Common use of TASKS TO BE COMPLETED Clause in Contracts

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

AutoNDA by SimpleDocs

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary DocuSign Envelope ID: 5A4B2A04-AB42-4F1D-86C2-8DC63A4F1877 Contract No. 36-7IDP5040 monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata. DocuSign Envelope ID: 5A4B2A04-AB42-4F1D-86C2-8DC63A4F1877 Contract No. 36-7IDP5040  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State.. DocuSign Envelope ID: 268EB37E-8EC6-41D6-B053-8569192F499C viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. DocuSign Envelope ID: 268EB37E-8EC6-41D6-B053-8569192F499C • Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities.. WAs Used DocuSign Envelope ID: 90FFDF48-FE33-4BE1-8ADC-C0A4A25F26F5 iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: WAs Used DocuSign Envelope ID: 90FFDF48-FE33-4BE1-8ADC-C0A4A25F26F5  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys WAs Used DocuSign Envelope ID: 90FFDF48-FE33-4BE1-8ADC-C0A4A25F26F5 The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary DocuSign Envelope ID: 755916F5-E427-4259-8102-3412FE826C86 Contract No. 36-7IDP5041 monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata. DocuSign Envelope ID: 755916F5-E427-4259-8102-3412FE826C86 Contract No. 36-7IDP5041  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare prepare, sign, seal, and date a Survey Control Index sheet and one or more Horizontal and Vertical Control sheet(s) for insertion DocuSign Envelope ID: B50A5CB2-3F75-491E-8BE3-52A791E1F682 WAs Used Contract No. 13-8SDP5004 into the plan set. The Engineer shall cause the signing, sealing, and dating of the Survey Control Index Sheet and a any Horizontal and Vertical Control Sheet(s), signed, sealed and dated Sheets by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan setregistered professional land surveyor (RPLS). The Survey Control Index Sheet sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies sheets identify the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet sheet and the Horizontal and Vertical Control Sheet(ssheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s TxDOT website. The following information shall be shown on the Survey Control Index SheetSheet must contain the following: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow  Placement of • The note “The survey control information has been accepted and incorporated into this PS&E”, which shall must be signed, sealed and dated by a Texas Professional Engineer employed by the State  Engineer. • RPLS signature, seal, and date  The State’s • TxDOT title block containing District Name, County, Highway, and CSJ The following information shall be shown on all CSJ. Each Horizontal and Vertical Control Sheetssheet must contain the following: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). DocuSign Envelope ID: B50A5CB2-3F75-491E-8BE3-52A791E1F682 WAs Used Contract No. 13-8SDP5004 • Relevant metadata. Graphic (Bar) Scale.  Placement of • The note “The survey control information has been accepted and incorporated into this PS&E”, which shall must be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s • TxDOT title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements.. DocuSign Envelope ID: F9AD1D3C-C2EE-4E82-9C7E-21604456077D iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: F9AD1D3C-C2EE-4E82-9C7E-21604456077D The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. 3.2. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. :  Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. .  Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. .  Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DFDA7E8B68-BDDE-5670501BD1AD xii9EB5-4D54-A1F2-12D96602168D WAs Used Legacy Contract No. 20-8SDP5001 PeopleSoft Contract No. 8588  Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare prepare, sign, seal, and date a Survey Control Index sheet and one or more Horizontal and Vertical Control sheet(s) for insertion into the plan set The Engineer shall cause the signing, sealing, and dating of the Survey Control Index Sheet and a any Horizontal and Vertical Control Sheet(s), signed, sealed and dated Sheets by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan setregistered professional land surveyor (RPLS). The Survey Control Index Sheet sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies sheets identify the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet sheet and the Horizontal and Vertical Control Sheet(ssheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s TxDOT website. The following information shall be shown on the Survey Control Index SheetSheet must contain the following:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of The note “The survey control information has been accepted and incorporated into this PS&E”, which shall must be signed, sealed and dated by a Texas Professional Engineer employed by the State Engineer.  RPLS signature, seal, and date  The State’s TxDOT title block containing District Name, County, Highway, and CSJ The following information shall be shown on all CSJ. Each Horizontal and Vertical Control Sheetssheet must contain the following:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement. DocuSign Envelope ID: DA7E8B68-9EB5-4D54-A1F2-12D96602168D WAs Used Legacy Contract No. 20-8SDP5001 PeopleSoft Contract No. 8588  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: F2FBC84C-FAF2-48EB-B372-AE084F522D98 DocuSign Envelope ID: FF5C91A2-ECF2-41F9-B9A9-7A5C5F04D96D Contract No. 36-6IDP5370 PeopleSoft Contract No. 5685 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: F2FBC84C-FAF2-48EB-B372-AE084F522D98 DocuSign Envelope ID: FF5C91A2-ECF2-41F9-B9A9-7A5C5F04D96D Contract No. 36-6IDP5370 PeopleSoft Contract No. 5685 The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: F2FBC84C-FAF2-48EB-B372-AE084F522D98 DocuSign Envelope ID: FF5C91A2-ECF2-41F9-B9A9-7A5C5F04D96D Contract No. 36-6IDP5370 PeopleSoft Contract No. 5685

