Temperature/Relative Humidity Probe Sample Clauses

Temperature/Relative Humidity Probe. The probe cable is attached to a connector on the back of the HVI computer. • Bar Code Reader (if this option is purchased) Connect the bar code reader to the cable labeled COM2 (located in the Micronaire cabinet). The HVI 900 system is now ready for use. Allow the system to warm up for at least four (4) hours before performing calibrations for the first time. After 4 hours, calibrate according to the instructions in this manual. Most cotton standards organizations recommend that the temperature be in the range of 20°C ±2°C (65°F to 72°F) for a testing cotton environment. The relative humidity should be 65%, ±2%. It is suggested that fiber samples be conditioned in the laboratory environment for consistent testing results.
AutoNDA by SimpleDocs
Temperature/Relative Humidity Probe. (optional unit) - The probe cable is attached to a connector on the control board in the Length/Strength cabinet.

Related to Temperature/Relative Humidity Probe

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Work of the      Unit Employees not covered by the terms of this Agreement will not perform duties normally assigned to those employees who are covered by this Agreement, except for the purposes of instruction, experimentation, or in emergencies when regular employees are not readily available.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Rippable Rock Rippable rock is defined as any material that can be ripped with a single-tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.

  • Fire Suppression Costs Purchaser’s obliga- tions for cost of fire suppression vary according to three classifications of fires as follows:

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

Time is Money Join Law Insider Premium to draft better contracts faster.