Synderville West Parcel Sample Clauses

Synderville West Parcel. Ordinance was previously adopted to permit 40 multi-family dwelling units on the Snyderville West parcel (the “Xxxxxx Units”). The Xxxxxx Units must be tightly clustered and shall be comparable in size to other Canyons Resort accommodation units. The total gross square footage permitted shall not exceed 80,000 on approximately four acres identifies as Parcel SW1 in Exhibit B.1. All future development that will occur as result of the Xxxxxx Units will require final site plan approval. The actual building area for these density transfers shall be determined through specific site plan approval in conjunction with the comprehensive amendment to the Canyons SPA Plan that further identifies other development potential and location requirements on the Snyderville West parcel. The Xxxxxx units must also occur in a manner consistent with the Snyderville Basin General Plan, the Code, and the Global Principles.
AutoNDA by SimpleDocs

Related to Synderville West Parcel

  • Connecting Transmission Owner’s Attachment Facilities Connecting Transmission Owner shall design, procure, construct, install, own and/or control the Connecting Transmission Owner’s Attachment Facilities described in Appendix A hereto, at the sole expense of the Developer.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Parcelle no 29 : Lot 26-152 Ptie Une partie de la subdivision CENT CINQUANTE-DEUX du lot originaire VINGT-SIX (26-152 Ptie), bornée vers le nord par le lot 26-151, vers l'est par le lot 26-163 ptie, vers le sud par le lot 26-153 ptie, vers le sud-ouest par le lot 26-717 et vers l'ouest par le lot 26-150 ptie et mesure trente mètres et quarante-huit centièmes (30,48 m) vers le nord, quinze mètres et vingt-quatre centièmes (15,24 m) vers l'est, vingt-huit mètres et quatre-vingt-quinze centièmes (28,95 m) vers le sud, deux mètres et vingt-quatre centièmes (2,24 m) vers le sud-ouest et treize mètres et soixante centièmes (13,60 m) vers l'ouest; contenant une superficie de quatre cent soixante-trois mètres carrés et trois dixièmes (463,3 m2).

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location.

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner [shall/shall not] transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

Time is Money Join Law Insider Premium to draft better contracts faster.