Tower Light Controller Penetration Clause Samples
The Tower Light Controller Penetration clause defines the requirements and procedures for any work that involves penetrating or passing through the area where the tower light controller is installed. This typically includes specifications for how such penetrations must be performed to avoid damaging the controller or interfering with its operation, and may require prior approval or inspection by a qualified authority. The core function of this clause is to protect critical electrical or control equipment from accidental damage during construction or maintenance activities, thereby ensuring the continued safe and reliable operation of tower lighting systems.
Tower Light Controller Penetration. There will be a 1-1/2" penetration cast in place near the waveguide entry port to allow for connection of the tower light controller. The penetration will be lined with a 1" PVC running thread to provide isolation between the interior and exterior conduit. The running thread will be connected to interior and waterproof exterior 6" x 6" junction boxes.