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DFC10691C7-BDDE-5670501BD1ADE673-4544-A340-5ADD28C1973F xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DFC10691C7-BDDE-5670501BD1AD E673-4544-A340-5ADD28C1973F  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the DocuSign Envelope ID: 08011FCF-93C2-4F54-8A05-20A33047A1D8 Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). DocuSign Envelope ID: 08011FCF-93C2-4F54-8A05-20A33047A1D8 • Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed sealed, and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. DocuSign Envelope ID: 117D111C-A794-4428-BDF3-5CF841540F29 • Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare prepare, sign, seal, and date a Survey Control Index sheet and one or more Horizontal and Vertical Control sheet(s) for insertion into the plan set. The Engineer shall cause the signing, sealing, and dating of the Survey Control Index Sheet and a any Horizontal and Vertical Control Sheet(s), signed, sealed and dated Sheets by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan setregistered professional land surveyor (RPLS). The Survey Control Index Sheet sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies sheets identify the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet sheet and the Horizontal and Vertical Control Sheet(ssheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s TxDOT website. The following information shall be shown on the Survey Control Index SheetSheet must contain the following: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow  Placement of • The note “The survey control information has been accepted and incorporated into this PS&E”, which shall must be signed, sealed and dated by a Texas Professional Engineer employed by the State  Engineer. • RPLS signature, seal, and date  The State’s • TxDOT title block containing District Name, County, Highway, and CSJ The following information shall be shown on all CSJ. Each Horizontal and Vertical Control Sheetssheet must contain the following: DocuSign Envelope ID: 117D111C-A794-4428-BDF3-5CF841540F29 • Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. DocuSign Envelope ID: 5A2DC6EC-64DB-4A02-A984-B96FAAFF8279 The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the StateEngineer. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. 3.2. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. DocuSign Envelope ID: 5A2DC6EC-64DB-4A02-A984-B96FAAFF8279 • Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. . • Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands. vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in DocuSign Envelope ID: 8B0EE02C-E455-423C-9476-3FA4EBD98809 the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ.. DocuSign Envelope ID: 8B0EE02C-E455-423C-9476-3FA4EBD98809 b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services Supplemental Agreement No. 1

