Updating Base Case Sample Clauses

Updating Base Case. (a) The Base Case will be adjusted, on Financial Close, in accordance with Schedule 4 (Financing).
AutoNDA by SimpleDocs

Related to Updating Base Case

  • Inspection Report The Client and the Company agree that the Company, and its inspector(s), will prepare a written home inspection report which shall:

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Inspection Checklist (check one) ☐ In order to avoid disagreements about the condition of the Premises, at the time of accepting possession of the Premises, Tenant will complete the Inspection Checklist incorporated herein by reference and attached hereto as Exhibit B and record any damage or deficiencies that exist at the commencement of the Term. Landlord will be liable for the cost of any cleaning or repair to correct damages found at the time of the inspection. Tenant will be liable for the cost of any cleaning and/or repair to correct damages found at the end of the Term if not recorded on the inspection checklist, normal wear and tear excepted. ☐ The Tenant is NOT required to complete an inspection checklist.

  • Update Each year the Plant Training Committee shall prepare an Update that reviews the Findings and modifies them based on changed circumstances, measures the success of the Training Program against its objectives and modifies the Training Program accordingly.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Evaluation Report 20.5.4.1 The summary evaluation report shall be prepared by the Faculty Evaluation Committee and administrative evaluator(s) and shall include each evaluator’s individual rating. The summary evaluation report shall take into account the results of each of the evaluation components (Section 20.5.3) in order to arrive at an overall rating. When the committee and the administrative evaluator(s) cannot reach an agreement as to the overall rating, the report must include written explanation.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Inspection Reports A "full inspection report" comprises a Site Master File (compiled by the manufacturer or by the inspectorate) and a narrative report by the inspectorate. A "detailed report" responds to specific queries about a firm by the other Party.

  • Vehicle Base Specifications Note: The actual vehicle awarded may exceed the minimum specifications stated below. The Authorized User may elect to add additional Options, delete Options, or substitute a vehicle feature that is an Option with another Option. See Contract Section III.6