SUPPLEMENTARY PREAMBLES Sample Clauses
SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" 1 Panes not exceeding 0,1 m2 m2 3 SMD2 Bill No. 11 GLAZING Item No Quantity Rate Amount SECTION 3 BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 7 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 7 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD2 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD2 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD2 BVI CONSULTING ENGINEERS Amount R No SECTION 4 BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, ▇▇▇▇▇▇, shrubs,▇▇▇▇ and trees not exceeding 200mm girth, etc. m2 103 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 103 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 24 4 Pit m3 42 5 For aprons thickenning m3 5 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 71 7 Hard rock m3 71 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 53 Carried Forward Section No. 4 MD6 ▇▇▇▇ ▇▇. 1 EARTHWORKS BVI CONSULTING ENGINEERS R 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 112 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 1...
SUPPLEMENTARY PREAMBLES. Cost of tests:
SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" 1 30mm thick on floors m2 17
SUPPLEMENTARY PREAMBLES. Descriptions
SUPPLEMENTARY PREAMBLES. Particle board:
SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" Sizes in descriptions Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick Hollow walls etc Descriptions of hollow walls shall be deemed to include leaving every fifth perpend of the bottom course of the external skin open as a weep hole. Walls in two skins described as "bagged and sealed" shall be deemed to include having the outer face of the inner skin bagged with 1:6 cement and sand mixture and sealed with two coats "Brixeal" bitumen emulsion waterproofing coating. User note: The above preamble generally applies for works in hot and humid coastal areas Face bricks Bricks shall be ordered timeously to obtain uniformity in size and colour Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc
SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" 1 Strip footings m³ 2 2 Ditto, but surface bed in pit m³ 1 3 2Aprons cast in panels m³ 2 4 Extra over concrete in surface beds for thickening 85mm deep the bottom including all excavation, backfilling etc. m 10 5 Thickening down apron on edge 110mm deep x 200mm wide m 7 6 Slabs m³ 2 7 Aprons and pavings to falls m² 23
SUPPLEMENTARY PREAMBLES. Works on site View site Old materials are to be carted away Old materials are not to be re-used Removal from site Handing over of materials Asbestos cement materials Noise and disturbance Dust pollution General Prices NOTE
SUPPLEMENTARY PREAMBLES. Joinery: Sizes: Prices NOTE
SUPPLEMENTARY PREAMBLES. For preambles see "Specifications of materials and methods to be used - PW 371" NOTE : Unless otherwise stated herein, all items in this bill shall be deemed to fall into Work Group No. 124 for CPAP formula purposes 1 Allow the Provisional Amount of R12 000.00 (Twelve Thousand Rand) for supply and installation of roof sheeting Item 1
