Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 2 contracts

Samples: Engineering Services Contract, Engineering Services Contract

AutoNDA by SimpleDocs

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 150 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 42 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 45 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 145 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 75 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 80 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 100 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 90 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 75 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as indicated in Attachment “D” - Design Schedule and as follows: 1. A. Conceptual design plans in 60 125 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 50 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 50 calendar days from acceptance of preliminary design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 90 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 60 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. A. Conceptual design plans in 60 70 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 60 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 28 calendar days from acceptance of preliminary conceptual design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans and drainage study in 60 180 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 150 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceed. N/A 2. Preliminary design construction plans in 210 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 42 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 75 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 45 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 186 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 158 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 102 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City indicated as follows: 1. A. Conceptual design plans in 60 30 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 120 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 120 calendar days from acceptance of preliminary conceptual design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans A. Routing and Alignment Selection and Field Survey Work in 60 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 100 calendar days from acceptance of the conceptual plans routing and alignment selection and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six four (64) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 140 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 119 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 98 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 70 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 45 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 21 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 150 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 90 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 45 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 100 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 97 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 54 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans Design survey and geotechnical services in 60 35 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 77 calendar days from acceptance completion of the conceptual plans and written notice to proceed with preliminary plansdesign survey. 3. Final design construction plans and specifications in 30 28 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 105 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 60 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 120 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 120 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 120 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as indicated in Attachment “B”- Schedule and as follows: 1. Conceptual design plans in 60 A. Phase I Tasks – Preliminary Design and Evaluations: This task will be completed within 63 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 B. Phase II Tasks – Final Design: This task will begin after final acceptance of Phase I engineer’s submittals by the City and will be completed within 49 calendar days from subsequent to final acceptance of the conceptual plans Phase I. C. Bid Phase and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall Construction Phase: Schedule for these items will be returned to the City within six (6) weeks of the determined at a later date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 90 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 100 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 120 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 90 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 120 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans Feasibility Report in 60 30 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 90 calendar days from acceptance of the conceptual plans feasibility report and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 60 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 32. Final design construction plans and specifications in 30 80 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. A. Conceptual design plans in 60 90 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 45 calendar days from acceptance of the conceptual design plans and written notice to proceed with the preliminary plans. 3. C. Final design construction plans and specifications in 30 calendar days from acceptance of preliminary design plans and written notice to proceed with the final plans. Subsequent submittals of final plans shall be returned to the City within six two (62) weeks of the date of the previous review letter. . D. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 63 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 52 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City indicated as follows: 1. A. Conceptual design plans in _60 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 _90 calendar days from acceptance of preliminary conceptual design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 75 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 116 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 37 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 63 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 35 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 35 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 30 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 210 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 120 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 104 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 59 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 33 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six four (64) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceedwill not be required for this project. 2. Preliminary design construction plans in 30 75 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

AutoNDA by SimpleDocs

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 50 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 95 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 70 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans (30%) in 60 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans (60%) in 30 45 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications (90%) in 30 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 70 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 25 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 40 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 14 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 21 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City indicated as follows: 1. A. Conceptual design plans in 60 30 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 90 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary design construction plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 70 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 120 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 90 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 75 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 95 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 60 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 20 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 73 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 42 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 21 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 120 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 165 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 285 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City indicated as follows: 1. A. Conceptual design plans in 60 270 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 150 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 300 calendar days from acceptance of preliminary conceptual design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 _21 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 _14_ calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 _21_ calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 90 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 45 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City indicated as follows: 1. A. Conceptual design plans in 60 15 calendar days from the date of written notice to proceed. 2. B. Preliminary design construction plans in 30 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. C. Final design construction plans and specifications in 30 15 calendar days from acceptance of preliminary conceptual design plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer City has submitted accepted the plans to the Cityas being final. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 70 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 42 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 21 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 105 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 140 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 49 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 210 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 195 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 50 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 127 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 96 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and special specifications in 30 56 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 120 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 60 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 60 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceed. 2. Preliminary design construction plans in 30 80 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 40 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Time for Completion. Engineer agrees to complete and submit all work required by City as follows: 1. Conceptual design plans in 60 calendar days from the date of written notice to proceedare not required for this project. 2. Preliminary design construction plans in 30 180 calendar days from acceptance of the conceptual plans and written notice to proceed with preliminary plans. 3. Final design construction plans and specifications in 30 42 calendar days from acceptance of preliminary plans and written notice to proceed with final plans. Subsequent submittals of final plans shall be returned to the City within six (6) weeks of the date of the previous review letter. Calendar days for each design phase shall commence when Engineer is notified to proceed and shall terminate when Engineer has submitted plans to the City. No extensions of time shall be granted unless a written request is submitted by Engineer, and such request is approved in writing by City.

Appears in 1 contract

Samples: Engineering Services Contract

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!