The Appeal Description Sample Clauses

The Appeal Description. When the Firm submits an appeal, the Firm must include the original description in the “Description” section so that the Legal Billing Compliance Team can easily identify the line entry appealed. Your Firm’s justification/rationale for the appeal should be included as a “Comment” under the line entry description.
AutoNDA by SimpleDocs

Related to The Appeal Description

  • General Description Employer shall provide Employee with the compensation, incentives, benefits, and business expense reimbursement specified elsewhere in this agreement.

  • ITEM DESCRIPTION Equipment (include VIN, make, model, year, serial no., accessories, or other identifying features): 12. NO. OF OPERATORS PER SHIFT 13. HRLY/ DAILY/ MILEAGE SHIFT BASIS 14. SPECIAL 15. GUARANTEE (8 HOURS) Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $75 Daily Ea. Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $45 Daily Ea. Accessible Portable Toilet Rental – Serviced(Includes first day delivery/last day pickup and daily rental rate per unit) 1 $95 Daily Ea. Accessible Portable Toilet Rental – Unserviced(Rental only, no daily service call) 1 $65 Daily Ea.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Legal Description The real property is a: (check one)

  • Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!