Common use of Submittals Showing Variation from Contract Clause in Contracts

Submittals Showing Variation from Contract. 24 It shall be the responsibility of the Entity to specifically point out any variation or discrepancy 25 between the shop drawings, product data or manufacturers’ installation instructions submitted and 26 the Construction Documents. 28 The Entity shall make specific mention of all variations, along with an explanation of why they are 29 requested, in its letter of transmittal. 31 Failure by the Entity to identify in its letter of transmittal any variation, discrepancy, or conflict with 32 the Construction Documents shall render the approval null and void, and the Entity shall bear all risk 33 of loss and reconstruction costs or delays. 34 35 If any architectural, plumbing, mechanical, electrical, or structural modifications are required as a 36 result of the approval of shop drawings or manufacturers’ instructions, which deviate from or do not 37 comply with the Construction Documents, those modifications shall be made without extra cost to 38 the District, and without extension of the Contract Time. Any other resultant costs, including but not 39 limited to design fees, and cost incurred by other contractors, or inspection fees, shall be at the 40 expense of the Entity. 41

Appears in 1 contract

Samples: Facilities Lease Agreement

AutoNDA by SimpleDocs

Submittals Showing Variation from Contract. 24 13 It shall be the responsibility of the Entity to specifically point out any variation or discrepancy 25 between the 14 shop drawings, product data or manufacturers’ installation instructions submitted and 26 the Construction 15 Documents. 28 17 The Entity shall make specific mention of all variations, along with an explanation of why they are 29 requested, 18 in its letter of transmittal. 31 19 20 Failure by the Entity to identify in its letter of transmittal any variation, discrepancy, or conflict with 32 the 21 Construction Documents shall render the approval null and void, and the Entity shall bear all risk 33 of loss and 22 reconstruction costs or delays. 34 35 23 24 If any architectural, plumbing, mechanical, electrical, or structural modifications are required as a 36 result of the 25 approval of shop drawings or manufacturers’ instructions, which deviate from or do not 37 comply with the 26 Construction Documents, those modifications shall be made without extra cost to 38 the District, and without 27 extension of the Contract Time. Any other resultant costs, including but not 39 limited to design fees, and cost 28 incurred by other contractors, or inspection fees, shall be at the 40 expense of the Entity. 4129

Appears in 1 contract

Samples: Facilities Lease Agreement

Submittals Showing Variation from Contract. 24 14 It shall be the responsibility of the Entity to specifically point out any variation or discrepancy 25 between the 15 shop drawings, product data or manufacturers’ installation instructions submitted and 26 the Construction 16 Documents. 28 17 18 The Entity shall make specific mention of all variations, along with an explanation of why they are 29 requested, 19 in its letter of transmittal. 31 20 21 Failure by the Entity to identify in its letter of transmittal any variation, discrepancy, or conflict with 32 the 22 Construction Documents shall render the approval null and void, and the Entity shall bear all risk 33 of loss and 23 reconstruction costs or delays. 34 35 24 25 If any architectural, plumbing, mechanical, electrical, or structural modifications are required as a 36 result of the 26 approval of shop drawings or manufacturers’ instructions, which deviate from or do not 37 comply with the 27 Construction Documents, those modifications shall be made without extra cost to 38 the District, and without 28 extension of the Contract Time. Any other resultant costs, including but not 39 limited to design fees, and cost 29 incurred by other contractors, or inspection fees, shall be at the 40 expense of the Entity. 4130

Appears in 1 contract

Samples: Facilities Lease Agreement

AutoNDA by SimpleDocs

Submittals Showing Variation from Contract. 24 13 It shall be the responsibility of the Entity to specifically point out any variation or discrepancy 25 between the 14 shop drawings, product data or manufacturers’ installation instructions submitted and 26 the Construction 15 Documents. 28 16 17 The Entity shall make specific mention of all variations, along with an explanation of why they are 29 requested, 18 in its letter of transmittal. 31 20 Failure by the Entity to identify in its letter of transmittal any variation, discrepancy, or conflict with 32 the 21 Construction Documents shall render the approval null and void, and the Entity shall bear all risk 33 of loss and 22 reconstruction costs or delays. 34 35 23 24 If any architectural, plumbing, mechanical, electrical, or structural modifications are required as a 36 result of the 25 approval of shop drawings or manufacturers’ instructions, which deviate from or do not 37 comply with the 26 Construction Documents, those modifications shall be made without extra cost to 38 the District, and without 27 extension of the Contract Time. Any other resultant costs, including but not 39 limited to design fees, and cost 28 incurred by other contractors, or inspection fees, shall be at the 40 expense of the Entity. 4129

Appears in 1 contract

Samples: Facilities Lease Agreement