Storage Tank Measurement Sample Clauses

Storage Tank Measurement. Storage Tank gauging shall be performed by TLO’s personnel. TRMC may perform joint gauging at its sole expense with TLO’s personnel at the time of delivery or receipt of Product, to verify the amount involved. If TRMC requests an independent xxxxxx, such xxxxxx must be acceptable to TLO and such gauging shall be at TRMC’s sole expense.
AutoNDA by SimpleDocs

Related to Storage Tank Measurement

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Measurement All quantities of Products received or delivered by or into truck, rail, or marine vessel shall be measured and determined based upon the meter readings at each Terminal, as reflected by delivery tickets or bills of lading, or if such meters are unavailable, by applicable calibration tables. All quantities of Products received and delivered by pipeline shall be measured and determined based upon the meter readings of the pipeline operator, as reflected by delivery tickets, or if such meters are unavailable, by applicable calibration tables. Deliveries to a Terminal rack at Mandan, Salt Lake City or Wilmington from a Tesoro Refinery shall be deemed to be the same as the corresponding volumes delivered contemporaneously from the Terminal rack. Deliveries by book transfer shall be reflected by entries in the books of TLO. All quantities shall be adjusted to net gallons at 60° F in accordance with ASTM D-1250 Petroleum Measurement Tables, or latest revisions thereof. A barrel shall consist of 42 U.S. gallons and a gallon shall contain 231 cubic inches. Meters and temperature probes shall be calibrated according to applicable API standards. Tesoro shall have the right, at its sole expense, and in accordance with rack location procedure, to independently certify said calibration. Storage tank gauging shall be performed by TLO’s personnel. TLO’s gauging shall be deemed accurate unless challenged by an independent certified xxxxxx. Tesoro may perform joint gauging at its sole expense with TLO’s personnel at the time of delivery or receipt of Product, to verify the amount involved. If Tesoro should request an independent xxxxxx, such xxxxxx must be acceptable to TLO, and such gauging shall be at Tesoro’s sole expense.

  • HAZARDOUS SUBSTANCE CONDITIONS If a Hazardous Substance Condition occurs, unless Lessee is legally responsible therefor (in which case Lessee shall make the investigation and remediation thereof required by Applicable Requirements and this Lease shall continue in full force and effect, but subject to Lessor's rights under Paragraph 6.2(c) and Paragraph 13), Lessor may at Lessor's option either (i) investigate and remediate such Hazardous Substance Condition, if required, as soon as reasonably possible at Lessor's expense, in which event this Lease shall continue in full force and effect, or (ii) if the estimated cost to investigate and remediate such condition exceeds twelve (12) times the then monthly Base Rent or $100,000 whichever is greater, give written notice to Lessee within thirty (30) days after receipt by Lessor of knowledge of the occurrence of such Hazardous Substance Condition of Lessor's desire to terminate this Lease as of the date sixty (60) days following the date of such notice. In the event Lessor elects to give such notice of Lessor's intention to terminate this Lease, Lessee shall have the right within ten (10) days after the receipt of such notice to give written notice to Lessor of Lessee's commitment to pay for the excess costs of (a) investigation and remediation of such Hazardous Substance Condition to the extent required by Applicable Requirements, over (b) an amount equal to twelve (12) times the then monthly Base Rent or $100,000, whichever is greater. Lessee shall provide Lessor with the funds required of Lessee or satisfactory assurance thereof within thirty (30) days following said commitment by Lessee. In such event this Lease shall continue in full force and effect, and Lessor shall proceed to make such investigation and remediation as soon as reasonably possible after the required funds are available. If Lessee does not give such notice and provide the required funds or assurance thereof within the time period specified above, this Lease shall terminate as of the date specified in Lessor's notice of termination.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Temperature The Committed Gas shall not have a temperature of less than forty degrees Fahrenheit (40°F) nor more than one hundred twenty degrees Fahrenheit (120°F).

  • Performance Measure The number of Performance Shares earned at the end of the three-year Performance Period will vary depending on the degree to which cumulative adjusted earnings per share performance goals for the Performance Period, as established by the Committee, are met.

  • Cost of Metering The Issuer shall not be obligated to pay any costs associated with the routine metering duties set forth in this Section 2, including the costs of installing, replacing and maintaining meters, nor shall the Issuer be entitled to any credit against the Servicing Fee for any cost savings realized by the Servicer as a result of new metering and/or billing technologies.

Time is Money Join Law Insider Premium to draft better contracts faster.