Supplement 5 Sample Clauses

Supplement 5 
AutoNDA by SimpleDocs

Related to Supplement 5

  • Supplement Any term contained in the Supplement shall supercede any conflicting term contained herein.

  • Supplements Notwithstanding anything to the contrary contained herein, the Company may enter into any Supplement providing for the issuance of one or more Series of Additional Notes consistent with Section 2.2 hereof without obtaining the consent of any holder of any other Series of Notes.

  • Appendix B Amendments The following Appendix B clauses are hereby amended as follows:

  • Master Definitions Supplement All terms and expressions used in this Agreement shall have the same meaning as those contained in the Master Definitions Supplement to the CAISO Tariff.

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

  • Supplemental Contract A teacher’s contract(s) for assigned and accepted services during hours that are in addition to those paid for in the teacher’s base contract or in contract addendum(s).

  • Supplemental Terms Certain of our Services are subject to additional terms and you agree to be bound by those additional terms to the extent you access such Services, a l of which sha l form a part of this XXXX with respect to those Services. If the supplemental terms applicable to a particular Service conflict with this XXXX, the supplemental terms sha l control in the event of any conflict with this XXXX.

  • Supplemental Agreement If the State finds that the work does constitute additional work, the State shall so advise the Engineer and a written supplemental agreement will be executed as provided in General Provisions, Article 6,

  • Supplementary Terms Other Contributions

  • Amendments, Etc No amendment or waiver of any provision of this Agreement or any other Loan Document, and no consent to any departure by the Borrower or any other Loan Party therefrom, shall be effective unless in writing signed by the Required Lenders and the Borrower or the applicable Loan Party, as the case may be, and acknowledged by the Administrative Agent, and each such waiver or consent shall be effective only in the specific instance and for the specific purpose for which given; provided, however, that no such amendment, waiver or consent shall:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!