Suspended Structural Slab. The elevated floor slabs of this building are of post-tension concrete construction. Any attachments for mechanical, electrical, or architectural elements shall be limited to a 1” maximum drilled or driven anchor embedment. If deeper embedment or core drilling is required, the slab shall be scanned to locate PT tendons and location adjusted to provide at least 3” clear from any PT tendon. In the event that PT tendons become damaged or cut, they must be repaired to bring the building back to the original design condition. Cost of these repairs shall be the responsibility of the Contactor. 3. Walls: Demising wall(s) shall be unpainted masonry or unpainted drywall finish, taped over stud, Tenant shall be responsible for final preparation and finish. Height shall be determined by Project Architect. Any cross partition(s) shall be Tenant’s responsibility. Exterior and rear wall(s) shall be unpainted masonry or concrete finish or such other material(s) as selected by Project Architect.
Appears in 4 contracts
Samples: Office Lease (Recursion Pharmaceuticals, Inc.), Office Lease (Recursion Pharmaceuticals, Inc.), Office Lease (Recursion Pharmaceuticals, Inc.)