TRANSMISSION AND ROUTING OF SWITCHED ACCESS Sample Clauses

TRANSMISSION AND ROUTING OF SWITCHED ACCESS. TRAFFIC PURSUANT TO 251(c)(2)
AutoNDA by SimpleDocs
TRANSMISSION AND ROUTING OF SWITCHED ACCESS. TRAFFIC PURSUANT TO 251(c)(2) 7.9.1 SBC-13STATE shall provide to CLEC certain trunk groups (Meet Point Trunks) under certain parameters pursuant to the applicable Appendix ITR, which is/are attached hereto and incorporated herein by reference.
TRANSMISSION AND ROUTING OF SWITCHED ACCESS. TRAFFIC PURSUANT TO 251(c)(2) 7.9.1 AM-IN shall provide to TWTC certain trunk groups (Meet Point Trunks) under certain parameters pursuant to the applicable Appendix ITR, which is attached hereto and incorporated herein by reference.

Related to TRANSMISSION AND ROUTING OF SWITCHED ACCESS

  • Transmission encryption All data transmissions of County PHI or PI outside the secure internal network must be encrypted using a FIPS 140-2 certified algorithm which is 128bit or higher, such as AES. Encryption can be end to end at the network level, or the data files containing PHI can be encrypted. This requirement pertains to any type of PHI or PI in motion such as website access, file transfer, and E-Mail.

  • Transmission Delivery Service Implications Under ER Interconnection Service, Interconnection Customer will be eligible to inject power from the Generating Facility into and deliver power across the Transmission System on an “as available” basis up to the amount of MW identified in the applicable stability and steady state studies to the extent the upgrades initially required to qualify for ER Interconnection Service have been constructed. After that date FERC makes effective MISO’s Energy Market Tariff filed in Docket No. ER04-691-000, Interconnection Customer may place a bid to sell into the market up to the maximum identified Generating Facility output, subject to any conditions specified in the Interconnection Service approval, and the Generating Facility will be dispatched to the extent the Interconnection Customer’s bid clears. In all other instances, no transmission or other delivery service from the Generating Facility is assured, but Interconnection Customer may obtain Point-To-Point Transmission Service, Network Integration Transmission Service or be used for secondary network transmission service, pursuant to the Tariff, up to the maximum output identified in the stability and steady state studies. In those instances, in order for Interconnection Customer to obtain the right to deliver or inject energy beyond the Point of Interconnection or to improve its ability to do so, transmission delivery service must be obtained pursuant to the provisions of the Tariff. The Interconnection Customer’s ability to inject its Generating Facility output beyond the Point of Interconnection, therefore, will depend on the existing capacity of the Transmission or Distribution System as applicable, at such time as a Transmission Service request is made that would accommodate such delivery. The provision of Firm Point-To-Point Transmission Service or Network Integration Transmission Service may require the construction of additional Network or Distribution Upgrades.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!