STRUCTURAL STEELWORK Sample Clauses

STRUCTURAL STEELWORK a. All structural steelwork shall comply with the Ministry of Roads, Public Works and Housing “Structural Steelwork Specification (1973) and shall be executed by an approved Sub-contractor.
AutoNDA by SimpleDocs
STRUCTURAL STEELWORK. All damaged paint areas are to be repaired in accordance with the original specification after completion of erection All paint to structural steelwork is to be sourced from an approved paint manufacturer and to be applied in accordance with the manufacturers specifications All bolts are to be degreased prior to erection and painted after erection Clean brickwork thoroughly and seal face brickwork with brick dressing 1 On external walls m2 1 969 Clean, prepare and apply one coat professional gypsum and plaster primer or similar approved and two coats Plascon low sheen pure acrylic paint. 2 On internal walls m2 5 723 Two coats interior quality PVA acrylic paint on work in bad condition 3 On slab ceiling m2 1 764 Xxxx No. 13 Paintwork Prepared by Takgalang Consulting Clean entire surface with Polycell Sugar Soap using bristle brooms or brushes or Scotch Brite pads to remove all surface contaminants, rinse with tap water and allow to dry. Remove loose and flaky paint and sand surface to a firm edge, feather edges and dust off. Xxxxx paper any rust areas to bright metal and remove dust. Spot prime bare areas with Plascon Coastcote Primer Red Oxide (SNK 2) and allow 1 hour to dry. Finish with two coats of Nuroof Acrylic Roof Paint (TRP) or Dulux Roofguard (Code: D8) with an Clean, prepare and seal roof covering, Spot prime bare areas with Plascon Coastcote Primer Red Oxide (SNK 2), Finish with two coats of Nuroof Acrylic Roof Paint (TRP) or Dulux Roofguard (Code: D8) 4 On corrugated roof sheeting. m2 513 Prepare, sand down and apply Plascon Rust Remover (PR1). Remove rust conerter with clean water and apply either Plascon Universal Unsercoat (UC1) or Professional Undercoat (PU800) to bare and repaired areas. Apply two coats Plascon Professional Gloss enamel (PSB 1000). Colour: White 5 On windows with burglar bars m2 249 6 On door frames m2 199 7 On gutters, down pipes n.e. 300mm girth m 340 Xxxx No. 13 Paintwork Prepared by Takgalang Consulting Prepare and apply one coat universal undercoat and two coats acrylic emulsion paint 8 On doors m2 895 9 On shelves m2 720 Carried to Collection Xxxx No. 13 Paintwork Prepared by Takgalang Consulting Section No. 3
STRUCTURAL STEELWORK. (CPAP WORK GROUP NO. 134 UNLESS OTHERWISE STATED) Key: Location Description: Un/A Unallocated Descriptions of bolts shall be deemed to include nuts and washers Descriptions of L-shaped and U-shaped anchor bolts shall be deemed to include bending, threading, nuts and washers and embedding in concrete Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete Welded beams in single lengths with flat bearer and connection plates, bolted to steel 1 200 x 200 x 10mm square hollow sections t 2 350 x 350 x 20mm base plates t
STRUCTURAL STEELWORK. Materials and workmanship shall conform with the requirements of B.S. 449. Steel frames, trusses and purlins shall be carried out by a Nominated Sub-Contractor.
STRUCTURAL STEELWORK. CPA WORK GROUP Unless otherwise stated all items in this bill will be Work Group 134 PREAMBLES The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
STRUCTURAL STEELWORK. Descriptions
STRUCTURAL STEELWORK. NOTE: Tenderers are advised to study the "Model Preambles for Trades" before pricing this xxxx
AutoNDA by SimpleDocs
STRUCTURAL STEELWORK. COLLECTION Page No BUILDINGS Bill No. 9 Quantity Rate
STRUCTURAL STEELWORK. All work is required to be in accordance with the latest edition of SANS 2001-CS1 • The Contractor is responsible for the stability of the entire structure and all structural elements during all the erection stages. • All dimensions are required to be verified on site by the Consultant before any fabrication of steelwork commences. • All welding is required to be conducted by coded welders. Supporting documentation is also required to be submitted to the Project Manager for acceptance. All welding is required to comply with AWS D1.1. • All welds are required to be inspected using visual aids. The case of pipelines, the relevant X-Ray testing is to be applied on welded pipe sections. All health and safety requirements are to be adgered to. • The Contractor is required to supply all bolts, washers, nuts etc. for the structural steelwork. • All steelwork and fencing mesh are required to be hot dipped galvanized. • All galvanizing is required be done in accordance with SANS 121. Preparation of steel prior to galvanizing and coating thickness is also required to be in accordance with SANS 121. The table below indicates particular specifications pertaining to SANS 2001-CS1 and must be read in conjunction with the code
STRUCTURAL STEELWORK. Unit Quantity Rate