Timor-Leste Extractive Industry Transparency Initiative Sample Clauses

Timor-Leste Extractive Industry Transparency Initiative. The Contractor shall comply with the Timor-Leste Extractive Industry Initiative (EITI), as amended from time to time.
AutoNDA by SimpleDocs

Related to Timor-Leste Extractive Industry Transparency Initiative

  • Menu of Labour Adjustment Strategies Where a work force reduction is necessary, the following labour adjustment strategies will be considered, as applicable.

  • Red Hat Enterprise Linux Developer Suite Red Hat Enterprise Linux Developer Suite provides an open source development environment that consists of Red Hat Enterprise Linux with built-in development tools, certain Red Hat Enterprise Linux Add-Ons, Red Hat Enterprise Linux for Real Time, Smart Management and access to Software Maintenance, but no Development or Production Support. If you use any of the Subscription Services or Software associated with Red Hat Enterprise Linux Developer Suite for Production Purposes, or use the Red Hat Enterprise Linux Software Subscription entitlement independently, you agree to purchase the applicable number of Units of the applicable Software Subscription. Red Hat does not provide Production Support or Development Support for Red Hat Enterprise Developer Suite.

  • EPP command RTT Refers to “EPP session-­‐command RTT”, “EPP query-­‐command RTT” or “EPP transform-­‐command RTT”.

  • Traditional Medicine Cooperation 1. The aims of Traditional Medicine cooperation will be: (a) to build on existing agreements or arrangements already in place for Traditional Medicine cooperation; and (b) to promote information exchanges on Traditional Medicine between the Parties. 2. In pursuit of the objectives in Article 149 (Objectives), the Parties will encourage and facilitate, as appropriate, the following activities, including, but not limited to: (a) encouraging dialogue on Traditional Medicine policies and promotion of respective Traditional Medicine; (b) raising awareness of active effects of Traditional Medicine; (c) encouraging exchange of experience in conservation and restoration of Traditional Medicine; (d) encouraging exchange of experience on management, research and development for Traditional Medicine; (e) encouraging cooperation in the Traditional Medicine education field, mainly through training programs and means of communication; (f) having a consultation mechanism between the Parties' Traditional Medicine authorities; (g) encouraging cooperation in Traditional Medicine therapeutic services and products manufacturing; and (h) encouraging cooperation in research in the fields of Traditional Medicine in order to contribute in efficacy and safety assessments of natural resources and products used in health care.

  • Development Standards 9.1 Developer shall comply with the requirements contained in the Annexation Agreement and any other duly executed agreement related to the Property, except as specifically amended by this Agreement.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • EPP transform-command RTT Refers to the RTT of the sequence of packets that includes the sending of a transform command plus the reception of the EPP response for only one EPP transform command. It does not include packets needed for the start or close of either the EPP or the TCP session. EPP transform commands are those described in section 2.9.3 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!