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF1FDB1C48-BDDE-5670501BD1AD24B1-4C40-8A33-17263E465FE2 xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 1FDB1C48-24B1-4C40-8A33-17263E465FE2 • Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF4F9A8FEF-BDDE-5670501BD1ADB719-472C-BF25-DD3B0F7B4A55 xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 4F9A8FEF-B719-472C-BF25-DD3B0F7B4A55 • Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Engineer’s Surveyors shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and DocuSign Envelope ID: 8F4C5F80-CEA4-4B7A-AA13-EF50310E0F8C dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata. DocuSign Envelope ID: 8F4C5F80-CEA4-4B7A-AA13-EF50310E0F8C  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Engineer’s Surveyors shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and DocuSign Envelope ID: CB7B82B2-FA3B-4DDD-957A-C5AE0E5F436A dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. DocuSign Envelope ID: CB7B82B2-FA3B-4DDD-957A-C5AE0E5F436A • Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities.. DocuSign Envelope ID: F5F9599C-AC54-400E-849C-0CCD6FB5B5A4 iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points DocuSign Envelope ID: F5F9599C-AC54-400E-849C-0CCD6FB5B5A4 • Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline.. DocuSign Envelope ID: F5F9599C-AC54-400E-849C-0CCD6FB5B5A4 iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes.. DocuSign Envelope ID: 923E8011-1E2D-416E-8D69-5FFD494D36B6 xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. DocuSign Envelope ID: 923E8011-1E2D-416E-8D69-5FFD494D36B6 • Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: 0FF49D32-D279-4718-B36E-004C4194E751 DocuSign Envelope ID: 33059790-9D6A-4832-8E47-37328128C4A4 Contract No. 36-6IDP5430 PeopleSoft Contract No. 5682 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: 0FF49D32-D279-4718-B36E-004C4194E751 DocuSign Envelope ID: 33059790-9D6A-4832-8E47-37328128C4A4 Contract No. 36-6IDP5430 PeopleSoft Contract No. 5682 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: 0FF49D32-D279-4718-B36E-004C4194E751 DocuSign Envelope ID: 33059790-9D6A-4832-8E47-37328128C4A4 Contract No. 36-6IDP5430 PeopleSoft Contract No. 5682

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF6E947759-BDDE-5670501BD1AD576A-49BF-B09E-4E609A5FAD15 xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF6E947759-BDDE-5670501BD1AD  576A-49BF-B09E-4E609A5FAD15 • Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF1633DD6A-35FF-47A8-BDDE-5670501BD1ADA516-41454E08B6A2 xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 1633DD6A-35FF-47A8-A516-41454E08B6A2 • Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State.. DocuSign Envelope ID: FC524C0C-BAFB-441A-85AF-7C800695AEF9 viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: DocuSign Envelope ID: FC524C0C-BAFB-441A-85AF-7C800695AEF9  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points.. DocuSign Envelope ID: FC524C0C-BAFB-441A-85AF-7C800695AEF9 viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands.. DocuSign Envelope ID: 1002E2E3-BC52-4ACD-8D2D-AFD1F5A80BD8 vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: 1002E2E3-BC52-4ACD-8D2D-AFD1F5A80BD8 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points.. DocuSign Envelope ID: 1002E2E3-BC52-4ACD-8D2D-AFD1F5A80BD8 viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State.. DocuSign Envelope ID: 9A5E574C-F6F1-4EA5-A0CA-CDE46BF87198 viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: 9A5E574C-F6F1-4EA5-A0CA-CDE46BF87198 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points.. DocuSign Envelope ID: 9A5E574C-F6F1-4EA5-A0CA-CDE46BF87198 vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: 04C16B52-6FE2-4CCA-85E1-65F1BBF3295C DocuSign Envelope ID: 4ADCA196-070B-414B-84B9-71706552ABDA Contract No. 36-6IDP5366 PeopleSoft Contract No. 5681 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: 04C16B52-6FE2-4CCA-85E1-65F1BBF3295C DocuSign Envelope ID: 4ADCA196-070B-414B-84B9-71706552ABDA Contract No. 36-6IDP5366 PeopleSoft Contract No. 5681 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: 04C16B52-6FE2-4CCA-85E1-65F1BBF3295C DocuSign Envelope ID: 4ADCA196-070B-414B-84B9-71706552ABDA Contract No. 36-6IDP5366 PeopleSoft Contract No. 5681

