THE WORKS. 1.1 Subject to the terms and conditions set out below, National Grid shall carry out the following as set out in the Order and (if applicable) as varied in accordance with clause 7.1 below (the “Works”): (a) alter the location of the service pipe to the premises specified in the Order (the “Premises”) and commission the altered service pipe; and/or (b) remove and re-fix the meter installation at the Premises, provided that the existing meter installation at the premises is suitable for-fixing at the proposed location; and/or (c) where National Grid has re-fixed the meter installation (where the Customer has requested it); the relocation and reconnection of the meter to the existing installation pipe provided that the length of pipe needed does not exceed the maximum length specified in the Order; and/or (d) supply and fit a meter box (other than a built-in cavity meter box) at the Premises if required; and/or (e) the permanent reinstatement of drives, paths and other surfaces disturbed during the Works; and/or (f) carry out any other works included in the Order; and (g) supply all necessary materials in respect of the above.
Appears in 5 contracts
Samples: Terms and Conditions for Service Alteration, Terms and Conditions for Service Alteration, Terms and Conditions for Service Alteration
THE WORKS. 1.1 Subject to the terms and conditions set out below, National Grid shall carry out the following as set out in the Order and (if applicable) as varied in accordance with clause 7.1 below (the “Works”):
(a) alter the location of the service pipe to the premises specified in the Order (the “Premises”) and commission the altered service pipe; and/or
(b) remove and re-fix the meter installation at the Premises, provided that the existing meter installation at the premises is suitable for-fixing at the proposed location; and/or
(c) where National Grid has re-fixed the meter installation (where the Customer has requested it); the relocation and reconnection of the meter to the existing installation pipe provided that the length of pipe needed does not exceed the maximum length specified in the Order; and/or
(d) supply and fit a meter box (other than a built-in cavity meter box) at the Premises if required; and/or
(e) the permanent reinstatement of drives, paths and other surfaces disturbed by National Grid during the Works; excluding any excavation by the Customer and/or
(f) carry out any other works included in the Order; and
(g) supply all necessary materials in respect of the above.
Appears in 2 contracts
Samples: Terms and Conditions for Service Alteration, Terms and Conditions for Service Alteration
THE WORKS. 1.1 Subject to the terms and conditions set out below, National Grid Cadent shall carry out the following as set out in the Order and (if applicable) as varied in accordance with clause 7.1 below (the “Works”):
(a) alter the location of the service pipe to the premises specified in the Order (the “Premises”) and commission the altered service pipe; and/or
(b) remove and re-fix the meter installation at the Premises, provided that the existing meter installation at the premises is suitable for-fixing at the proposed location; and/or
(c) where National Grid Cadent has re-fixed the meter installation (where the Customer has requested it); the relocation and reconnection of the meter to the existing installation pipe provided that the length of pipe needed does not exceed the maximum length specified in the Order; and/or
(d) supply and fit a meter box (other than a built-in cavity meter box) at the Premises if required; and/or
(e) the permanent reinstatement of drives, paths and other surfaces disturbed during the Works; and/or
(f) carry out any other works included in the Order; and
(g) supply all necessary materials in respect of the above.
Appears in 2 contracts
Samples: Terms and Conditions for Service Alteration, Terms and Conditions for Service Pipe Alteration