Traffic Regulation. 16.1 Traffic regulation by the Contractor
(i) The Contractor shall take all the required measures and make arrangements for the safety of Users during the Construction and Maintenance of the Project Highway or a Section thereof in accordance with the provisions of MORTH Specifications. It shall provide, erect and maintain all such barricades, signs, markings, flags, and lights as may be required by Good Industry Practice for the safety of the traffic passing through the Section under construction or maintenance.
(ii) All works shall be carried out in a manner creating least interference to traffic passing through the Project Highway or a Section thereof. In sections where construction or maintenance Works on the carriageway are taken up, the Contractor shall ensure that proper passage is provided for the traffic. Where it is not possible or safe to allow traffic on part width of the carriageway, a temporary diversion of proper specifications shall be constructed by the Contractor at its own cost. ‘ROBOTS’ may be used for diversion and control of traffic during Construction. The Contractor shall take prior approval of the Authority’s Engineer for any proposed arrangement for traffic regulation during Construction and Maintenance, which approval shall not be unreasonably withheld.
Traffic Regulation. 16.1 Traffic regulation by theContractor (i) The Contractor shall take all the required measures and make arrangements for the safety of Users during the Construction and Maintenance of the Project Highway or a Section thereof in accordance with the provisions of MORTH Specifications. It shall provide, erect and maintain all such barricades, signs, markings, flags, and lights as may be required by Good Industry Practice for the safety of the traffic passing through the Section under construction ormaintenance. (ii) All works shall be carried out in a manner creating least interferenceto traffic passing through the Project Highway or a Section thereof. In sections where construction or maintenance Works on the carriageway are taken up, the Contractor shall ensure that proper passage is provided for the traffic. Where it is not possible or safe to allow traffic on part width of the carriageway, a temporary diversion of proper specifications shall be constructed by the Contractor at its own cost. ‘ROBOTS’ may be used for diversion and control of traffic during Construction. The Contractor shall take prior approval of the Authority’s Engineer for any proposed arrangement for traffic regulation during Construction and Maintenance, which approval shall not be unreasonablywithheld. Contract AgreementPage 97 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022 Article 17 Defects Liability 17.1 Defects LiabilityPeriod (i) The Contractor shall be responsible for all the Defects and deficiencies, except usual wear and tear in the Project Highway or any Section thereof, till the expiry of a period of commencing from the date of Completion Certificate (the “Defects Liability Period”) as specifiedbelow: (a) 5 (five) years from the date of completion in case of a road being constructed with flexiblepavement; (b) 10 (ten) years from the date of completion in case of road being constructed with rigidpavement; (c) 10 (ten) years from the date of completion in case of road being constructed with flexible pavement using perpetualdesign; (d) 10 (ten) years from the date of completion in case of all stand-alone structures, e...
Traffic Regulation. Regulate all traffic within and adjacent to the Premises, including the operation and parking of Concessionaire’s vehicles and those of its invitees, employees, and patrons;
Traffic Regulation. City may regulate all traffic within and adjacent to the Premises, including the operation and parking of vehicles of Lessee and its invitees, employees, and patrons.
Traffic Regulation. A. Parking: Provide and maintain suitable parking areas for the use of all construction workers and others performing work or furnishing services in connection with the Contract, to avoid any need for parking personal vehicles where they may interfere with public traffic or construction activities.
Traffic Regulation. Drafit Contract Agreement
Traffic Regulation. ( 20.1 Traffic regulation by the Concessionaire 1 The Concessionaire shall regulate traffic on the Project Highway in accordance with I \ the Applicable Laws, and subject to the supervision and control of the State authorities or a substitute thereof empowered in this behalf under the Applicable <y Laws.
Traffic Regulation. 1. Regulate traffic as required by the City of San Xxxx Department of Public Works "Standard Specifications" General Provisions, dated July 1992. Applicable articles for airport access gate control and escort is contained in this Section. Submit the Traffic Plan as required.
2. Personal Vehicles: All construction personnel's private vehicles are restricted from operation in the AOA. 3. Provide parking areas for Construction personnel use.
Traffic Regulation. 14.1 Traffic regulation by the Contractor
14.1.1 The Contractor shall take all the required measures and make arrangements for the safety of any persons or Users and vehicles on or about the Site during the construction of the Project or a section thereof in accordance with Good Industry Practice, and Applicable Laws. It shall provide, erect and maintain all such barricades, signs, markings, flags, and lights as may be required by Good Industry Practice for the safety of the traffic using any public roads or access along or across the Project Site under construction.
14.1.2 All works shall be carried out in a manner creating least interference to traffic passing along or across the Project. The Contractor shall ensure that proper passage is provided for the traffic. Where it is not possible or safe to allow traffic on the existing road or passage, a temporary diversion of proper specifications shall be constructed by the Contractor at its own cost. The Contractor shall take prior approval of the Authority Engineer for any proposed arrangement for traffic regulation during Construction, which approval shall not be unreasonably withheld.
14.1.3 In the event any construction work is required to be executed in close proximity of an existing operating system of Railways, the Contractor shall make arrangements for the safety of such system in accordance with the provisions of the ‘Compendium of Instructions on Safety at work Sites’ issued by the Authority and Good Industry Practice.
Traffic Regulation. 16.1 Deleted