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF67BE971E-0630-BDDE-5670501BD1AD4766-AF8B-DD185CC2653B xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 67BE971E-0630-4766-AF8B-DD185CC2653B  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. DocuSign Envelope ID: A2C96816-AFCF-4B6A-9B51-D8FCE6C6223E DocuSign Envelope ID: 81600B2C-53E9-4E39-BA73-002AB2A7A001 • Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare prepare, sign, seal, and date a Survey Control Index sheet and one or more Horizontal and Vertical Control sheet(s) for insertion into the plan set. The Engineer shall cause the signing, sealing, and dating of the Survey Control Index Sheet and a any Horizontal and Vertical Control Sheet(s), signed, sealed and dated Sheets by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan setregistered professional land surveyor (RPLS). The Survey Control Index Sheet sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies sheets identify the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet sheet and the Horizontal and Vertical Control Sheet(ssheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s TxDOT website. The following information shall be shown on the Survey Control Index SheetSheet must contain the following: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow  Placement of • The note “The survey control information has been accepted and incorporated into this PS&E”, which shall must be signed, sealed and dated by a Texas Professional Engineer employed by the State  Engineer. • RPLS signature, seal, and date  The State’s • TxDOT title block containing District Name, County, Highway, and CSJ The following information shall be shown on all CSJ. Each Horizontal and Vertical Control Sheetssheet must contain the following: DocuSign Envelope ID: A2C96816-AFCF-4B6A-9B51-D8FCE6C6223E DocuSign Envelope ID: 81600B2C-53E9-4E39-BA73-002AB2A7A001 • Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: BC9C016B-5A52-45C4-B28D-A91989A94E2D DocuSign Envelope ID: DEE8D1E1-E43A-4EEA-8FC1-F207966DDF38 Contract No. 36-6IDP5368 PeopleSoft Contract No. 5683 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: BC9C016B-5A52-45C4-B28D-A91989A94E2D DocuSign Envelope ID: DEE8D1E1-E43A-4EEA-8FC1-F207966DDF38 Contract No. 36-6IDP5368 PeopleSoft Contract No. 5683 The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: BC9C016B-5A52-45C4-B28D-A91989A94E2D DocuSign Envelope ID: DEE8D1E1-E43A-4EEA-8FC1-F207966DDF38 Contract No. 36-6IDP5368 PeopleSoft Contract No. 5683

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities.. DocuSign Envelope ID: 5DA79434-ECA9-4023-A545-0DE02F520026 iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points DocuSign Envelope ID: 5DA79434-ECA9-4023-A545-0DE02F520026 • Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline.. DocuSign Envelope ID: 5DA79434-ECA9-4023-A545-0DE02F520026 iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

AutoNDA by SimpleDocs

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities.. DocuSign Envelope ID: 5914A726-E858-48F5-B640-4A48F639EFB9 iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points DocuSign Envelope ID: 5914A726-E858-48F5-B640-4A48F639EFB9  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline.. DocuSign Envelope ID: 5914A726-E858-48F5-B640-4A48F639EFB9 iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: D3D960FD-BE0E-44B3-803B-B86D69AFA793 DocuSign Envelope ID: D1D750F4-C3E4-4ADA-8F53-8D32970E4F27 Contract No. 36-6IDP5364 PeopleSoft Contract No. 5689 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: D3D960FD-BE0E-44B3-803B-B86D69AFA793 DocuSign Envelope ID: D1D750F4-C3E4-4ADA-8F53-8D32970E4F27 Contract No. 36-6IDP5364 PeopleSoft Contract No. 5689 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: D3D960FD-BE0E-44B3-803B-B86D69AFA793 DocuSign Envelope ID: D1D750F4-C3E4-4ADA-8F53-8D32970E4F27 Contract No. 36-6IDP5364 PeopleSoft Contract No. 5689

