair market value of the removed General Partner’s General Partnership Interest within 30 days of the General Partner’s removal, and the fair market value of the removed General Partner’s General Partnership Interest shall be the average of the two appraisals; provided, however, that if the higher appraisal exceeds the lower appraisal by more than 20% of the amount of the lower appraisal, the two appraisers, no later than 40 days after the removal of the General Partner, shall select a third appraiser who shall complete an appraisal of the fair market value of the removed General Partner’s General Partnership Interest no later than 60 days after the removal of the General Partner. In such case, the fair market value of the removed General Partner’s General Partnership Interest shall be the average of the two appraisals closest in value. (c) The General Partnership Interest of a removed General Partner, during the time after default until transfer under Section 7.04(b), shall be converted to that of a special Limited Partner; provided, however, such removed General Partner shall not have any rights to participate in the management and affairs of the Partnership, and shall not be entitled to any portion of the income, expense, profit, gain or loss allocations or cash distributions allocable or payable, as the case may be, to the Limited Partners. Instead, such removed General Partner shall receive and be entitled only to retain distributions or allocations of such items that it would have been entitled to receive in its capacity as General Partner, until the transfer is effective pursuant to Section 7.04(b). (d) All Partners shall have given and hereby do give such consents, shall take such actions and shall execute such documents as shall be legally necessary and sufficient to effect all the foregoing provisions of this Section 7.04.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.

  • Initiating Interconnection 4.1 If ENT determines to offer Telephone Exchange Services and to interconnect with Verizon in any LATA in which Verizon also offers Telephone Exchange Services and in which the Parties are not already interconnected pursuant to this Agreement, ENT shall provide written notice to Verizon of the need to establish Interconnection in such LATA pursuant to this Agreement. 4.2 The notice provided in Section 4.1 of this Attachment shall include (a) the initial Routing Point(s); (b) the applicable technically feasible Point(s) of Interconnection on Verizon’s network to be established in the relevant LATA in accordance with this Agreement; (c) ENT’s intended Interconnection activation date; (d) a forecast of ENT’s trunking requirements conforming to Section 14.2 of this Attachment; and (e) such other information as Verizon shall reasonably request in order to facilitate Interconnection. 4.3 The interconnection activation date in the new LATA shall be mutually agreed to by the Parties after receipt by Verizon of all necessary information as indicated above. Within ten (10) Business Days of Verizon’s receipt of ENT’s notice provided for in Section 4.1of this Attachment, Verizon and ENT shall confirm the technically feasible Point of Interconnection on Verizon’s network in the new LATA and the mutually agreed upon Interconnection activation date for the new LATA.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!