Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.
Project Site The “Project Site” is the place where the Work is being carried on.
Dangerous Materials Tenant shall not keep or have on the Premises any article or thing of a dangerous, flammable, or explosive character that might substantially increase the danger of fire on the Premises, or that might be considered hazardous by a responsible insurance company, unless the prior written consent of Landlord is obtained and proof of adequate insurance protection is provided by Tenant to Landlord.
Samples The Contractor shall submit the following samples of Materials and relevant information to the Authority’s Engineer for pre-construction review: (a) manufacturer's test reports and standard samples of manufactured Materials; and (b) samples of such other Materials as the Authority’s Engineer may require.
Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.
The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.
Studies The clinical, pre-clinical and other studies and tests conducted by or on behalf of or sponsored by the Company or its subsidiaries that are described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus were and, if still pending, are being conducted in accordance in all material respects with all statutes, laws, rules and regulations, as applicable (including, without limitation, those administered by the FDA or by any foreign, federal, state or local governmental or regulatory authority performing functions similar to those performed by the FDA). The descriptions of the results of such studies and tests that are described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus are accurate and complete in all material respects and fairly present the published data derived from such studies and tests, and each of the Company and its subsidiaries has no knowledge of other studies or tests the results of which are materially inconsistent with or otherwise call into question the results described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus. Except as described in the Registration Statement, the Pricing Disclosure Package and the Prospectus, neither the Company nor its subsidiaries has received any notices or other correspondence from the FDA or any other foreign, federal, state or local governmental or regulatory authority performing functions similar to those performed by the FDA with respect to any ongoing clinical or pre-clinical studies or tests requiring the termination or suspension of such studies or tests. For the avoidance of doubt, the Company makes no representation or warranty that the results of any studies, tests or preclinical or clinical trials conducted by or on behalf of the Company will be sufficient to obtain governmental approval from the FDA or any foreign, state or local governmental body exercising comparable authority.
Animals The Hirer shall ensure that no animals (including birds) except guide dogs are brought into the premises, other than for a special event agreed to by the Village Hall. No animals whatsoever are to enter the kitchen at any time.
Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.
Hazardous Substances The words "Hazardous Substances" mean materials that, because of their quantity, concentration or physical, chemical or infectious characteristics, may cause or pose a present or potential hazard to human health or the environment when improperly used, treated, stored, disposed of, generated, manufactured, transported or otherwise handled. The words "Hazardous Substances" are used in their very broadest sense and include without limitation any and all hazardous or toxic substances, materials or waste as defined by or listed under the Environmental Laws. The term "Hazardous Substances" also includes, without limitation, petroleum and petroleum by-products or any fraction thereof and asbestos.