The Energy and Water Sample Clauses

The Energy and Water. Ombudsman You have the right to refer a complaint or dispute arising under this contract to the Energy and Water Ombudsman (EWON). XXXX is an independent dispute resolution body that can investigate and resolve many disputes you have with us under this contract. Disputes that may be referred to EWON include disputes about: supply of service, your account, credit or payment services, restric tion or disconnection. Full details are available from EWON. EWON’s services are available to you without cost. You may choose whether or not to accept XXXX’s decision. If you decide to accept it, then it will be final and binding on us.
AutoNDA by SimpleDocs

Related to The Energy and Water

  • Energy 1. Cooperation shall take place within the principles of the market economy and the European Energy Charter, against a background of the progressive integration of the energy markets in Europe.

  • Air and Water Subrecipient agrees to comply with the following regulations in so far as they apply to the performance of this Contract: Clean Air Act, 42 U.S.C., 1857, et seq. Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251, et seq. Environmental Protection Agency (EPA) regulations pursuant to 00 XXX 00 xxx 00 XXX 00.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Conservation The Contractor agrees to comply with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act.

  • Natural Resources Protecting America’s great outdoors and natural resources.

  • Water Resources Four (4) Union Stewards unless the unit falls below sixty (60) employees and then not more than two (2) Union Stewards.

  • ENERGY POLICY AND CONSERVATION ACT COMPLIANCE To the extent applicable, Supplier must comply with the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act.

  • Energy Policy and Conservation Act Both parties hereby agree to comply with all mandatory standards and policies relating to energy efficiency, which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94-163, 89 Stat. 871).

  • Washtenaw Community College Eastern Michigan University Xxxxxx Xxxxxxxxxx College of Engineering & Technology Student Services BE 214 xxx_xxxxxxxx@xxxxx.xxx; 734.487.8659 734.973.3398

  • COMPLIANCE WITH ENERGY POLICY AND CONSERVATION ACT Contractor certifies that Contractor will be in compliance with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94-163, 89 Stat. 871). Attachment A NorMont Equipment Co. Sewer Cleaning, Hydro-Excavating, Inspection Equipment and Miscellaneous Services Contract No. SC01-21A H-GAC PRODUCT ITEM BASE OFFERING PRICES H-GAC Product Code Description Base Offered Price Envirosight

Time is Money Join Law Insider Premium to draft better contracts faster.