Structural Backfill Sample Clauses

Structural Backfill. The designated material as indicated in the Contract Documents to attain the proposed grades abutting or adjacent to site structures.
AutoNDA by SimpleDocs
Structural Backfill a. In-place density tests may be performed at all locations where at least one cubic meter of backfill is required. In-place density tests will be performed as often as the Engineer deems necessary to properly control the quality of the compaction work.
Structural Backfill. Backfill behind walls will begin after the walls have achieved enough strength to withstand stresses from compacting equipment. Our field technician will verify the suitability of the backfill material prior to fill placement. He will observe backfill placement and conduct in-place density tests as the fill progresses. Areas of failed tests will be reworked until passing results are achieved. Trench Backfill Our field technician will be present on an as-needed or full-time basis during all phases of trench backfilling unless otherwise directed by your representative. The sand-cone method is preferred to overcome trench corrections which are necessary for the nuclear method and which can sometimes lead to questionable results. The relative compaction will be computed on the basis of the field density determinations for each particular soil type encountered. The maximum density shall be determined in accordance with the ASTM Standard D1557. This determination will be conducted in the laboratory, but each technician is equipped with the necessary apparatus for conducting this test in the field so that immediate test results can be provided, if necessary.

Related to Structural Backfill

  • Structural (i) Structural floor plans and sections with detailing well advanced.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Structural Alterations Company will make no structural alterations to the Premises without the prior written consent of Authority.

  • Structural Adjustment 1. Exceptional measures of limited duration which derogate from the provisions of Article 4 may be taken by the Parties in the form of increased customs duties.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!