Structural 3.4.1. Layout structural systems with dimensions and floor elevations. Identify structural systems (including pre-cast, structural steel with composite deck, structural steel bar joists); with preliminary sizing identified. 3.4.2. Identify foundation systems (including fill requirements, piles, caissons, spread footings); with preliminary sizing identified.
Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.
Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;
Elements Defines the individual components under each indicator
Visibility 1. Unless the Council of Europe requests or agrees otherwise, the Grantee shall take all necessary measures to publicise the fact that the Action has been funded within the framework of a Joint Project between the European Union and the Council of Europe. Information given to the press and to the beneficiaries of the Action, all related publicity material, official notices, reports and publications, shall acknowledge that the Action was carried out with a grant from a Joint Project between the European Union and the Council of Europe and shall display in an appropriate way the Joint Projects’ visual identity (for instructions on use of the Joint Projects’ visual identity, see Appendix IV). 2. In cases where equipment or major items have been purchased using funds provided by the European Union or the Council of Europe, the Grantee shall indicate this clearly on that equipment and those major items (including display of the European Union and Council of Europe’s logos), provided that such actions do not jeopardise the safety and security of the Grantee’s staff. 3. The acknowledgement and Joint Projects’ visual identity shall be clearly visible in a manner that will not create any confusion regarding the identification of the Acton as a project of the Grantee and the ownership of the equipment and items by the Grantee. 4. All publications by the Grantee pertaining to the Action that have received funding from a Joint Project between the European Union and the Council of Europe, in whatever form and whatever medium, including the Internet, shall carry the following or a similar disclaimer: “This document has been produced using funds of a Joint Project between the European Union and the Council of Europe. The views expressed herein can in no way be taken to reflect the official opinion of the European Union or the Council of Europe”. 5. If the equipment purchased with a grant from a Joint Project is not transferred to the local partners of the Grantee or to the final recipient of the Action at the end of the implementation period of this Agreement, the visibility requirements as regards this equipment shall continue to apply between the end of the implementation period of this Agreement and the end of the Joint Project, if the latter lasts longer. 6. All layouts of any communication items prepared by the Grantee are subject to approval with the Contact point within the Council of Europe. 7. The Grantee accepts that the European Union and the Council of Europe may publish in any form and medium, including on their websites, the name and address of the Grantee, the purpose and amount of the grant and, if relevant, the percentage of co-financing.
Integrity accountability, honesty and professional, ethical conduct in all that we do. Justice – valuing diversity, achieving health equality, cultural respect and a fair share for all.
Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.
Maps The maps service and features of the iOS Software (“Maps”), including map data coverage, may vary by region. When you use any location-based features within Maps, such as turn-by-turn navigation, traffic and local search, various location-related and usage information may be sent to Apple, including the real-time geographic location of your iOS Device, in order to process your request and help improve Maps. Such location and usage data is collected by Apple in a form that does not personally identify you. By using Maps, you agree and consent to Apple’s and its subsidiaries’ and agents’ transmission, collection, maintenance, processing, and use of this information, to provide and improve the Maps features and service, and other Apple products and services. You may disable the location-based functionality of Maps by going to the Location Services setting on your iOS Device and turning off the individual location setting for Maps. Certain Maps features will however be unavailable if you disable the Location Services setting, such as turn-by-turn navigation.