Common use of Traffic Control and Safety Clause in Contracts

Traffic Control and Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person verified by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designee. The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 2 contracts

Samples: Land Use Permit, Land Use Permit

AutoNDA by SimpleDocs

Traffic Control and Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the district administrator’s designee, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-sitepossession. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person verified accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the district administrator’s designee will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices and is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the district administrator’s designeeControl Devices (MUTCD). The permittee shall immediately correct any situation that may arise as a result of these activities that the district administrator’s designee deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the district administrator’s designee. All signs Traffic shall not be blocked or detoured without permission, documented in accordance with writing or electronic communication, being granted by the current edition of the Manual of Uniform Traffic Control Devices (MUTCD)district administrator’s designee. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 1 contract

Samples: Land Use Permit

AutoNDA by SimpleDocs

Traffic Control and Safety. The permittee shall at all times give strict attention to the safety and rights of the traveling public, their employees, and contractors. Any permit may be revoked or suspended when in the opinion of the local district administrator’s designeepermit office, the safety, use or maintenance of the highway so requires. In accordance with the Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14, all activities performed under the auspices of a VDOT Land Use Permit involving the installation, maintenance and removal of work zone traffic control devices must have at least one (1) person on-site who, at a minimum, is accredited by VDOT in Basic Work Zone Traffic Control. The accredited person must have their VDOT Work Zone Traffic Control accreditation card in their possession while on-site. A person accredited by VDOT in Intermediate Work Zone Traffic Control must be on-site to provide supervision for adjustment to the approved layout or implementation of any standard Typical Traffic Control (TTC) layouts outlined in the Virginia Work Area Protection Manual. All traffic control plans shall be prepared by a person verified accredited by VDOT in Advanced Work Zone Traffic Control. All activities that require the disruption (stoppage) of traffic shall utilize VDOT certified flaggers. Flag persons shall be provided in sufficient number and locations as necessary for control and protection of vehicular and pedestrian traffic in accordance with the Virginia Work Area Protection Manual. All flaggers must have their certification card in their possession when performing flagging operations within state maintained right-of-way. Any flag person found not in possession of his/her certification card shall be removed from the flagging site and the local district administrator’s designee permit office will suspend all permitted activities. Any VDOT certified flag person found to be performing their duties improperly shall have their certification revoked. The permittee shall be exempt from the requirements of Virginia Department of Transportation (VDOT) Road and Bridge Specification, Special Provision 105.14 if the authorized activity does not involve the installation, maintenance and removal of work zone traffic control devices is not within the roadway (as defined in 24VAC30-151) of a state maintained highway. Traffic shall not be blocked or detoured without permission, documented in writing or electronic communication, being granted by the local district administrator’s designeepermit office. The permittee shall immediately correct any situation that may arise as a result of these activities that the local district administrator’s designee permit office deems hazardous to the traveling public. During authorized activities, the permittee shall furnish all necessary signs, flag persons and other devices to provide for the protection of traffic and workers in accordance with the Virginia Work Area Protection Manual or as directed by the local district administrator’s designeepermit office. All signs shall be in accordance with the current edition of the Manual of Uniform Traffic Control Devices (MUTCD). The local district permit office may require the issuance of a single use permit when utility tree trimming operations associated with the maintenance of overhead utility lines impedes highway travel and/or requires the implementation of traffic control. All lane or shoulder closures on highways in the Northern Virginia construction district classified as arterial or collector routes must be authorized, documented in writing or by electronic communication by the VDOT Transportation Operations Center (NRO/TOC). The permittee shall notify the following appropriate VDOT Transportation Operations Center (TOC) 30 minutes prior to the installation of a lane closure or shoulder closure on non-limited access primary routes and within 30 minutes of removing the lane or shoulder closure: Eastern Region (000) 000-0000: All localities within the Hampton Roads construction district excluding Greenville County and Sussex County Northern Virginia (000) 000-0000: All localities within the NOVA construction district including Spotsylvania County and Xxxxxxxx County Central Region (000) 000-0000: All localities within the Richmond construction district including Greenville County and Sussex County. All localities within the Fredericksburg district excluding Spotsylvania County and Xxxxxxxx County SW Region (000) 000-0000: All localities within the Salem, Bristol, and Lynchburg construction districts NW Region (000) 000-0000: All localities within the Staunton and Culpeper construction districts

Appears in 1 contract

Samples: Land Use Permit

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!