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State.. DocuSign Envelope ID: A1F83282-27A1-4756-AFA4-EB689A1E9938 viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: DocuSign Envelope ID: A1F83282-27A1-4756-AFA4-EB689A1E9938 • Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures.. DocuSign Envelope ID: A1F83282-27A1-4756-AFA4-EB689A1E9938 ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain modelstopographic data to supplement flight (voids). ii. Locate existing utilities. iii. Locate topographical features and existing improvementsimprovements to supplement flight. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlandswetlands (as determined by others). vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DFB8DCCCD3-BDDE-5670501BD1ADA0B3-4BAD-BC2D-75E46611CBD6 xi. Collect cross section data at 500-ft and 1000-ft intervals upstream and downstream of Escondido Creek and Xxxxxxxx Creek. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DFB8DCCCD3-BDDE-5670501BD1AD  A0B3-4BAD-BC2D-75E46611CBD6 • Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. DocuSign Envelope ID: E72D88A3-1FD8-4CA6-9F94-B5B0362A640F • Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare prepare, sign, seal, and date a Survey Control Index sheet and one or more Horizontal and Vertical Control sheet(s) for insertion into the plan set. The Engineer shall cause the signing, sealing, and dating of the Survey Control Index Sheet and a any Horizontal and Vertical Control Sheet(s), signed, sealed and dated Sheets by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan setregistered professional land surveyor (RPLS). The Survey Control Index Sheet sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies sheets identify the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet sheet and the Horizontal and Vertical Control Sheet(ssheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s TxDOT website. The following information shall be shown on the Survey Control Index SheetSheet must contain the following: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow  Placement of • The note “The survey control information has been accepted and incorporated into this PS&E”, which shall must be signed, sealed and dated by a Texas Professional Engineer employed by the State  Engineer. • RPLS signature, seal, and date  The State’s • TxDOT title block containing District Name, County, Highway, and CSJ The following information shall be shown on all CSJ. Each Horizontal and Vertical Control Sheetssheet must contain the following: DocuSign Envelope ID: E72D88A3-1FD8-4CA6-9F94-B5B0362A640F • Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: FDEAC86F-5E2C-4774-80F7-D16ABCDC6AED DocuSign Envelope ID: BD8C3DAD-658B-42FA-BFD0-FFECD08D31CF Contract No. 36-6IDP5371 PeopleSoft Contract No. 5690 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: FDEAC86F-5E2C-4774-80F7-D16ABCDC6AED DocuSign Envelope ID: BD8C3DAD-658B-42FA-BFD0-FFECD08D31CF Contract No. 36-6IDP5371 PeopleSoft Contract No. 5690 The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: FDEAC86F-5E2C-4774-80F7-D16ABCDC6AED DocuSign Envelope ID: BD8C3DAD-658B-42FA-BFD0-FFECD08D31CF Contract No. 36-6IDP5371 PeopleSoft Contract No. 5690

