Telemetry System. Seller shall be responsible for designing, furnishing, installing, maintaining, testing and operating a real time Telemetry System capable of interconnecting the CAISO-Approved Meter(s) and the Generating Facility’s control system with the CAISO’s Energy Communication Network. The Telemetry System shall be designed in accordance with the CAISO monitoring and communication requirements and must be capable of: (i) Reporting data from each CAISO-Approved Meter; (ii) Providing the status of key control points from the Generating Facility’s control system; (iii) Routing generating unit set points to the Generating Facility’s control system; and (iv) If the Generating Facility is subject to PIRP, communicating availability of the generating units pursuant to Section 3.06(h). The Telemetry System must include a data processing gateway, internet connection, interconnecting cabling and all service agreements required for accessing the CAISO’s Energy Communications Network. The above mentioned connections and data transfer must be included in the systems engineering tasks as a part of the construction of the Generating Facility, and must be fully functional before Initial Operation.
Appears in 2 contracts
Samples: Renewable Power Purchase and Sale Agreement, Renewable Power Purchase and Sale Agreement
Telemetry System. Seller shall be responsible for designing, furnishing, installing, maintainingoperating, maintaining and testing and operating a real time Telemetry System capable of interconnecting the GMS, the CAISO-Approved Meter(s) and the Generating Facility’s control system with the CAISO’s Energy Communication Network. The Telemetry System shall be designed in accordance with the CAISO monitoring and communication requirements and must be capable of:
(i) Reporting data from each CAISO-Approved Meter;
(ii) Providing the status of key control points from the Generating Facility’s control system;
(iii) Routing generating unit set points to the Generating Facility’s control system; and
(iv) If the Generating Facility is subject to PIRP, communicating availability of the generating units Generating Facility pursuant to Section 3.06(h3.08(g). The Telemetry System must include a data processing gateway, internet connection, interconnecting cabling and all service agreements required for accessing the CAISO’s Energy Communications Network. The above mentioned connections and data transfer must be included in the systems engineering tasks as a part of the construction of the Generating Facility, and must be fully functional before Initial OperationSynchronization.
Appears in 2 contracts
Samples: Renewable Power Purchase and Sale Agreement, Renewable Power Purchase and Sale Agreement