Temperature Rise Clause Samples

Temperature Rise. Rated temperature rise above 40 degrees C ambient temperature measured by resistance at service factor load of 1.15 shall not exceed 90 degrees C.
Temperature Rise. The winding temperature rise for all motors, when operating at the nameplate horsepower, shall not exceed 80 Degrees Celsius. Where ambient temperatures greater than 40 Degrees Celsius is specified, the temperature rise shall be reduced in accordance with NEMA MG 1.
Temperature Rise. The temperature rise, as determined by resistance, of all motors, shall not exceed the following derated values:- Insulation class E B F H Temperature rise (K) 50 60 80 100
Temperature Rise. During the acceptance tests on the generator a temperature rise test is conducted as close as possible to full load and rated power factor.
Temperature Rise. The winding temperature rise for all motors, when operating at the nameplate horsepower shall not exceed 80 C.

Related to Temperature Rise

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point ▇▇▇▇▇▇. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • DELIVERY PRESSURE ▇▇▇▇▇▇ agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time. 7.1.2 The SPD shall bear all costs pertaining to installation, testing, calibration, maintenance, renewal and repair of meters at SPD’s side of Delivery Point. 7.1.3 In addition to ensuring compliance of the applicable codes, the SPD shall install Main & Check meters at the Delivery Point, along with Stand-by meter(s) as per the applicable Central/State regulations. 7.1.4 In case of pooling of multiple Projects, power from multiple Projects can be pooled at a Pooling Substation prior to the Delivery point and the combined power can be fed at Delivery point through a common transmission line from the Pooling Substation. In such cases, ABT compliant sub-meters as per relevant regulation/approval are also to be set up at pooling substation for individual projects in addition to the meters at Delivery Point as described in clause 7.1.3.