Swine Sites Sample Clauses

Swine Sites. The six swine farms that had lagoons monitored as part of the NAEMS are listed in Table 2-1. The swine manure lagoon emissions were measured continuously at one farm (IN4A) for one year and up to 21 days for each season over two years at the remaining farms (IA3A, NC3A, NC4A, OK3A, OK4A). The sampling periods for each site are also listed in Table 2-1. Sites for monitoring were selected to capture different stages (i.e., breeding-gestation and growing-to-fishing) and manure practices typical of the industry. The sites also represent the broad geographical extent of swine production to also represent different climatological settings for farm and any regional differences in farm practices.
AutoNDA by SimpleDocs

Related to Swine Sites

  • Porcupine Site Highway 11

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Sites Sites shall mean the locations set forth in the Contract Documentation.

  • Copper Subloops Sprint will make available access to copper subloops on an unbundled basis. A copper subloop is a portion of a Copper Loop, or Hybrid Loop, and is comprised entirely of copper wire or copper cable that acts as a transmission facility between any accessible terminal in Sprint’s outside plant, including inside wire owned or controlled by Sprint, and the end-user customer premises. A copper subloop can also include intermediate devices, such as repeaters, used to establish the transmission path. Copper subloops can be used by CLEC to provide voice-grade services as well as digital subscriber line services. Access to copper subloops is subject to the collocation provisions of this Agreement. Copper subloop consists of the distribution portion of the copper loop. Sprint is not obligated to offer feeder loop plant as a stand-alone UNE.

  • Alpine Areas The employer shall pay an Alpine disability allowance of $2.50 per hour worked on projects in alpine areas.

  • SUBLOOPS 45.1. Sprint will offer unbundled access to copper subloops and subloops for access to multiunit premises wiring. Sprint will consider all requests for access to subloops through the ICB process due to the wide variety of interconnections available and the lack of standards. A written response will be provided to CLEC covering the interconnection time intervals, prices and other information based on the ICB process as set forth in this Agreement.

  • Travelling, Transport and Fares (a) An employee required and authorised to use their own motor vehicle in the course of their duties will be paid not less than the allowance set out in item 21 in Table 2.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.