Storm Sewer System Sample Clauses

Storm Sewer System. (a) The Owner undertakes the installation, repair, and forever maintenance the private storm water system as identified in the Site Servicing Plan and Grading Plan, prepared by Caledon Hills Engineering Ltd., dated July 7, 2016, attached hereto as Schedule ‘D’, and approved by the Director of Public Works.
AutoNDA by SimpleDocs
Storm Sewer System. The Owner undertakes the installation, repair, and forever maintenance of the private storm water system as identified on the Lot Grading Plan.
Storm Sewer System. (a) The Owner shall undertake the installation, repair, and perpetual maintenance of the private storm water system as identified in the Site Servicing & Grading Plan, prepared by Upper Canada Consultants, dated September 27, 2018, attached hereto as Schedule ‘E’, and approved by the Director of Public Works.
Storm Sewer System. (a) The Owner shall ensure all storm water runoff is maintained on-site and does not negatively impact adjacent property.
Storm Sewer System. The Parties acknowledge that the Development Area is within the Sarpy County service area for the Storm Sewer System; however, DISTRICT shall be responsible for maintaining those portions of the Storm Sewer System within the Development Area that are not within the public rights-of-way or within any perpetual drainage easements dedicated to Sarpy County for roadway improvements or for the drainage and conveyance of stormwater and other runoff.
Storm Sewer System. The Parties acknowledge that the Development Area is within CITY’s service area for the Storm Sewer System; however, DEVELOPER shall be responsible for maintaining those portions of the Storm Sewer System within the Development Area that are not within the public rights-of-way or within any perpetual drainage easements dedicated to CITY for roadway improvements or for the drainage and conveyance of stormwater and other runoff.
Storm Sewer System. The Parties acknowledge that the Development Area is not within CITY’s service area for the Storm Sewer System at the time of the execution of this Agreement. The Parties further acknowledge that a connection to the Storm Sewer System is not anticipated until such time that Dedicated Streets are constructed as part of the rezoning and replatting of either Lot 1 or Outlot A. Accordingly, DEVELOPER shall enter into an amendment to this Agreement pursuant to Section 6(C) prior to the construction of any Private or Public Improvement that requires connection to the Storm Sewer System.
AutoNDA by SimpleDocs

Related to Storm Sewer System

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Internet Connectivity School must provide sufficient hardline internet connectivity and the required network configurations (provided in Exhibit A) for each Pixellot System to allow live broadcasts. PlayOn will provide the point-to-point wireless internet base station (“Point to Point”) when needed to deliver hardline internet connectivity to Pixellot Systems installed in outdoor venues; provided that PlayOn is able to select the make and model of the Point to Point system. In the event that School requests, or requires, a specific Point to Point system that is different from what is provided by PlayOn, then School must provide and install the Point to Point system at its own expense.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.