Technical Quality of Inspections Sample Clauses

Technical Quality of Inspections. Inspections, both routine and reactive, provide reasonable assurance that licensee activities are carried out in a safe and secure manner. Accompaniments of inspectors performing inspections, and the critical evaluation of inspection records, are used to assess the technical quality of an inspection program.
AutoNDA by SimpleDocs
Technical Quality of Inspections. 15. What, if any, changes were made to your written inspection procedures during the reporting period?

Related to Technical Quality of Inspections

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes.

  • Inspections and Tests 26.1 The Supplier shall at its own expense and at no cost to the Procuring Entity carry out all such tests and/or inspections of the Goods and Related Services as are specified in the SCC.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Technical Feasibility of String While ICANN has encouraged and will continue to encourage universal acceptance of all top-­‐level domain strings across the Internet, certain top-­‐level domain strings may encounter difficulty in acceptance by ISPs and webhosters and/or validation by web applications. Registry Operator shall be responsible for ensuring to its satisfaction the technical feasibility of the TLD string prior to entering into this Agreement.

  • Inspections and Testing Each Interconnected Entity shall perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Customer Facility with the Transmission System in a safe and reliable manner. Each Interconnected Entity shall have the right, upon advance written notice, to request reasonable additional testing of an Interconnected Entity’s facilities for good cause, as may be in accordance with Good Utility Practice.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • SCOPE OF INSPECTION The purpose of the inspection is to report the general condition of the home and identify and disclose major defects and deficiencies of the inspected systems and components which existed at the time of the inspection and which are evident to the inspector upon ordinary visual observation. Minor and cosmetic defects may be listed in the report for maintenance purposes but it is not the intent, nor will the inspection report identify and list all minor and cosmetic defects. The inspection is intended to evaluate systems and components of the primary premises. Included with the inspection is the evaluation of primary attached garages/carports/decks/porches/patios. The inspection does not include evaluation of detached garages/carports/patios/decks or other structures unless explicitly specified. The client is encouraged to accompany the inspector during the inspection. Client participation shall be at the client’s risk for personal injury or damage to person or property for any reason or from any cause. The inspection and report are performed and prepared for the sole, confidential and exclusive use and possession of the client(s). The inspection report is not transferable. Systems and components to be inspected include: exposed and visible foundations and structures, exteriors, roofing, plumbing, electrical, attic, interiors, bathrooms and kitchen, basement and crawlspaces, heating and central air conditioning, and garage or carport. LIMITS OF THE INSPECTION The inspection is limited to the readily accessible and visible systems, equipment and components of the home. The inspector will not dismantle and/or move equipment, systems, furniture, appliances, floor coverings, finished or fastened surfaces or components, personal property or other items to conduct this inspection or otherwise to expose concealed or inaccessible conditions. The inspection will not include destructive testing of any kind.

  • Responsibility for Quality of Materials and Installation Contractor acknowledges that he has full, total, and complete responsibility for providing materials, labor, and all other items necessary for providing the level of quality specified in the Contract Documents. He agrees that this responsibility is indivisible, non-delegable, non- transferable, and not diminished by any inspections provided by the Design Professional or his consulting engineers, nor by any inspections provided by the Owner. In recognition of this, Contractor will prepare for submission and review by the Design Professional, a written program describing the efforts that will be taken to insure the proper quality level is achieved. The program shall be submitted prior to the issuance of a Proceed Order.