Tarifa total, Tarifa Sample Clauses

Tarifa total, Tarifa. 7.1.1. Salvo indicação expressa em contrário da Wizz Air, a Tarifa total inclui a Tarifa, impostos, encargos, Taxas aplicáveis a outros serviços e a taxa dos Serviços adicionais (se aplicável). Serão disponibilizadas ao Cliente informações sobre os elementos que compõem a Tarifa total e respetivos xxxxxxxxx xxxxxxx o processo de reserva no Web site ou no Centro de atendimento da Wizz Air, consoante o meio utilizado para efetuar a reserva.
AutoNDA by SimpleDocs

Related to Tarifa total, Tarifa

  • CFR 200 328. Failure to submit such required Performance Reports may cause a delay or suspension of funding. 30 ILCS 705/1 et seq.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting the HUB Program at 000-000-0000 or toll-free in Texas at 0-000-000-0000.

  • Bilingual Differential When formally assigned in the employee’s position description, an employee assigned to interpret to or from another language to English will receive a differential of five percent (5%) of base pay.

  • Terminating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Subtotal (h) Add Bond and Insurance, not to exceed percent ( %) of Item (g)

  • Agreement Xxx 0000 Part 3 Provisions relating to Balmoral South Iron Ore Project and certain other matters Division 2 Main provisions s. 14

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Xxxxxxxx, 121 Cal App.4th Supp. 7 (2004), CIV Code 1962 Colorado $50.00 or 5% of past due rent C.R.S. § 00-00-000 Connecticut Not defined No statute Delaware 5% of the monthly rent amount Title 25, § 5501(d) Florida Not defined No statute Georgia “All contracts for rent shall bear interest from the time the rent is due” Hawaii 8% of the monthly rent amount § 521-21(f) Idaho Not defined No statute Illinois Outside Chicago – Not defined Chicago only – $10.00 per month for the first $500.00 in monthly rent plus five percent per month for any amount in excess of $500.00 in monthly rent for the late payment of rent. No statute 5-12-140(h) Indiana Not defined No statute Iowa If the rent does not exceed $700/month, the late fee cannot exceed more than $12/day per day or $60/month. If the rent is greater than $700/month, the late cannot exceed more than $20/day or $100/month.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

Time is Money Join Law Insider Premium to draft better contracts faster.