Termination at an Outside Plant Structure Sample Clauses

Termination at an Outside Plant Structure. If CLEC requests UDF-Loop going to an outside plant structure such as a Controlled Environmental Vault (CEV), or Remote Terminal (RT), the Remote Collocation provisions of this Agreement will apply. Qwest will prepare and submit to CLEC a quote along with the original Field Verification Quote Preparation form (FVQP) within the interval set forth in Exhibit C. Quotes are on an Individual Case Basis (ICB) and will include costs and an interval in accordance with Exhibit C.
AutoNDA by SimpleDocs

Related to Termination at an Outside Plant Structure

  • EVENTS OUTSIDE OUR CONTROL 7.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of Our obligations under these Terms that is caused by an Event Outside Our Control.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • Underutilization and Early Termination Charges If Customer's Total Service Charges do not reach the AVC, in any Contract Year during the Initial Term; Customer shall pay an “Underutilization Charge” equal to 50% of the unmet AVC. If Customer’s Total Service Charges do not reach the AVC in any Contract Year because the Agreement is terminated early by Customer without Cause or by the Company with Cause, Customer shall pay an “Early Termination Charge” equal to 50% of the unmet AVC plus a pro rata portion of any credits received by Customer.

  • Terminating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • T ermination In the event that either party seeks to terminate this DPA, they may do so by mutual written consent and as long as any service agreement or terms of service, to the extent one exists, has lapsed or has been terminated. The LEA may terminate this DPA and any service agreement or contract with the Provider if the Provider breaches any terms of this DPA.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • CONTRACT MANAGEMENT AND EARLY TERMINATION 14 8.1 Contract Remedies. 14 8.2 Termination for Convenience 14 8.3 Termination for Cause 14 ARTICLE IX. MISCELLANEOUS PROVISIONS 15 9.1 Amendment 15 9.2 Insurance 15 9.3 Legal Obligations 15 9.4 Permitting and Licensure 16 9.5 Indemnity 16 9.6 Assignments 16 9.7 Independent Contractor 17 9.8 Technical Guidance Letters 17 9.9 Dispute Resolution 17 9.10 Governing Law and Venue 17 9.11 Severability 17 9.12 Survivability 18 9.13 Force Majeure 18 9.14 No Waiver of Provisions 18 9.15 Publicity 18 9.16 Prohibition on Non-compete Restrictions 19 9.17 No Waiver of Sovereign Immunity 19 9.18 Entire Contract and Modification 19 9.19 Counterparts 19 9.20 Proper Authority 19 9.21 E-Verify Program 19 9.22 Civil Rights 19 9.23 System Agency Data 21 v. 2 16.1 Effective 03/26/2019 HHSC Grantee Uniform Terms and Conditions Page 3 of 21

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Effective Date Term Termination and Disconnection 3.1 Effective Date 3.2 Term of Agreement 3.3 Termination

Time is Money Join Law Insider Premium to draft better contracts faster.