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF805C1060-BDDE-5670501BD1AD95ED-4633-B0B2-838F2B4C8721 xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF805C1060-BDDE-5670501BD1AD 95ED-4633-B0B2-838F2B4C8721  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the DocuSign Envelope ID: B8B3CD6B-A26C-4D40-A13B-9771D9AA4591 Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: B8B3CD6B-A26C-4D40-A13B-9771D9AA4591 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points.. DocuSign Envelope ID: B8B3CD6B-A26C-4D40-A13B-9771D9AA4591 vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities.. DocuSign Envelope ID: 4BAE6723-3237-45A4-BD42-9BFB1E839F36 iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points DocuSign Envelope ID: 4BAE6723-3237-45A4-BD42-9BFB1E839F36 • Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline.. DocuSign Envelope ID: 4BAE6723-3237-45A4-BD42-9BFB1E839F36 iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. : • Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. . • Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. . • Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in DocuSign Envelope ID: 81680129-218F-4A62-86EE-68C3C135A630 the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the StateEngineer. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Engineer’s Surveyors shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and DocuSign Envelope ID: 981599F8-5D6E-41E6-ADFA-1DA0DC55F35E dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project  Identification of the control points  Baseline or centerline  Graphic (Bar) Scale  North Arrow  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State  RPLS signature, seal, and date  The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets:  Location for each control point, showing baseline or centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument/benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (State Plan Coordinates [SPC] Zone and surface or grid).  Relevant metadata. DocuSign Envelope ID: 981599F8-5D6E-41E6-ADFA-1DA0DC55F35E  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State.  RPLS signature, seal and date.  The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1. DESIGN SURVEYS a. Obtain or collect data to create cross-sections and digital terrain models. ii. b. Locate and tie existing utilities. iii. c. Locate and tie topographical features and existing improvements. iv. Provide details of d. Locate and tie all existing ROW markers, cross drainage structures, roadway centerline, bridge structures, etc. from 1000 feet prior to the beginning of the project to 1000 feet outside/past the end of the project limits and submit data to the State for review. If no ROW markers of drainage/bridge structures exist within 1000 feet outside the limits of the project, the Engineer shall contact the State for guidance. v. e. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. f. Locate wetlands.. DocuSign Envelope ID: D78C9312-D95C-4FD3-B00A-7CFCC10A2DB4 vii. g. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. h. Locate and tie existing right-of-ways. ix. i. Locate and tie existing access denial lines (ADL) j. Review right-of-way maps. x. k. Locate boreholes. xi. l. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. m. Update existing control data and prepare survey control data sheetssheets (11” X 17”), as directed by the State for inclusion into a construction plan set. n. Use the existing Virtual Reference System in the State’s Corpus Christi District to facilitate surveying provided sufficient cellular coverage is available. In the event cellular coverage is not available, datum shall be based on static observations meeting the specifications for State Level 3 control points. o. Establish additional intervisible secondary project control points based on the GPS primary control points. The Surveyor shall set each control point outside the work area near the ROW line in an effort to protect the control points from being disturbed during construction. The Surveyor shall obtain and provide to the State, the XYZ coordinate data for the control points. The Surveyor shall set these additional control points on both side of the highway at PC and PT centerline points. The Surveyor shall ensure separation of control points do not exceed 1500 feet. Elevations for these points shall be adjusted with a differential level loop. p. Obtain or collect additional elevation data elevations every 100’ at the centerline (crown point) throughout the limits of the project including additional elevations at grade breaks, bridges and 50’ intervals along vertical curves. Provide additional elevations at 50 foot intervals along vertical curves. Provide additional elevations every 50 feet including 400 feet along the tangent at each end of the curves. q. The Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale DocuSign Envelope ID: D78C9312-D95C-4FD3-B00A-7CFCC10A2DB4 • North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. 3.1. Design Surveys The State will request design surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ.. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 b. 3.2. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor Surveys shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State.. DocuSign Envelope ID: 89EF8577-E141-4A85-AE8D-4806D3402448 viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). DocuSign Envelope ID: 89EF8577-E141-4A85-AE8D-4806D3402448 • Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF34ABC29C-BDDE-5670501BD1ADD1A8-49E0-BF33-E68A391DD60F xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 34ABC29C-D1A8-49E0-BF33-E68A391DD60F • Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. DocuSign Envelope ID: C175D39D-61A4-48B5-B25F-2019AF797545 The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ.. DocuSign Envelope ID: C175D39D-61A4-48B5-B25F-2019AF797545 b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Obtain or collect data to create cross-sections and digital terrain models. ii. 2) Locate existing utilities. iii. 3) Locate topographical features and existing improvements. iv. 4) Provide details of existing bridge structures. v. 5) Provide details of existing drainage features features, (e.g., culverts, manholes, etc.). vi. 6) Locate wetlands.. DocuSign Envelope ID: D3D386F2-9BB1-46C4-A6B5-298DBCC339A1 DocuSign Envelope ID: 289281F7-43A6-4F0C-BC8B-BFB572B13384 Contract No. 36-6IDP5376 PeopleSoft Contract No. 5675 vii. 7) Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. 8) Locate existing right-of-ways. ix. 9) Review right-of-way maps. x. 10) Locate boreholes. xi. 11) Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. 12) Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ DocuSign Envelope ID: D3D386F2-9BB1-46C4-A6B5-298DBCC339A1 DocuSign Envelope ID: 289281F7-43A6-4F0C-BC8B-BFB572B13384 Contract No. 36-6IDP5376 PeopleSoft Contract No. 5675 The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: i. 1) Stake existing or proposed right-of-ways. ii. 2) Stake existing or proposed baseline/centerline. iii. 3) Stake proposed bridge structures. iv. 4) Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. 5) Set grade stakes. vi. 6) Recover and check existing control points. vii. 7) Establish additional control points. viii. 8) Check elevations and locations of structures. ix. 9) Determine and resolve conflicts associated with survey data.. DocuSign Envelope ID: D3D386F2-9BB1-46C4-A6B5-298DBCC339A1 DocuSign Envelope ID: 289281F7-43A6-4F0C-BC8B-BFB572B13384 Contract No. 36-6IDP5376 PeopleSoft Contract No. 5675

