Storing of Vehicles, Plant and Materials. It is a requirement that, at the end of each work period, all vehicles and plant are returned to the designated camp area allocated to the Contractor. With the approval of the Project Manager / Engineer, certain equipment may remain on or near the work area if the area is properly demarcated. If material is temporarily stored outside the designated campsite, stockpiles shall be limited to a height of 1,0 m above natural ground level.
Appears in 2 contracts
Samples: Nec3 Engineering & Construction Contract, Nec3 Engineering & Construction Contract
Storing of Vehicles, Plant and Materials. It is a requirement that, at the end of each work period, all vehicles and plant are returned to the designated camp area allocated to the Contractor. With the approval of the Project Manager / Engineer, certain equipment may remain on or near the work area if the area is properly demarcated. If material is temporarily stored outside the designated campsite, stockpiles shall be limited to a height of 1,0 1, 0 m above natural ground level.
Appears in 2 contracts
Samples: Term Service Contract, Nec 3: Professional Services Contract (Psc)
Storing of Vehicles, Plant and Materials. It is a requirement that, at the end of each work period, all vehicles and plant are returned to the designated camp area allocated to the Contractor. With the approval of the Project Manager / EngineerService Manager, certain equipment may remain on or near the work area if the area is properly demarcated. If material is temporarily stored outside the designated campsite, stockpiles shall be limited to a height of 1,0 1, 0 m above natural ground level.
Appears in 1 contract
Samples: Nec 3: Term Service Contract (Tsc)