Common use of Storm Water Pollution Prevention Clause in Contracts

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved NOI and SWP3 must be provided to the City. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x estimate. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 18 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved ap- proved NOI and SWP3 must be provided to the City. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved ap- proved NOI and SWP3. The design of all City of Wichita construction projects must include the development of a site-specific erosion control con- trol plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement re- quirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout through- out the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-x- lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 10 contracts

Samples: Agreement, Agreement, Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved NOI and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water 000 Environmental Services 0000 X. Xxxx 0xx Xx. Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL ARTERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods).

Appears in 3 contracts

Samples: Agreement, Agreement, Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved ap- proved NOI and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project pro- ject engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water Division 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must also include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement re- quirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Bidding erosion control as “1 LS” is not allowed. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout through- out the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-x- lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 2 contracts

Samples: Agreement, Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved NOI and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water Division 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. I.E., NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must also include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Bidding erosion control as “1 LS” is not allowed. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 2 contracts

Samples: Agreement, Agreement for Professional Services

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved ap- proved NOI and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project pro- ject engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water Division 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must also include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement re- quirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Bidding erosion control as “1 LS” is not allowed. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout through- out the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-x- lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 1 contract

Samples: Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or moreIn performing work under this contract, the design Consultant must prepare a Notice Contractor shall comply with all federal, state, and local laws and regulations relating to storm water pollution prevention, including but not limited to: o Federal Clean Water Act o California Xxxxxx-Cologne Water Quality Control Act o National Pollutant Discharge Elimination System (NPDES) General Permit No. CAS000002 (NPDES General Construction Permit), and any subsequent reissuances of Intent or amendments thereto o City of Chula Vista Municipal Code Chapter 14.20 o City of Chula Vista Development Storm Water Manual The Contractor shall implement Best Management Practices (BMPs) to prevent the discharge of pollutants to storm water conveyance systems during all phases of construction until the project is completed, and a the site is fully stabilized. Implementation of BMPs shall be to the maximum extent required by federal, state, and local laws and regulations, as well as any contract documents, including Contract Specifications and plans. The Director of Public Works or designee shall have sole discretion in determining if compliance with BMPs requirements has been met or not. The City reserves the right to require modifications in the field to BMPs requirements where the City determines that Contractor-selected BMPs are not effective in preventing the discharge of pollutants to the storm water conveyance system to the extent required by federal, state, and local laws and regulations. Notwithstanding identification or selection of BMPs in the project’s Storm Water Pollution Prevention Plan (SWPPP) or Construction Storm Water Management Plan (CSWMP), the Contractor shall be fully responsible and submit them obligated to implement all necessary BMPs to prevent the discharge of pollutants due to construction activities as required in this section. The Director of Public Works or designee, at their sole discretion, shall determine if implemented BMPs are adequate or if additional BMPs are necessary, in which case the Contractor shall implement additional BMPs needed to comply with the requirements of this section. To ensure compliance with federal, state, or local storm water laws and regulations, the City may take enforcement action as follows: ▪ Stop all other work on the project at no cost to the KDHE for approval. Complete copies of City until the approved NOI and SWP3 must non-compliance is corrected; working days shall continue to be provided assessed ▪ Require revisions to plans at no cost to the City. One hard copy should be provided City ▪ Require modifications/BMPs improvements in the field at no cost to the project engineer upon approvalCity ▪ Assess fines and penalties ▪ Other enforcement action, one electronic copy should as may be included appropriate All costs incurred by the Contractor in complying with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must include the development of a site-specific erosion control plan. The site-specific erosion control plan must be provisions specified in this section are included in the project plans. Every component and requirement contract unit price paid for the various items of the erosion control plan must be separately and accurately accounted work as a measured quantity bid item contained in the engi- xxxx’x estimateproposal and no additional payments will be made for implementation of storm water pollution prevention measures. Please note that careful consideration must For projects disturbing less than one acre of land, the Contractor shall complete and sign a CSWMP (Form 5504B). The Contractor shall select all applicable minimum and recommended BMPs from Tables A and B of Form 5504B and shall implement such BMPs during construction as necessary to prevent pollution of storm water conveyance systems. A completed and signed CSWMP shall be given submitted to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor City prior to issuance of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 “Notice to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)Proceed”.

Appears in 1 contract

Samples: Contractor Services Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved ap- proved NOI and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water Division 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved ap- proved NOI and SWP3. The design of all City of Wichita construction projects must also include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Bidding erosion control as “1 LS” is not allowed. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout through- out the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-x- lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved ap- proved NOI and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water Division 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved ap- proved NOI and SWP3. The design of all City of Wichita construction projects must also include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Bidding erosion control as “1 LS” is not allowed. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout through- out the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-x- lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment A ttachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 1 contract

Samples: Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved NOI and SWP3 must be provided to the City. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer’s estimate. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 1 contract

Samples: Agreement

Storm Water Pollution Prevention. For any fil!Y project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for KDHEfor approval. Complete copies of the approved NOI NOi and SWP3 must be provided to the City, prior to bidding. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water Division 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. - I.E., NEW DEVELOPMENT, ARTE- RIAL AR­ TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI NOi and SWP3. The design of all City of Wichita construction projects must also include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x engineer's estimate. Bidding erosion control as "1 LS" is not allowed. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for responsiblefor the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for submittedfor x-lf of silt fence maintenance. The City’s 's current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for developedfor the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit "A” – CIP Scope of Services " Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)Information

Appears in 1 contract

Samples: Agreement

Storm Water Pollution Prevention. For any project disturbing one acre of ground or more, the design Consultant must prepare a Notice of Intent and a Storm Water Pollution Prevention Plan and submit them to the KDHE for approval. Complete copies of the approved NOI and SWP3 must be provided to the City. One hard copy should be provided to the project engineer upon approval, one electronic copy should be included with your transmittal of PDF plan files, and one additional electronic elec- tronic copy should be sent to the attention of Xxxx Xxxx at the following address: City of Wichita Storm Water 000 X. Xxxx 0xx Xxxxx Xxxxxxx, XX 00000 THIS INCLUDES ALL PROJECTS DISTURBING ONE ACRE OR MORE – I.E. NEW DEVELOPMENT, ARTE- RIAL AR- TERIAL STREETS, DIRT STREETS, BIKE PATHS, SEWER MAINS, ETC. The City of Wichita will, under no circumstance, bid any project without first receiving copies of the KDHE approved NOI and SWP3. The design of all City of Wichita construction projects must include the development of a site-specific erosion control plan. The site-specific erosion control plan must be included in the project plans. Every component and requirement of the erosion control plan must be separately and accurately accounted as a measured quantity bid item in the engi- xxxx’x estimate. Please note that careful consideration must be given to the transition of BMP maintenance responsibilities throughout the course of multi-phased projects. All intended responsibilities must be clearly demonstrated by the bid items. For example, if it is intended that the contractor of a subsequent waterline project be responsible for the maintenance of silt fence installed with a preceding sanitary sewer project, a measured quantity bid item must be submitted for x-lf of silt fence maintenance. The City’s current BMP standard detail sheets shall be included in all plans. These five sheets must be included in every plan set developed for the City of Wichita, regardless of project size. Attachment No. 2 to Exhibit “A” – CIP Scope of Services Required Plan Coordinate Information Arterial Street Projects & Infill (Existing Neighborhoods)

Appears in 1 contract

Samples: Agreement