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF55FA5821-BDDE-5670501BD1ADDA2A-45EA-B48C-DDCD72177D5F xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 55FA5821-DA2A-45EA-B48C-DDCD72177D5F • Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD. xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. DocuSign Envelope ID: 9975A59F-23ED-44FD-9FBF-31C397459A65 The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ.. DocuSign Envelope ID: 9975A59F-23ED-44FD-9FBF-31C397459A65 b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Engineering Services

TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Obtain or collect data to create cross-sections and digital terrain models. ii. Locate existing utilities. iii. Locate topographical features and existing improvements. iv. Provide details of existing bridge structures. v. Provide details of existing drainage features (e.g., culverts, manholes, etc.). vi. Locate wetlands. vii. Establish additional and verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. viii. Locate existing right-of-ways. ix. Review right-of-way maps. x. Locate boreholes. xi. Perform hydrographic surveys. DocuSign Envelope ID: E7364B4B-1AEE-40DF0739EBD5-BDDE-5670501BD1ADD505-46CB-B82C-2C058DE86DA5 xii. Update existing control data and prepare survey control data sheets, as directed by the State for inclusion into a construction plan set. The Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. The following information shall be shown on the Survey Control Index Sheet: Overall view of the project and primary control monuments set for control of the project Identification of the control points Baseline or centerline Graphic (Bar) Scale North Arrow Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State RPLS signature, seal, and date The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: Location for each control point, showing baseline or centerline alignment and North arrow. Station and offset (with respect to the baseline or centerline alignments) of each identified control point. Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). DocuSign Envelope ID: E7364B4B-1AEE-40DF-BDDE-5670501BD1AD  Date of current adjustment of the datum. DocuSign Envelope ID: 0739EBD5-D505-46CB-B82C-2C058DE86DA5 • Monumentation set for Control (Description, District name/number and Location ties). Surface Adjustment Factor and unit of measurement. Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). Relevant metadata. Graphic (Bar) Scale. Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. RPLS signature, seal and date. The State’s title block containing District Name, County, Highway, and CSJ. b. Construction Surveys The State will request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to the following: i. Stake existing or proposed right-of-ways. ii. Stake existing or proposed baseline/centerline. iii. Stake proposed bridge structures. iv. Stake proposed drainage structures (e.g., manholes, culverts, etc.). v. Set grade stakes. vi. Recover and check existing control points. vii. Establish additional control points. viii. Check elevations and locations of structures. ix. Determine and resolve conflicts associated with survey data.

Appears in 1 contract

Samples: Contract for Surveying Services

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!