Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.
Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.
Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.
Standard Service Features Ethernet Access allows Customer to terminate single and/or multiple Ethernet Virtual Circuits (EVCs) from Customer equipment onto a single Ethernet Access UNI.
ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.
Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. Experience: A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Unbundled Port Features 4.2.10.1 Charges for Unbundled Port are as set forth in Exhibit A, and as specified in such exhibit, may or may not include individual features.
ROAD TOLERANCES Purchaser shall perform road work within the tolerances listed below. The tolerance class for each road is listed on the TYPICAL SECTION SHEET. Tolerance Class A B C Road and Subgrade Width (feet) +1.5 +1.5 +2.0 Subgrade Elevation (feet +/-) 0.5 1.0 2.0 Centerline alignment (feet lt./rt.) 1.0 1.5 3.0 1-6 ORDER OF PRECEDENCE Any conflict or inconsistency in the road plan will be resolved by giving the documents precedence in the following order:
Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.