Summary of One-Message Protocols Sample Clauses

Summary of One-Message Protocols. If random variables distributed according to a distribution PXYZ with cor- relation at least α and leakage at most β < α2 are given, our results up to now give several one-message key agreement protocols. Namely, we can 3This is in contrast to Theorems 3.13 and 3.15, where we studied how the number of ran- dom variable grows depending on the number of key bits as well as the security sepa- rately. The main reason for this is that in Theorems 3.13 and 3.15 it is possible to achieve a rate arbitrarily close to the one-message key rate. In Theorem 4.14 the use of Lemma 4.13 prevents us from achieving the rate in the first place. We thus give the simpler version of Theorem 4.14 which costs only constant factors.
AutoNDA by SimpleDocs

Related to Summary of One-Message Protocols

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Traditional IRA-to-Xxxx XXX Conversions If you convert to a Xxxx XXX, the amount of the conversion from your Traditional IRA to your Xxxx XXX will be treated as a distribution for income tax purposes, and is includible in your gross income (except for any nondeductible contributions). Although the conversion amount generally is included in income, the 10 percent early distribution penalty tax will not apply to conversions from a Traditional IRA to a Xxxx XXX, regardless of whether you qualify for any exceptions to the 10 percent penalty tax. If you are required to take a required minimum distribution for the year, you must remove your required minimum distribution before converting your Traditional IRA.

  • Protocol No action to coerce or censor or penalize any negotiation participant shall be made or implied by any other member as a result of participation in the negotiation process.

  • Summary of State Ethics Laws Pursuant to the requirements of section 1-101qq of the Connecticut General Statutes, the summary of State ethics laws developed by the State Ethics Commission pursuant to section 1-81b of the Connecticut General Statutes is incorporated by reference into and made a part of the Contract as if the summary had been fully set forth in the Contract.

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

  • Data Universal Number System (DUNS) number Requirement Grantee will provide their valid DUNS number contemporaneous with execution of this Agreement.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

Time is Money Join Law Insider Premium to draft better contracts faster.